Loading...
HomeMy WebLinkAboutCM_Hazardous Materials Management Statement_220419_v1 105 South Main Street, Suite 323 | Seattle, WA 98104 | 206.624.4222 p | HR@RolludaArchitects.com e | www.RolludaArchitects.com w Page 1 of 1 HAZARDOUS MATERIALS MANAGEMENT STATEMENT King County Solid Waste Division (KCSWD) Interim Maintenance Facility Improvements at Farwest 201 SW 34th St #4939, Renton, WA 98057 April 12, 2022 Description of refueling of construction vehicles that will occur on the site and an inventory of hazardous materials expected to be temporarily stored, dispensed, used, or handled on the site. Response: No construction vehicles are anticipated to refuel at the project site. Hazardous materials will not be stored, dispensed, used or handled on the site during construction. Project site is outside of all mapped Aquifer Protection Areas. b. A description of how the requirements in RMC 4-4-030C7, Construction Activity Standards – Zones 1 and 2, will be met by the applicant. (Ord. 4851, 8-7-2000; Amd. Ord. 4992, 12-9-2002) Response: The proposed scope is anticipated to have minimal construction-related impacts. The site is prepared, with no proposed improvements to non-asphalted areas, thus effectively removing erosion issues and minimizing hauling requirements. Existing site access points and vehicle transportation routes will be utilized. Construction activities shall be restricted to 7am-8pm M-F, 9am-8pm on Saturdays, as required by RMC 4-4-030C7. If hauling is needed, hours shall be restricted to between 8:30 and 3:30 M-F as required by RMC 4-4- 030C7.