HomeMy WebLinkAboutDOE5_NOA_Project_Acceptance_220316DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION AND PROPOSED
DETERMINATION OF NON-SIGNIFICANCE (DNS)
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals.
DATE OF NOTICE OF APPLICATION: March 16, 2022
PROJECT NAME/NUMBER: Kejriwal Boat Lift / LUA22-000083, ECF, SSDP
PROJECT LOCATION: 4125 Williams Ave N (APN 0518500360)
APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Group / 7413 Greenwood
Ave N, Seattle WA 98104 /
evan@ecodesigninc.com
LOCATION WHERE APPLICATION MAY BE
REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/BSyqzzk
PROJECT DESCRIPTION: The applicant is requesting a Shoreline Substantial Development Permit and
Environmental (SEPA) Review for the installation of a new boat lift for the property owners of 4125 Williams Ave North
on an existing community dock within the Barbee Mill development. The project site and adjacent properties are zoned
as R-10. The site is on the shoreline of Lake Washington (Reach C) within the Shoreline Residential and Aquatic
designations. The shoreline is armored with a concrete bulkhead. The proposed boat lift would be located approximately
128’ waterward of the ordinary high water mark on the south side of the pier. The boat lift would be 10’-9” wide by 13’-
5” long. The bunk of the boat lift would extend 18” above the ordinary high water mark and the lift will sit on the lake
bed of Lake Washington on foot pads that are 12” by 18”. The lake bed consists mostly of sand and gravel where the lift
will be located. No dredging, fill, or excavation would be done for the project.
DATE OF APPLICATION: March 14, 2022
NOTICE OF COMPLETE APPLICATION: March 16, 2022
OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that
significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the
RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued.
Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no
comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only
opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance
of the DNS.
PERMITS/REVIEW REQUESTED: Shoreline Substantial Developmnet Permit and Environmental (SEPA) Review
NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must
fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning
Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000081 Kejriwal Boat Lift / LUA22-000083, ECF, SSDP
Name: __________________________________ Email: _______________________ Phone No. ___________________
Mailing Address: __________________________________City/State/Zip: _____________________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit
REQUESTED STUDIES: Lake Study
CONSISTENCY OVERVIEW:
Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of
Renton Comprehensive Land Use Map and Residential-10 (R-10) on the
City’s Zoning Map.
Environmental Documents that
Evaluate the Proposed Project:
Environmental (SEPA) Checklist
Development Regulations Used For
Project Mitigation:
The project will be subject to the City’s SEPA ordinance, Shoreline Master
Program (RMC 4-3-090) and other applicable codes and regulations as
appropriate.
Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.
Comments on the above application must be submitted in writing by 5:00 PM on April 15, 2022. Per RMC 4-9-190.E.6,
a thirty (30) day public comment is required for all Shoreline Development Permit applications. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton,
CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA)
or project address in your comments. Anyone who submits written comments will automatically become a party of
record and will be notified of any decision on this project.
CONTACT PROJECT PLANNER: Jill Ding, Senior Planner; Tel: (425) 430-6598; Email: jding@rentonwa.gov