Loading...
HomeMy WebLinkAboutMFP22002425.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22002425 IVR Number: 22002425 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:05/08/2022Application Date:1023059124Parcel Number: 1075 DUVALL AVE NE Permit Type:05/26/2022Issue Date:Franchise Permit Work Class:05/26/2023Expiration Date:Minor Utility Job Number: 108137064Franchise Type:Electric Description: Puget Sound Energy Electric OH Wreckout of 4 existing distribution poles at p01 (318613 167290), p02 (318603 167290), p03 (318591 167290), p04 (318566 167290) and 4 OH distribution spans. Access is from Chelan Ave NE. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL RENTON SCHOOL DISTRICT NO 4 300 SW 7TH ST RENTON, WA 98057 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 108137064 1075 DUVALL AVE NE JENNY.CHAU@PSE.COM 253-208-9480 MFP22002425 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 5/26/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P01 P02 P03 P04 P05CHELAN AVE NE(PRIVEATE ROAD)NE 12TH ST SHOULDERWORKW21-5100'100'ROADWORKAHEADW20-18 8 STREETCLOSED BARRICADER11-2 LEGEND 28" TRAFFIC CONE SIGN LOCATION TRAFFIC FLOW POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m.Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 04/21/2022 512842205 0 1051 CHELEAN AVE NE, RENTON, WA 98059. John Crofoot 425-424-6658 John.Crofoot@PSE.com 1 OF 1 Puget Sound Energy Traffic Control Supervisor: John Crofoot Card No. 012613 Card Exp. 10/31/24 John.Crofoot@pse.com (425)424-6658 SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 MFP22002425 1138 1146 1128 1102 1070 1058 1136 1137 1123 1103 1051 1045 1033 1021 1039 1027 1024 1017 1018CHELAN AVE NE318543-167290 15 kVA (C) 318566-167290 25 kVA (C) 318591-167290 25 kVA (C) 318603-167290 318543-167275 CHELAN AVE NEROW 45' 318519-167290 37.5 kVA (C) X10675 (ERROR-SET FUSE) 318613-167290 25 kVA (C) ROW 30' N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Renton School District 300 SW 7th St Renton, WA 98059 Taylor Vanderkley 206-436-0402 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"108137064THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 108137064512842205 JOB SITE ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE PRE-14 6/2020 391 443 417 --- 391 443 417 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP SIGNATURE JENNY CHAU 253-208-9480 J. FELLER 253-204-1990 4/7/22 J. FELLER - RW-RENTON RENTON ELEMENTARY SCHOOL #16 1Ø OH WRECKOUT CHELAN AVE NE AND NE 10TH ST N/A N/A N/A 108137064 AS NOTED 1/1 KING COUNTY N/A N/A CSPSKEPM T23N.R05E.S17 N/A N/A 2305E065 2305E088 2305E065 PRE-14 CenturyLink N/A N/A Comcast/Xfinity N/A N/A PSE - Gas N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A CIRCUIT FEED REMOVED: 680' 00 1"2" 00 50'100' N/A N/A N/A N/A N/AN/A E-Mail: Cell Phone: Project Manager Contact Information: Manager: Jenny.Chau@pse.com 253-208-9480 Jenny Chau REMOVAL SITE PLAN SCALE: 1" = 50' POWER GENERAL NOTES - COMMERICAL PROJECT 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. 5.SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. 6.Roads shall be paved or have a compacted , crushed rock base in place. 7.CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. 8.All work is to be done in accordance with local municipal and county permit requirements as applicable. 9.Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. 10.Inclement weather conditions may cause delays in construction times and dates. 11.EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. REMOVAL SITE NOTES: AT P01 GRID# 318613-167290: REMOVE - REMOVE 25KVA OH TRF 120/240V & RETURN TO PSE YARD - REMOVE ALL PSE EQUIPMENT & DOWN GUY - REMOVE 40' CL.4 POLE (1962) AT P02 GRID# 318603-167290: REMOVE - REMOVE ALL PSE EQUIPMENT - REMOVE 45' CL.3 POLE (1965) AT P03 GRID# 318591-167290: REMOVE - REMOVE 25KVA OH TRF 120/240V & RETURN TO PSE YARD - REMOVE ALL PSE EQUIPMENT - TEL. OWNED POLE TO BE REMOVED BY COMCAST AT P04 GRID# 318566-167290: REMOVE - REMOVE 25KVA OH TRF 120/240V & RETURN TO PSE YARD - REMOVE ALL PSE EQUIPMENT - TEL. OWNED POLE TO BE REMOVED BY COMCAST AT P05 GRID# 318543-167290: EXISTING - EXISTING 40' CL.4 POLE TO REMAIN - INSTALL (1) 12" SINGLE HELIX ANCHOR, LEAD = 10' N (6012.1000; ANDH1) - INSTALL (1) 3/8" PRIMARY DOWN GUY TO NEW ANCHOR (6013.0100; GYD3SA) - INSTALL (1) 3/8" NEUTRAL DOWN GUY TO NEW ANCHOR (6013.0100; GYD3SAN) Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P03 318591-167290 25KVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P04 318566-167290 25KVA Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318613-167290 25KVA POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 318613-167290 40 4 1962 P02 318603-167290 45 3 1965 P03 318591-167290 40 3 1965 P04 318566-167290 40 3 1972 WIRE REMOVAL TABLE Location Wire Size & Type Quantity Length (per conductor)RemarksFromTo P01 P02 #4 ACSR 2 120' P02 P03 #4 ACSR 2 100' P02 P03 OH SEC. TPLX 1 100' P03 P04 #6 CU 2 230' P04 P05 #6 CU 2 230' Total Feet 1Ø PRI OH w/ Nuetral Removed: 680' Total Feet SEC TPLX. Removed: 100' SPAN REMOVAL NOTES: - REFER TO SITE PLAN, TABLES, & ONE-LINE DIAGRAMS FOR REMOVALS TRF. Removal OH Misc. JOB SITE UNDERGROUND CIRCUIT MAP SCALE: 1" = 100' OVERHEAD CIRCUIT MAP SCALE: 6"=1mi JOB SITE 583069478 593244469 N/A N/A MFP22002425 RESTORATION PER CITY OF RENTON STANDARDS