Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutLUA82-058 1
, „ ,
, /7 - N' `\\-- -
I /* „....„ „, . ,
, 1 -„. -,,
. t ,
\-\\\., , ,. , , . . ,
- a , -.4.b.
464_0„, , _NN......,....... 1 N -N4*,..
.. , .
// / _ . ..
_ „.. .
... *,,p., ,,, abN .
/ ,
ala.. �� ♦ `` / ems...: .1'
- - --
MIMMUlli
IBM . ....,... .mm•
NO RAILWAY RAW
PUGET 5OU ELEC
"' UNION PACIFIC)
pP,EiF►G RA1 A�
AGO MI WAUKEE ST PAUL 6
aramie�ar rmnd11a.0 t 1l�'�`- t -EAT NQf miL," tit -Y ,
P-I Ci.-„110vivE
1- f ,
- I 1
-
wa .
•
•Ilk . ��na illi •010--Aik -
II 1 ( 0 .
1v w 6t k
\ . ••
\ '_ 1
..c. •
BEGINNIi461
• OF FILE
FILE TITLE MICROFILMED
5
it 8 -i•86
OF R�.-v
�► ,g,ile o, ° THE CITY OF RENTON
,/•t� XLM'' MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON,WASH.98055
0 4 rr ° BARBARA Y. SHINPOCH, MAYOR • LAND USE HEARING EXAMINER
09
FRED J. KAUFMAN. 235-2593
01'4).'ep SEPT°O�Q
September 21 , 1982
Mr. John Rabel
Star Machinery Company
P.O. Box 3595
Seattle, WA 98124
RE: File No. SA-058-82; Star Machinery Company.
Dear Mr. Rabel :
The Examiner's Report regarding the referenced application which
was published on September 1 , 1982 has not been appealed within
'the14-day period established by ordinance. Therefore, this
matter is considered final and is being transmitted to the City
Clerk this date for filing.
Please feel free to contact this office if further assistance or
information is required.
Very truly yours ,
Fred J . Ka man
Hearing Examiner
cc: City Clerk
Building & Zoning Department
AFFIDAVIT OF SERVICE BY MAILING
State of Washington)
County of King )
Marilyn J . Petersen , being first duly sworn, upon oath
disposes and states:
That on the 1st day of September , 19 82 � affiant
deposited in the mails of the United States a sealed envelope containing
a decision or recommendation with postage prepaid, addressed to the
parties of record in the below entitled application or petition.
/-:./2-?;) .
Subscribed and sworn this / ay of 19 e .
�/. Ge --
Notary Public in and for th .State:.f ."
Washington, residing at
Application, Petition or Case: Star Machinery Company; SA-058-82
(Tlr.e mc..nutez cow.1:a(in cc .e,at 0 .the pa.fl.:1;c;.c6 co,c Ae.coad. I
September 1 , 1982
OFFICE OF THE LAND USE HEARING EXAiINER
CITY OF RENTON
REPORT AND DECISION.
APPLICANT: Star Machinery Company FILE NO. SA-058-82
LOCATION: 4202 West Valley Road
SUMMARY OF REQUEST: The applicant requests site approval for the installment of
two mobile office structures and the addition of an office
on the mezzanine of an existing building.
SUMMARY OF ACTION: Building & Zoning Department Recommendation: Approval with
conditions.
Hearing Examiner Decision: Approval with conditions.
BUILDING & ZONING The Building & Zoning Department report was received by the
DEPARTMENT REPORT: Examiner on August 17, 1982.
PUBLIC HEARING: After reviewing the Building & Zoning Department report,
examining available information on file with the application,
and field checking the property and surrounding area, the
Examiner conducted a public hearing on the subject as follows:
The hearing was opened on August 24, . 1982, at 9: 5 a.m. in the Council Chambers of the
Renton Municipal Building. Parties wishing to testify were affirmed by the Examiner.
Roger Blaylock, Zoning Administrator, presented the Building & Zoning Department report,
and entered the following exhibits into the record:
Exhibit #1 : Application File containing Building & Zoning
Department report and other pertinent documents
Exhibit #2: Site Plan
Exhibit #3: Section of Zoning Map
The Examiner questioned the intent of the language contained in Section L.6 of the staff
report which refers to completion of all provisions of the existing bulk storage permit
(including landscaping) . Hr. Blaylock clarified that compliance with certain landscaping
requirements had not been completed immediately after approval of the original proposal ;
however, at this point, the matter appears to be resolved.
The Examiner requested testimony by the applicant. Responding was:
John Rebel
President, Star Machinery Company
P.O. Box 3595
Seattle, WA 98124
The purpose of the request was described by the applicant, who indicated that as a result
of two factors: the U. S. Postal Service has leased the company's other facility in
Seattle, and personnel has been reduced by half from employment levels two years ago, the
continuing operations can be adequately served by the current facility on the subject
site with the addition of two temporary office structures. If recovery of the
distribution division of the company occurs in the future, the two acre portion at the
eastern end of the subject site will be developed; however, drainage problems must be
resolved and modification of S.W. 43rd Street must be complete prior to development of
that portion, which will accommodate offices to replace temporary facilities. Mr. Rabel
requested expeditious publication of a decision regarding the matter due to immediate
needs of the post office to relocate.
The Examiner noted for the record that no other parties were in attendance to testify
either in support or opposition to the proposal . Since no further comments were offered,
the hearing regarding File No. SA-058-82 was closed by the Examiner at 9:41 a.m.
SA-058-82 Page Two
FINDINGS, CONCLUSIONS & DECISION: Having reviewed the record in this matter, the Examiner
now makes and enters the following:
FINDINGS:
1 . The applicant, Star Machinery Company, filed a request for a site plan approval to
permit modification of existing structures and additions to the existing site plan.
2. The application file containing the application, SEPA documentation, the Building
and Zoning Department report, and other pertinent documents was entered into the
record as Exhibit #1 .
3. Pursuant to the City of Renton's Environmental Ordinance and the State Environmental
Policy Act of 1971 , RCW 43.21C, as amended, the subject proposal has been determined
exempt from the threshold determination by the Environmental Review Committee (ERC) ,
responsible official .
4. Plans for the proposal have been reviewed by all city departments affected by the
impact of this development.
5. There was no opposition to the proposal expressed.
6. The subject site is located at 4202 West Valley Road. The site is relatively level
and an existing heavy equipment sales and maintenance facility is located at the west
end of the site along the roadway.
7. The site was annexed into the city in April of 1959 by Ordinance No. 1745. The site
was classified M-P . (Manufacturing Park) in May of 1977 by Ordinance No. 3134. Site
approval to construct the current building and associated parking was approved in 1978.
8. The Comprehensive Plan designates the subject site for manufacturing park uses. The
site is currently zoned M-P.
9. The general area is in transition from undeveloped to manufacturing, warehousing and
industrial uses.
Similar operations are located north of the site, while the Puget Power transmission
line is located to the east as is the railroad right-of-way. There are some older
single family homes located to the south.
10. The subject site is approximately five acres in area. The existing structures and
storage areas require 82 parking stalls while the applicant provides two more than
are necessary by providing 84 stalls.
11 . The proposed additions consist of two 24 by 60-foot mobile office structures totaling
2,800 square feet and the addition of a mezzanine office of approximately 4,000 square
feet. The additions will require 31 additional stalls.. The applicant has provided
114 stalls, one more than required.
12. The staff recommends that the structures be harmonious with the existing facility
and that the site be landscaped pursuant to the provisions of the manufacturing park
zone. •
The applicant must comply with all provisions of the bulk storage permit under which
it is currently operating.
13. The applicant proposes consolidating outlying operations at the site.
CONCLUSIONS:
1 . The subject proposal appears to serve the public use and interest. The existing use
of the property is in conformance with the Comprehensive Plan which designates the
area in which the subject site is located as suitable for manufacturing type uses.
The storage and maintenance shops are compatible.
2. The expansion will permit the applicant to consolidate its various operations in the
outlying area at the Renton site and will provide suitable and required parking and
landscaping on the site.
3. The mobile office structures should have an exterior appearance which blends with the
existing uses on the site to provide continuity with the existing uses and fidelity
to the Comprehensive Plan for the Green River Valley.
4. The proposal must satisfy all existing codes and regulations of the city in regards
to fire flow and hydrant location and sewerage method.
SA-058-82 Page Three
DECISION:
The site plan is approved as indicated above.
ORDERED THIS 1st day of September, 1982.
VOA^
Fred J. Kau an \r"---
Land Use He ing Examiner
TRANSMITTED THIS 1st day of September, 1982 by Affidavit of Mailing to the
party of record:
John Rabel , Star Machinery Co. , P.O. Box 3595, Seattle, WA 98124
TRANSMITTED THIS 1st day of September, 1982 to the following:
Mayor Barbara Y. Shinpoch
Councilman Richard M. Stredicke
Richard Houghton, Public Works Director
David Clemens , Policy Development Director
Members , Renton Planning Commission
Ron Nelson, Building & Zoning Director
Roger Blaylock, Zoning Administrator
Lawrence J. Warren, City Attorney
Renton Record-Chronicle
Pursuant to Title IV, Section 3015. of the City's Code, request for reconsideration must
be filed in writing on or before September 15, 1982. Any aggrieved person feeling that
the decision of the Examiner is based on erroneous procedure, errors of law or fact,
error in judgment, or the discovery of new evidence which could not be reasonably
available at the prior hearing may make a written request for review by the Examiner
within fourteen (14) days from the date of the Examiner's decision. This request shall
set forth the specific errors relied upon by such appellant, and the Examiner may, after
review of the record, take further action as he deems proper.
An appeal to the City Council is governed by Title IV, Section 3016, which requires that
such appeal be filed with the City Clerk accompanying a filing fee of $25.00 and meeting
other specified requirements. Copies of this ordinance are available for inspection or
purchase in the Finance Department, first floor of City Hall .
•
•
m UILIIDING AND ZONING DEPARTMENT
PRELIMINARY ARY R r.IRT TO THE :;r/\ I NG EXAMINER
PUBLIC HEARING
AUGUST 24, 1982
APPLICANT: STAR MACHINERY COMPANY •
FILE NUMBER: SA-058-82
•
A. 5::,"tb,;i,,„''r & . t'IMPOSE OF m*ir S'T:
The applicant requests site approval for the installment
of two mobile office structures and the addition of
an office on the. mezzanine of an existing building.
B. GENERAL INFO" T'ION:
1 . Owner of Record: . JOHN B. RABEL
2. Applicant: STAR MACHINERY COMPANY
3. Location:
(Vicinity Map Attached) 4202 W. Valley Road. •
4 . Legal Description: A detailed legal
description is available
on file in the Renton
Building & Zoning
Department.
5. Size of Property: + 5 acres.
6 . Access: Via West Valley Road.
7. Existing Zoning: M-P, Manufacturing Park.
8. Existing Zoning in the Area: R-1 , B-1 , L-1 .
9 . Comprehensive Land Use Plan: Manufacturing Park.
10. Notification: The applicant was notified
in writing of the hearing
date. Notice was properly
published in .the Daily
Record Chronicle on
August 13, 1982,
and posted in three
places on or near •
the site as required
by City Ordinance
on August 12 , 1982.
C. : ISTORYp1CRG N'I'U➢D:
•
The subject site was annexed into the City of Renton
on April 14 , 1959 , by Ordinance No. 1745. The site
was rezoned to M-P, Manufacturing Park on May 9 , 1977 ,
. by Ordinance No. 3134 . A site approval for office sales
and maintenance of construction equipment and outside
storage thereof was granted by the Hearing Examiner
in SA-168-78 of May 19, 1978 .
PRELIMINARY REPO. _ TO THE HEARING EXAMINER - )7
STAR MACHINERY COMPANY, SA-058-82
AUGUST 24, 1982
PAGE TWO '
D. PHYSICAL ;:,'\. GROUND:
1,. Topography: The site is relatively .level.
2 . Soils: Puyallup Fine Sandy Loam (Py) . Permeability
is moderately rapid, runoff is slow, and erosion
hazard is slight. Seasonal high water table.
Soil is used for row crops, pasture and urban development.
Newberg Silt Loam (Ng) . Permeability is moderate,
runoff is slow, erosion hazard is slight. Seasonal
high water table. Soil is used for pasture row
crops. Woodinville Silt Loam (Wo) . Permeability
is moderately slow, runoff is slow, hazard of erosion
is slight. This soil used for pasture, row crops
and urban development.
3 . Vegetation: Some landscaping has been introduced
as part of SA-168-78, but scrub br4sh and grass
still remain.
4 . Wildlife; Existing vegetation may provide some
habitat for birds and small mammals.
5 . Water: No surface water was observed on-Lthe subject
site (August • 12 , 1982) .
6 . Land Use: The site is presently occupied by a
heavy equipment sales and maintenance facility.
A similar operation is to the north while the Puget
Power right-of-way and railroad mainline tracks
are adjacent on the east. Some older single family
homes and businesses are to the south and the West
Valley Road and Green River are on the west.
E. N I,r:;r:;kti: 00IID CHARACTERISTICS:
The general area is experiencing a transition from undeveloped
land to commercial/industrial uses.
F. PUBLIC SERVICES: •
1 . Water. and Sewer:( An eight-inch sanitary sewer
is located along the Puget Power right-of-way,
a twelve-inch water main is' located along West
Valley Road, and a storm drainage ditch is located
along the Puget Power right-of-way.
2 . Fire Protection: Provided by the Renton Fire Department
as per ordinance requirements .
3 . Transit: METRO Transit Route #155 operates along
S.W 43rd Street.
4 . Schools : Not applicable.
5 . Recreation: Not applicable.
G. APPLIC",;:LE SECTIONS S OF THE ZONING CODE:
1 . Section 4-730, Manufacturing Park.
H. APPLE ' :LE SCIONS OF TUE COMP �:+T'DI'\'SI T PLAN OR OTHER
OFFICIAL CITY DOCUMENT:
1 . Green River Valley Comprehensive Plan, June 1976.
• PRELIMINARY REPO.- TO THE HEARING EXAMINER =
STAR MACHINERY COMPANY, SA-058-82
AUGUST 24, 1982
PAGE THREE
I . IMPACT ON i ;:I: NATURAL OR ;: w„i is ENVIRONMENT:
1 . Natural Systems: Minor.
2 . Population/Employment: Minor.
3. Schools: Not applicable.
4 . ' Social: Minor.
5. Traffic: Minor.
J. EWIi I\lhPAmaiv i IL ASSESSMT'/THRES:mOLD DETERMINATION:
Pursuant to the City of Renton' s Environmental Ordinance
and the State Environmental Policy Act of 1971, as amended,
RCW 43-21C, the project is exempt under the State Environmenal
Policy Act of 1971 .
• K. IE4/DEPARTMENTS CONTACTED:
1 . City of Renton Building & Zoning Department.
2 . City of Renton Design Engineering Division.
3 . _,City of Renton Traffic Engineering Division.
4 . City of Renton Utilities Engineering Division.
5 . City of Renton Fire Prevention Bureau.
6 . City of Renton Parks & Recreation Department. .
7 . City of Renton Policy Development Department.
L. DEPARTMENT .`,'SIS:
1 . The subject proposal is consistent with ' the Manufacturing
Park zoning and Comprehensive Plan designations
for the site and compatible with the existing land
uses in the vicinity.
2 . A 4 ,000 square foot office addition on the mezzanine
of an existing building is proposed along with .
two twenty-four ( 24) foot by sixty (60) foot mobile
office structures of 2 ,800 square feet total.
3. In SA-168-78, the Hearing Examiner approved a site .
plan with office and storage requiring 82 parking
stalls. The following is a parking summary of
the approved plan and the proposed additions:
A) Approved Plan (SA-168-78)
Office 35 stalls (6 ,890 sq. ft. )
Warehousing 5 stalls (8 ,000 sq. ft. )
Maintenance 10 stalls (9 , 600 sq. ft. )
Storage & Mezzanine 3 stalls (41000 sq. ft. )
( 28,490 sq. ft. )
Outside Storage 29 stalls
TOTAL 82 stalls required
84 stalls provided.
B) Proposed Plan (Additions)
Office 34 stalls (6 ,800 sq. ft. )
Mezzanine 3 stalls (deleted)
TOTAL 31 stalls
{"
PRELIMINARY REPO_.__ TO THE HEARING EXAMINER -
STAR MACHINERY COMPANY, SA-058-82
AUGUST 24, 1982
PAGE FOUR
A) 82 stalls required, 84 provided, 13 deferred.
B) 31 additional stalls required, 113 total; 114 provided.
As indicated on the proposed plan, the required
number of parking stalls have been supplied. Other
standards of the Parking & Loading Ordinance, appear
to be complied with.
4. The Utilities Engineering Division indicates that
an approved sewer plan will be ' required. In addition,
hydrant locations must be approved by the Fire
Department.
5. Full size plans showing distances to fire hydrants
and hydrant' access are to be submitted as per Fire
Prevention Bureau comment. Also, the building
plans submitted for the mezzanine must show fire
protection coverage.. •
6 . Exterior treatment of structures should be compatible
with the main building as advised by the Policy
Development Department. Prior to issuance of any
further building permits, all provisions of the
existing bulk storage permit (including landscaping)
should be completed.
M. DEPART9MEMTAL RECOMMENDATIONS:
Based upon the above analysis, it is recommended that
the request be approved subject to the satisfaction
of items L-4 through L-6.
''' )/ J :
4 a. '
Y;. W' f • Z a I
rit
IW I
y
. ',• t • •
41
( < I.
/III\ j-- ----(i/ '
) i i
O9 I
. i' ' ,. ;to- a A
? t V1 ti
• * i0 1 �•
it -c. �. ,, •
f,_
Ill. \\ CC
} , ii
•
•
. ��0$$ O I
'" :,; - Mt" T. S, l6l1T ST I
. 4 , , ! I •
SITE APPROVAL: STAR MACHINERY COMPANY, SA-058-82
i
APPLICANT STAR MACHINERY COMPANY TOTAL AREA ±5 acres
PRINCIPAL ACCESS West Valley Road
EXISTING ZONING M-P, Manufacturing Park •
EXISTING USE Developed
PROPOSED USE 2 mobile office structures and addition of office on mezzanine
of existing building.
COMPREHENSIVE LAND USE PLAN Manufacturing Park
COMMENTS • • .
t 4. .. r. Y...♦M J- + .• , .., ., , _ Pax.,c ' .. .. b • ..:d ^ f --91 ...
{
� _..�....._...._ Ix uiA,`t p`EED.G r I' 2i,P,ot CAD iN SXPW n •
e�a", E "�-� �- ,— w...“E.G.wpy
s z
•
}"fiHSll CGtcPR 2'.1'.2' II bla L
RUSP RDorN.l.RiSl I'/cs.�Flu.CCOOL ^o '' m �SWO F�w6C TPN.c c
C� n (-1 WATERPROOF CGMENT PREEN 09L TAN B,5„iNE i
! SA-OSV-o2
vI..PED DAND cQ,ov..,„RA '�'lLO Ga wa rc iP✓,c S�}I i C
p 66A 6S.CCRP c-ND RYCETS 2 W PSP.Mn:T c. �iQx •
0 StsvC 2iu...0.c.L.2.5 P's" .
j - • u6uTuiuG C PD. CCNG idn+o./ ` a •.
3$ '� Mrf'STDR sP,61 w'�rs�ra.;- X rxf a�L' I m i
- - _ �" UNCERGRUJnlO WASTE OIL. TANF NfT•S. •'�. r a
i{ KP•E FOLE 5"se- nls. I6 aoN,-n.,To Lou.-cooe 00...R, r 11
VGRiCT SDE CDND.W Ex+4.
[ la3 6TRp+o GnRD �� .
tbSr Cm:-� ,\�'
I - , cwA,N uNc r- {^r.,
{ENEE FODRE F LW.TOY
�-Nazn4 Z g - urrr srP.D. I
vRDP uNE I<�FEKE Pesr
FENCE I O id or.Mp.
DAS.I LPNDswrAE Zn D SEE CIv�I.MG. ]III I�wN v �NAa c-�vDCD,YE OCT ' m .
/EERM P2MN[.6. •Bk- 2>1T CEDpR xQEED •
12.4 CAPn XREEO !'lx"EY.Jr!IB'CC ,P
1 •
(.1ONP�t.I Na6D�++rTv �6 PaRO-¢.rsUD t YorsaD JT.Q%'ot. �L
CDNc.WRD 11 2�°I >>
g 4Da.Cux•r.NtE ..ree I
y =Dn= 1•v Z'! %Des 2:e EL 22 5 To 22 c TncREMeO CtcuSNRD RIXa ICRVSNED RO-ic reel,/ ` tl /1 'MKS B.,N .
i - _ To 3'I I rte.
A4.BAviM4 ' -- NTv ` -
Ppxluu6 4�c_--' (�'cs. . cGRPO!
cw Dn�vE °' �y�
•
6EPCE 1 5,A`,�21'A To 183 El Po�tw At-�i 3
�- 'k-�-'`2i ro I%rT o f c"r It PP _ cLbMLC a"vno6 I I o i2.4 ISNc i7T. O
DfENw6 I- 3'-b"ESP, y2
S ID- Iqv-6I7 I A a IB'Dt. Fe. I II ^ L
wrm-ri zC DC CURES l 2 S,c,_r P,Lw I I Z -
•
SECiION AT N. PROFERTY V4-4.d I
L-J-~ �.:+,r�`cr..,'fir; .
we } __.D. gyp- _ - ___• ,nb f FENCE Ih"=1'o` 27 • ,,C s-g'..-,7Ar=l
.. Vb.I..DIDt D. �b C 9:+w:o• __—__. _r J - ✓-°^ e•.`'' rt...
I -_ I _ ` _- om�"°-"\ I NH9'21'co'w..e'2.ID'• u..�. I
.7. _,._
T 1 P �D► �I ,r<- 1n,1.,1R CR 5S—
�•r�rti'11111 l l l I IT• I '—� I I in i,i 1 l l 11 i 11';,"t La, ;�,.,... pc'ass Da ,�- a.�,�a�, o.sr a D..... �s w.a•a.,..b ,E;I - a.,«,ED „„�..�, L .
�!c�,.a -y�•'xe. -` `z--.�t:c4??�inroRp_raY E.r„iao ,�iq © ..I" 'j _
T ie,c •• ,M,-,-o 4 aNxs,.b. p 'S1!'S?P1 ..E: S 1 -
GT:wNDMpyN(ED ^J R� �l'o24 H ,.... _,n�-�•1.ri'.D•4tta b' I-. �iµcyl.��c' ' > .
.. I�DE»M RY GN Y •' I I I 1 1 I 1 11• I'SC�q,'` �� w.w•-+v t-n, l..4-.'Yr�. i' [�'^F Nc I•Y�'Iq �
•
,,.....P... ��/ �. / r o Q
MOM SPOU.. - •l 40. , - CFEN SiORK,E A .PAP Y •, \'1 z
? - _ -- a P" �Dwer-��-„-PDo_.,ou J 1�.c'•r...y_ :.::• �,,,.-xd{'I�2�' / W �/ -
.,..N w..a....Me M,NI.R..pM<,. a •„� a.":'b y _ - eu aD,F ,o,. - ..� c"r "o,,t.„ a' J Q
.........R N.,xt P.,,.., .,.ESN.�'w r^�,»anal:.,tl ,."" °= 2 I n. rt ,n s — e e•
r _F �,yftit a» d r-
%'fT' III°i�fi'I< I o —R. — .— may/ fi (n
a ens "- I l gel`11, .t;. ;.., - - stv cse.� �8 �- 1/�. Mg cm
e
/ l tro-- (x•.1`.-- - 1 S,B.Eer ^R 221.16, e
{11• ' 22O' ••av O. _ {II 11m'1.-
LmaurIrt1o.-ffY r,onaa we.e.. Ino1Mb.t..,1.sxt. �••'�I11, 111 _ nw n.+..r�R wJ..eq! '2 D
_- a„�N m 'I�.tt.rtxullwl%nee�.bt..." (, I II'_ ol, ,- O
..''.... .4 b,...r*4'4.•rm,a .r u.a.a rt•u �.eue u!''Esr.'n�.,�..J © I J
u.W. ,..•tra1g1Aw�wrPr..e ft.t.e.,felon: Ir.`:i,,,41 I e �romm�."
N a 1.` ,I.eo r.t.J.Z. r"...�:w ,;' (^'w m VIES ifl
• W 44Ji�.)PM
9vxDmtbct. tw.tdt a .iuuctP. 1 -_. - _- ---_._.--_-- .-___-_ -_ —\...b."
- __�.- mvu,r
......,..t..Ia t....I.rnn a,.,m a.w.,.,.<In 11 `
. - ...wry is.w m u.x.. ,u•., m t, c..N., -�— N _ _ _ - S W n a D n �-pn�v, -
SITE PiAN i^-ao' cwwT�
:altP �.. .,,,.xN.. /� -- e.lae fWaR IJaaM 61•"1► °a
Iie.
••••' HUMP,
• _ _,.i Cm s v 6S6'ARE A. -OFFICE C.1590 S.- 35 CAPS oCCCCCCAY BC. (2CC ) '.�Uy�a �p.�3ii -
•
ylxSE Poop 5 B I lb•.v-
��.tM1l.n ....+ . _ . NT BC-OD D CeuST. TPe Yt+ , Rt Fie,.Lb•2b x••xxe
....a n a/IMO.. «t... .m.,.. ,,,,N ,E D..roar��Jj� aooD 2O® x Al
. Dc...of co.,•...icy t '�` �LB6%O S., WICON4 20NaR M=P.sRRD
•
CO1POOa Z'I
,i 99 cav OFS
KENTON BUILDING & ZONING ^rPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - _� -
APPLICATION NO(S) : SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Ccatpany
PROJECT TITLE:
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mobile_office structures and the adding of a office on a mezanine in the building current:
on the property.
LOCATION: tmipPr-y lry•apri at 4219 Val 1. y Road__
TO;
' El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
® ENGINEERING DIVISION
TRAFFIC ENG, DIVISION SCHEDULED HEARING DATE :
D UTILITIES ENG , DIVISION
0 FIRE PREVENTION BUREAU
Ei PARKS & RECREATION DEPARTMENT
Ei BUILDING & ZONING DEPARTMENT CITY OF RENTON
El POLICE DEPARTMENT Full - ,l 982
JEI POLICY DEVELOPMENT DEPARTMENTFO
lac�
QF.\�EIDPMFNT DFPT.
DOTHERS:
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING, PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON August 10, 1982.
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION : / iy- F' /
DAPPROVED OAPPROVED WITH CONDITIONS ONOT APPROVED
4ii S 1� ' v>G�� ���2�� haie J etc/
edv(iXia., iy ./(Z7y-
/ 'i /SS?a/t(t / / ce"i /J/2Y
/0/ id zt/ r/h1((d
u/ifz-31. , ///(/ l7/4-72ii/-
1 lay_
(-VRY VA(
DATE: OIZ-
SIGNATURE OF DIRECTOR OR AUTHORIZED REPtiVj AT:'EU.IJ
REVISION 5/1982
nl vaLnLIYV ,
OAPPROVED ID APPROVED WI H CONDITIGIla El NOT APPROVED ,'
- DATE: e ec4 2--
SIGNATURE OF DIR CTOR OR AU HORIZED REPRESENTATIVE
REVISION 5/1982
REVIEWING DEPARTMENT/DIVISION :
MAPPROVED APPROVED WITH CONDITIONS NOT APPROVED
2M44DATE: g -1�-42
SIGNATURE OF DIRECTOR R
AUTHORIZED REPRESENTATIVE
REVISION 5/1982
REVIEWING DEPARTMENT/DIVISION : E L T
JQAPPROVED El APPROVED WITH CONDITIONS NOT APPROVED
DATE: 1) --/b--YcL---
SIGNATURE • !IRECTOR OR AUTHOR 7FD RFPRFSFNTATTVP
KtV1tW11V(7 11tPAKJJltNT/DIVISION ; [/7Yt/Ty I II/iil .E ,Q
• . . E] APPROVED JAPPROVED WITH CONDITI01:a Egi NOT APPROVED
UTILITY APPROVAL SUBJECT TO 074/'ga-
LATE COMERS AGREEMENT • WATER Alb
LATE COMERS AGREEMENT • SEWER MO ,
SYSTEM DEVELOPMENT CHANGE • WATER /�
SYSTEM DEVELOPMENT CHANGE • SEWER 3 ,
SPECIAL ASSESSMENT AREA CHARGE • WATER Ain
SPECIAL ASSESSMENT AREA CHARGE • SEWER Ain
APPROVED WATER PLAN • 010, ? - F1i ( wpir lu. Fi2v Oen St416' 116GF:111vr4smS
APPROVED SEVER PLAN
, yE5 ,
APPROVED FIRE HYDRANT LOCATIONS
BY FIRE 1 '1. s
FIRE FLOW AD NO
,i) 0
.I : ' 7/ 5 j1-
SIGNATURE gi' 'IRECTOR OR AUTHORIZED REPRESENTATIVEATE
REVISION 5/1982
REVIEWING DEPARTMENT/DIVISION : (--1//'c ber..
Ei APPROVED t J APPROVED WITH CONDITIONS J NOT APPROVED
10 - Cu /< V2C- /4:4 066 ge.4/yt/�//eGf 5o 03/ islr`fee- /D
v� 4ivi7
c', �/' aI dc(e5 -
eEi4 i/Jn '//I S 6€ .51ih :t.c/en /ylez74,�-r,he 541/iz
/'r c /0/'0 AG/ a pl Co v eer e —
•
/
lel I . • DATE: f-a? - jo2 -
SIGNATURE OF DIRE Ti ' OR AUTHORIZER' REPRESENTATIVE
REVISION 5/1982
REVIEWING DEPARTMENT/DIVISION : POLICE
Ej APPROVED ® APPROVED WITH CONDITIONS 0 NOT APPROVED
Lt.D.2. Persson DATE: 8/11/82
SIGNATURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
•
OF !
•
�, ° BUILDING. & ZONING DEPARTMENT
z ae o RONALD G. NELSON - DIRECTOR
9 Go'
MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
0,9gT�D SEP100
BARBARA Y. SHINPOCH
MAYOR
•
August 11, 1982
John Rabel •
Star Machinery
P.O. Box 3595
Seattle, WA 98124
SUBJECT: SITE APPROVAL APPLICATION, FILE SA-058-82
4202 WEST VALLEY ROAD
Dear Mr. Rabel:
The Renton Environmental Review Committee evaluated the above
mentioned application at its August 11, 1982, meeting. '
The Committee concurred with your letter dated July 30, 1982,
that your application was catagorial exempt from SEPA.
Very truly yours,
Roger J. Blaylock
Zoning Administrator
RJB:JFL:wr
CITY OF REN 'TOM
LAND USE HEARING EXAMINER
PUBLIC HEARING
August 24, 1982
AGENDA
COMMENCING AT 9 : 00 a.m. :
COUNCIL CHAMBERS, SECOND FLOOR, RENTON MUNICIPAL BUILDING
The applications listed are in order of application number
only and not necessarily the order in which they will be
heard. Items will be called for hearing at the discretion
of the Hearing Examiner.
R-051-82 J. CLIFFORD GRAY
Application to rezone 7, 500 square feet of
property from R-1 to L-1 for a proposed warehouse
to be attached to an existing office building;
property located on the north side of S.W.
12th Street between Maple Avenue S.W. and
Lind Avenue S.W.
SA-058-82 STAR MACHINERY COMPANY
Site Approval application for the installment
of two mobile office structures and the adding
of an office on a mezanine in the building
currently on the property; property located
at 4202 West Valley Road.
FPUD-061-82 ONE VALLEY PLACE PROPERTIES
Application for Final Planned Unit Development
for the first phase of the One Valley Place
Office Park; property located south of S. 43rd
Street between SR-167 and Talbot Road South.
Y
II•
OF R4,4
.�. ° BUILDING & ZONING DEPARTMENT
..IL
RONALD G. NELSON - DIRECTOR
09 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON, WASH. 98055 • 235-2540
O,Qq"6.0
SErc ".OAP
BARBARA Y. SHINPOCH
MAYOR
August 13, 1982
John Rabel
P. 0. Box 3595
Seattle, WA 98124
Re : SITE APPROVAL APPLICATION FOR THE INSTALLMENT OF TWO
MOBILE OFFICE STRUCTURES AND THE ADDING OF AN OFFICE
ON A MEZANINE IN THE BUILDING CURRENTLY ON THE PROPERTY,
FILE SA-058-82; PROPERTY LOCATED AT 4202 WEST VALLEY
ROAD.
Dear Mr. Rabel:
The Renton Building and Zoning Department formally accepted
the above mentioned application on July 30, 1982. A public
hearing before the City of Renton Hearing Examiner has been
set for August 24, 1982, at 9:00 a.m.
Representatives of the applicant are asked to be present.
All interested persons are invited to attend the hearing.
If you have any further questions, please call the Renton
Building and Zoning Department, 235-2550.
Very truly yours,
Roger J. Blaylock
Zoning Administrator
RJB:cl
NOTICE OF PUBLIC HEARING
RENTON LAND USE HEARING EXAMINER
RENTON, WASHINGTON
A PUBLIC HEARING WILL BE HELD BY THE RENTON LAND USE HEARING
EXAMINER AT HIS REGULAR MEETING IN THE COUNCIL CHAMBERS,
CITY HALL, RENTON, WASHINGTON, ON AUGUST 24, 1982, AT 9 : 00
A.M. TO CONSIDER THE FOLLOWING PETITIONS:
J. CLIFFORD GRAY
Application to rezone 7 , 500 square feet of property
from R-1 to L-1 for a proposed warehouse to be attached
to an existing office building, file R-051-82; property
located on the north side of S.W. 12th Street between
Maple Avenue S.W. and Lind Avenue S.W.
ONE VALLEY PLACE PROPERTIES
Application for Final P. U.D. for the first phase of
the One Valley Place Office Park, file FPUD-061-82;
property located south of S. 43rd Street between SR-167
and Talbot Road South .
STAR MACHINERY COMPANY
Site Approval application for the installment of two
mobile office structures and the adding of an office
on a mezanine in the building currently on the property,
file SA-058-82; property located at 4202 West Valley
Road.
Legal descriptions of the files noted above are on file in
the Renton Building and Zoning Department.
ALL INTERESTED PERSONS TO SAID PETITIONS ARE INVITED TO BE
PRESENT AT THE PUBLIC HEARING ON AUGUST 24 , 1982, AT 9 : 00
A.M. TO EXPRESS THEIR OPINIONS.
PUBLISHED: August 13, 1982 RONALD G. NELSON
BUILDING AND ZONING
DIRECTOR
CERTIFICATION
I, STEVE MUNSON, HEREBY CERTIFY THAT THREE COPIES OF THE
ABOVE DOCUMENTS WERE POSTED BY ME IN THREE CONSPICUOUS PLACES
ON THE PROPERTY DESCRIBED ABOVE AS PRESCRIBED BY LAW.
ATTEST: Subscribed and sworn to
before me, a Notary Public, in
and for the State of Washington
residing in King County, on the
11th day of August, 1982.
)17 CR)--z-44_, SIGNED: diogier°1121/1/.€4,0,41002"..
REP IN BUILDING .& ZONING DBI 1TMABNT
DEVELOPMENT APPLICATION REVIEW SHEET
E C F — � — x
APPLICATION NO(S) : SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company
PROJECT TITLE:
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
�ilobi 1 _ off; _e a n�r_tura- nd the addincr of a office on a mezanine in the building currently
on the property.
LOCATION : Pmprf-y lmai-pa at 42f7 WWSt Valley Rnad_
TO:
' PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
® ENGINEERING DIVISION
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
® UTILITIES ENG . DIVISION
0 FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
El -BUILDING & ZONING DEPARTMENT C9TY OF RENTON
POLICE DEPARTMENT - 1. 1982
pouy
POLICY DEVELOPMENT DEPARTMENT CIE V€LO AGENT DEPT.
Ei OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING . PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON August 10, 1982 .
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION : /e G`
El APPROVED APPROVED WITH CONDITIONS NOT APPROVED
64&.. . 6-&/.0/ Zate a/ 7k_fitzaj
a- i€ 1' % mil/ 4/lO .
goy 7ss�s�� 6) zr d/ZE/ � l�
we, *is( y 4/e s7k
7/ze ,ye
/a4iS DL ) 4 // ar&IW
DATE: 10;Z-
SIGNATURE OF DIRECTOR OR AUTHORIZED REPEORWRYEkijo
REVISION 5/1982
REN_ ._IN BUILDING ,& ZONING DEI=._;TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - fi - x
APPLICATION NO(S)': SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company
PROJECT TITLE:
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mobile office structures and the adding of a office on a mezanine in the building currently
on the property.
LOCATION : Prn rf-y 1 -at-ar3 ai- 42(12 Wagt- Valley lead,
TO:
ID PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
Cl• ENGINEERING DIVISION
TRAFFIC ENG, DIVISION SCHEDULED HEARING DATE :
EUTILITIES ENG , DIVISION
fl FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
0 BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
El POLICY DEVELOPMENT DEPARTMENT
Ei OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING, PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M, ON August 10, 1982.
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION :
JJ APPROVED El APPROVED WI H CONDITIONS El NOT APPROVED
DATE: ?---/e Z
SIGNATURE OF DIRECTOR OR AU HORIZED REPRESENTATIVE
REVISION 5/1982
REN . !N BUILDING ,& ZONING DEI .4.;TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - g - x
APPLICATION NO(S) : SITE APPROVAL (SA-058-82)
PROPONENT : Star Machinery Company
PROJECT TITLE :
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mobile office stnictures and the adding of a office on a mezanine in the building currently
on the property.
LOCATION : Pmpar I-y 1ocatarl at- 4209 JdW sl- Val ley Road
TO:
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
ENGINEERING DIVISION
1 TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
UTILITIES ENG . DIVISION
® FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
Ei BUILDING & ZONING DEPARTMENT
111 POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
El OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5 :00 P.M. ON August 10, 1982.
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION :
1:n APPROVED El APPROVED WITH CONDITIONS Ei NOT APPROVED
DATE:2,ct A/ye/ 71Arvhciv
SIGNATURE OF DIRECTOR
R AUTHORIZED REPRESENTATIVE
REVISION 5/1982
REN:-N BUILDING ,& ZONING DEI .o.;TMENT
DEVELOPMENT APPLICATION REVIEW SHEET
E C F - �L - x
APPLICATION NO(S)': SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company
PROJECT TITLE :
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mobil P office structures and the adding of a office on a mezanine in the building currently
on the property.
LOCATION : pmtwri-y l rra+-ari at 4 709 w - Va]i y Road,
TO: .
PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
DENGINEERING DIVISION
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE:
OUTILITIES ENG . DIVISION
EIFIRE PREVENTION BUREAU
OPARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT
OPOLICE DEPARTMENT
OPOLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON August 10, 1982.
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION : E4.2),C,
ADLAPPROVED El APPROVED WITH CONDITIONS 0 NOT APPROVED
DATE: 1
SIGNATURE IF !IRECTOR OR AUT OR ZED REPRESENTATIVE
REVISION 5/1982
REN.,. ._IN BUILDING ,& ZONING DEI _ITMENT -
DEVELOPMENT APPLICATION REVIEW SHEET
ECF - . - x
APPLICATION NO(S) ; SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company
PROJECT TITLE:
BRIEF DESCRIPTION OF PROJECT; Site approval application for the installment of two
mobile office strictures and to adding of a office on a mezanine in the building currently
on the property.
LOCATION: prnp ar Ly .0ca ed af- a7n7 west Val rzy Road.
TO:
' ® PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
' 0 ENGINEERING DIVISION
0 TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
UTILITIES ENG . DIVISION
® FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
0 BUILDING & ZONING DEPARTMENT
il POLICE DEPARTMENT
OPOLICY DEVELOPMENT DEPARTMENT
El OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M, ON August 10, 1982.
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION : f)71_iTy 4-
ic164,15/4•.EAFAAe;
DAPPROVED El APPROVED WITH CONDITIONS ® NOT APPROVED
I. UTILITY APPROVAL SUBJECT TO '/4/g -
LATE COMERS AGREEMENT • WATER; j41i)
LATE COMERS AGREEMENT • SEWER A/p
SYSTEM DEVELOPMENT CHARGE • WASTER N/A
SYSTEM SYSTEM DEVELOPMENT CHARGE • SEWER
SPECIAL ASSESSMENT AREA CHARGE • WATER Ain
SPECIAL ASSESSMENT AREA CHARGE • SEWER ,(/to
APPROVED WATER PLAN `Z Mksz war ''u- F'2.6 OLD 574-43" (• S
APPROVED SEWER PLAN )I 9
APPROVED FIRE HYDRANT LOCATIONS
BY FIRE i 'T. Y4S
FIRE FLOW AN NO , •
0 0
(#114111EP--"--dIfe0 DATE: g'i/ 5 0 °Z'
SIGNATURE if `DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
REN . .,N BUILDING ,8c ZONING
DEVELOPMENT APPLICATION REVI
n Renton Fire Dept. 111
79
x
. r.., :ton Bureau
ECF - � -
L►L( om.,
APPLICATION NO(S)': SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company A L G 2 1982
PROJECT TITLE:
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mobile office structures and the adding of a office on a mezanine in the building currently
on the property.
LOCATION : Pmpar+-y 4.2fl2 W ct Valley I20th_
TO:
' ® PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE :
• ENGINEERING DIVISION
El TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
OUTILITIES ENG . DIVISION
14FIRE PREVENTION BUREAU
PARKS & RECREATION DEPARTMENT
BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
OPOLICY DEVELOPMENT DEPARTMENT
El OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P.M. ON August 10, 1982
CIRCULATED: August 2, 1982 •
REVIEWING DEPARTMENT/DIVISION : ( /'c Lp/.-'
APPROVED JJ APPROVED WITH CONDITIONS El NOT APPROVED
LA Si-Zc- /4'n , gitAmi'tf &'1t ,sZ ces iD
s g /i /4w7 GI cCess-
6e $461I-n ffeen z A-7,-ire
r- ,./ O frt Co v er e -
/
1/2,- DATE: 02 - jot
SIGNATURE OF DIRE Ts ' OR AUTHORIZEI REPRESENTATIVE
REVISION 5/1952
REN'. .IN BUILDING ,& ZONING DEL .-.1TIWENT
DEVELOPMENT APPLICATION REVIEW SHEET
ECF — — x
APPLICATION NO(S) : SITE APPROVAL (SA-058-82)
PROPONENT: Star Machinery Company
PROJECT TITLE :
BRIEF DESCRIPTION OF PROJECT: Site approval application for the installment of two
mob'1 offic struct ores an[7 the adding of a office on a mezanine in the building currently
on the property.
LOCATION : Pmlw,-f-y lnraf-Prl at 42f12 Wass- Val ley Road,
TO:
' El PUBLIC WORKS DEPARTMENT SCHEDULED ERC DATE:
• ENGINEERING DIVISION
TRAFFIC ENG. DIVISION SCHEDULED HEARING DATE :
El UTILITIES ENG . DIVISION
0 FIRE PREVENTION BUREAU
El PARKS & RECREATION DEPARTMENT
0 BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
El POLICY DEVELOPMENT DEPARTMENT
OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING. PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P .M. ON August 10, 1982
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION : POLICE
® APPROVED APPROVED WITH CONDITIONS ® NOT APPROVED
Lt.D.R. Persson DATE: 8/11/82
SIGNATURE OF. DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
41A
STAR 3 MACHINERY
thmO
July 30, 1982
To: City of Renton
Building and Zoning Department
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
From: John Rabel , President
Star Machinery Company
P. 0. Box 3595
Seattle, Washington 98124
Subject: Site approval for modifications at 4202 West Valley Road
Gentlemen:
Star Machinery has leased its Seattle facility to the Postal Service and
wishes to consolidate its activities at 4202 West Valley Road in Renton.
In the short term, this will involve the installment of two 24 ft. X 60 ft.
mobile office structures and the adding of 4,000 sq.ft. of office on a
mezzanine in the building currently on the property.
This will require the addition of 17 new parking spaces for the interior
offices and the moving of 12 spaces displaced by the mobile offices. At
the same time, you may, wish to consider 13 spaces that were deffered when
our yard was not paved to allow movement of tracked equipment. (See note 6
on plan. ) We would wish to continue the deferral , however, the plan shows
provision for all 99 spaces required.
We have not submitted an environmental checklist. We understand we are
exempt because:
1. The interior office modification does not alter the use of
the building.
2. The mobile office structures are less than 4,000 sq.ft. total
(2,880 sq.ft. ) .
3. The new parking spaces required are fewer than 20 (17 spaces) .
CITY OF RENTON
JUL 3;0,1982
BU LDING/ZONING DEPT.
STAR MACHINERY COMPANY * 241 South Lander Street * P.O. Box 3595
SF_ATTI F WA.SHIN(TnAI AR194 * TaI nhnnA 9n�_R92_n7Fn ' TmInv Q0_Q7Fn i r"hIo QTADIAr'n
City of Renton
Building and Zoning Department
July 30, 1982
Page 2
When business conditions and money costs allow, we would propose to
build another building on the eastern portion of the site to house our
construction equipment sales and servicing operations. This will be the
subject of a full site approval when it occurs. At that time, we would
remove the mobile offices. We estimate that it will be one to two years
before this is feasible.
Whatever you can do to expedite this approval would be appreciated. Be-
ginning October 1, we will lose $7,500 of rental per week if the move
has not occurred.
Thank you for your attention to this matter.
Sincerely,
.ohn B. Rabel
President
Enclosures
pm
.,. >� (. _TY OF RENTO: FILE NO(S):
�, BUILDING & ZONING DEPARTMENT
Iiik
• N� MASTER APPLICATION
NOTE TO APPLICANT: Since this is a comprehensive application form, only those
items related to your specific type of application(s) are to be completed.
(Please print or type. Attach'additional sheets if necessary.)
_ I ;; TYPE OF APPLICATION
NAME'_ . :Ello " •
FEES
'[Sta-r Ma'E h nery Company a
REZONE*(FROM TO )
ADDRESS
' 'P. O. Box 3595 0 SPECIAL PERMIT*
ED
CITY ZIP TEMPORARY PERMIT*
Seattle, WA 98124 1:::] CONDITIONAL USE PERMIT*
TELEPHONE I nn 1 SITE PLAN APPROVAL $135.00
623-0760 0 GRADING AND FILLING PERMIT
No. of Cubic Yards:
CONTACT PERSON n VARIANCE •
From Section:
* Justification Required -
NAME '
John Rabel M
ADDRESS SUBDIVISIONS:
P. 0. Box 3595 '
0 SHORT PLAT
CITY ZIP 0 TENTATIVE PLAT
Seattle, WA 98124 0 PRELIMINARY PLAT
TELEPHONE 0 FINAL PLAT
623-0760 0 WAIVER
(Justification Required)
OWNER I NO. OF LOTS:
NAME PLAT NAME:
Rabel Properties .
ADDRESS PLANNED UNIT DEVELOPMENT:
P. 'O. Box 3595
0 PRELIMINARY
CITY ZIP 0 FINAL ,
Seattle, WA 98124 ,
P.U.D. NAME:
TELEPHONE
623-0760 0 Residential 0 Industrial
0 Commercial 0 Mixed
LOCATION
MOBILE HOME PARKS:
PROPERTY ADDRESS
4202 West Valley Road 0 TENTATIVE
EXISTING USE PRESENT ZONING O PRELIMINARY
Machinery Distribution FINAL
PROPOSED USE PARK NAME:
Same
NUMBER OF SPACES:
0 ENVIRONMENTAL REVIEW COMMITTEE
SQ. FT. ACRES
AREA: + 5 TOTAL FEES V�;5
r _, STAFF USE ONLY -- ADMINISTRATIVE PROCESSING
OF 117NTUPI
DATE ST y/2 �I] T APPLICATION RECEIVED BY: �U �L; u APPLICATION DETERMINED TO BE:
J U L 3 0 1982 0 Accepted
0 Incomplete Notification Sent On By:
(Initials)
BU::.L iNG/.4UNING DEW F.
DATE ROUTED ADDITIONAL MATERIAL RECEIVED BY:
/�
A061. , I c I3Z APPLICATION DETERMINED TO BE:
0 Accepted
0 Incomplete Notification Sent On By:
. (Initials)
ROUTED TO:
tEi
0 Building I Design Eng. Fire 0 Parks ,
EEf �
Police J Policy Dev. lEr Traffic Eng. Utilities
REVISION 5/1982
Legal description of property (if more space is required, attach a separate sheet).
4202 West Valley Road
•
See attached.
i °
AFFIDAVIT
John B. Rabel , being duly sworn, declare that I am
®authorized representative to act for the property owner,Downer of the property involved
in this application and that the foregoing statements and answers herein contained and the
information herewith submitted are in all respects true and correct to the best of my knowledge
and belief.
SUBSCRIBED AND SWORN TO BEFORE ME THIS
‘°-‘ DAY OF TALI
NOTARY PUBLIC IN AND FOR THE STATE OF
'WASHINGTON, RESIDING AT
K.ev't+
vea
(Name of NIc<tary Public) ignature of Owner)
c 23o- y5-'4 4 P. 0. Box 3595
(Address) (Address)
Seattle, WA 98124
(City) (State) (Zip)
623-0760
(Telephone)
Acceptance of this application and required filing fee does not constitute a complete
application. Plans and other materials required to constitute a complete application are listed in
the "Application Procedure."
' '
'
- '
'
`
-
'
'
'
^ '
^`
'
-
�--E6AiL DESCRIPTION :
'[��
T �T PORTION OF GOVERNMENT LOT � 4ND THE NORTHEAST �/4 OF ��E �ORTHW��T ��4
H
OF SECTION 36 , TOWNSHIP 23 NORTH' RANGE 4 EAST , W^M° � IN KING COOWTYv WA8H-
INIGTON ' LYING EASTERLY OF WEST VALLEY ROAD AND WESTEKlY OF PUGET SOUND ELEC-
TRIC RAILWAY RIGHT OF WAY AND LYI-NIG BETWEEN LINES 150 FEET AND 480 F bRTH
OF MEASURED AT *RIGHT ANGLES THERETO AND PARALLEL TO THE NORTH LINE OF HENRY
�DAMS DONATION LAND CLAIM NO. 43; EXCEPT THAT PORTION THEREOF LYING WITHIN
STATE HIGHWAY NO . SR i8l " °
-
ALSO THAT PORTION OF THE NORTHFAST Vz- OF THE NORTHWEST 1/4 OF 5ECTI-OW 36 ,
��WWSHI P 2� N�RT�, R�NGE 4 E45T , W ~ M" , IN KING COUNTY , NASHI NGTON DESCRII}EI>
A-:�' FOLLOWS :
,
2EG I NN ING AT A POINT 30 FEET NORTH 4ND 735 . 75 FEET WES-T O'F THE WORTHEA&T
�CR �
NE& �F HENRY ���MS DON4TION LAND CL� M NO. 43; THENCE NORTH 120 FEET TO
� ,-, NE WH[CH 15 150 FEET NORTH OF AND PARALLEL WITH SAID NORTH LINE; THENCE
ST ALONG SAID PARALLEL LINE 60 FEET ; THENCE SOUTH 120 FEET ; THENCE EAST
�� FEET T� THE� POINT OF B�CINNlNG"
.
4kLSO THAT PORTION OF GOVERNMENT LOT 2 IN SECTION 36, TOWNSHIP 23 NORTH" ,
� ' N�E 4 E4ST9 W. M. IN KING COUNTY? DESCRIBED AS FOLLOWS :
�Erj-IWNING AT THE NORTHEAST CORNER OF THE HENRY ADAMS DONATION LAND
T -NCE WE-QT , ALONG THE CENTER LIME OF SOUTH 180TH STREET 1�373"75
THEE NCEE NORTH 93 FEET TO THE TRUE POINT OF BEGINNING; THENCECDNTJNUE -NORTH
}� FEET THENCE HE�T q4 FEET , MORE OR LESS , TO THE E�ST LI�� �F ST E CIAD
�� . 5- M THENCE SOUTHEASTERLY, ALONG SAID EAST LINE 61 FEET/ MORE OR L��S,
TO A POINT WEST OF THE TRUE POINT OF BEGINNING; THENCE E-AST T? FEET., +lDR'E Q,R
TO THE TRUE POINT OF BEGINNING; EXCEPT THAT PORTION T'HEREOF LYI-NG WIH-
STATE HIGHWAY NO. SR 181 ~'
'
'
`
•
._.�....._-.-.... ...or T v..c coo IN SUCTa+, .MDi Dmc-1 �
Ft.� 8.85.4.15
# � N EEC•new
.. .
SODS RR'a �SyNg , )rwt Rw QIGOf °—J 7I',Gen.Du.Coale TRNR .,✓" .!
ScRslN '.�,;
VY74R.RDOF Cameo.? `*Oa.TRF 8.Ow1N6
D D M.DC 5RI•0 I To w DPW
I w'R
Sus �T,.M1"c77vc WT c a-`T Awici
• RoTRDo(Ecxen
.0 N.4 GS.CORR a TR.. Rj1 ¢us � oe
e C.F1i
j Gh-V.Sll NPIt T02
•
To 7.'4.RI7Tenec en,
.I • U6NTNIN6 T—a..Dien C.IC?Wk.^'/ 2 m
P ��aer.FSTDR SFIRs 5 e bT ,T g / •
won. mL
_ UNDERGrzGJNO WASTE dl TANF MS. ��. jmj
A �e- I C ,.....—<,�—<,b! �MYS, v
VERIW So.ce.o "1 R.. n•
w3 bTPrc e.Re Culic‘
r"
CNWN UwR �LSC_
.1.- iE"R' iMRC RW l�D'lo/
.
( 2d'-8s
_—-- I
UWr STD..,
YNLRfle I�'1 R2'-6'wKN � 1'Ms"G>D.
PROF on*.
lea L ,, I<_pc-nosec,...Yr
24 0" t`.i
'`�p�ayt:pgR SEE MWia,@6. tatR SwC.wN G lYrRUDCD COW.,
t0
GYM-Ew.Y SET
ryI� II 1.i"F t.or.a ICOC •
1DERM etwroel ▪TI R�OMW roe... r}b 1c 1..Cason woD iYart¢D J.Q Doc.
Aal.CWNMC 1 Come.Cuts I r RA" 5.
G• 1', Z'/ To 111' Jr r K 12 5 D 22 0 cD Pan VCRw4D Moen. 7I - Marc m w<in i
Ii
On m"R 'Inj 11 R To 183 F1t•V 5 TMrrE..AG�' • I O
4Rearr. �,_ I.s' i I Pwi,w wa+cm a°wrcc I i'' F"1 m.m rm
(((''')R z�Te OP a FRvsn"Nr atNIN6 I I.5.., 5•<"DF, Q� F
'a c "\ FAVEO erY.G IIz'+I'd I7 17 A a.D'Dc Pot I I I 7
warn SERVKG CLR6 1 1 Soser nnr. I L I 1 Z
SECTION AT N. PROPE Wry w•=I'q �® U-J Uf
N6-F + __inr } _ _ _ __ FENCE IYP*I',e 27 t- cc
• _ fib' ♦ Mti' •
eRMiJ
c.
-g 1 1�"p1Y`r •
-- o.n 14 .'.Iva.lp' e...xe...... f
��- till" I.1 l II III!�i' �.tll �-gal 041 ht I..t:Nz'ax2:.12 ate W T
x¢1....°,,., ,q' . fi .la.R•F. - I I• I III I v-'"...c .S 1 _ °'-
�7C b OP roan. . t
�y� 4Ti`` �)•• `• sv .oR.6. ®` �AZr e�EoFs.c "'°r ..� "' `�j ! I r J J in
6A0.1ND �� •i. i!R iIIII 'i I 6-R�R'M4
1 s...! WRFNR ill m
aFN ' !/ ...MID
/ 0 Q
,.I„ MOW. Q R .�„ .mowJ CSErJ aTOR,.sa v � 2 G
,..wRw„«.R..I. 3 �, +•..'.°oe.- / / Q GeMenem naterlel Is
,. tobeus.by
µ'1 t.acOr fo.I. n lleml M _ _ , T. Q O,I 0 0 T.4.1' ,..e:�er. ,zv, Ui
4\
'` r .d.w.Ni. tZIp .wD (U
.ww o. 0 wnw ,wr•u,w, Ju x re. r.;aw )` L� V sa Y'^N - 11-R • - - J1'I ��.'i�.' ® IQw,.",w....N.W..•w w,. ",w. w.N,I, 3 44 ; Ai s""D`.r�°RRDf °^ = 0 E r' _{II\ ._iIil
J 1_-
AAA.* f 1 . - �u:lURd'� a .ter �w..w"...•( i
-•• ..• M IEMCE Q rnr• I 1 ■
f 4 1-.".wv'o.N...•I_a.Dra.w..,R; `-I`."l -'F 1 ..o..D...,.•<..1..7 •(--...moors ee. 1 �w.w o
L.A.Psaln,R-TM MM.,NDrtm R T •• I \ .=• - ` y'16.5Gr �,R __ a21.1a' -_
]!' , N' 12D' a
I Cu..wc......�w MM.w 70' ° 8 R
°,r."MSo...▪. ~;.S,w'"v• :,.`gi n; ,'MI ': ,.`�', s..,: 'FMAIRIS t 12 s61.MT....a...i,w.. i
I.
sVC
S—R.«. <, w.w.. , v°d°.".'Wilq,..n.D.Rt.tam ' nN.A,,. —--,tm— - +rR.wnNrRRrR
i24
i 1
,•^sold N'• / NRY R.lJi4D.)
2 _,
:..hrc.""Seat '".It. ,D.s - mow, aa.� ('v+N)
R¢RD m E;b,.dw,lo:• •,».n:,no= v .w•w. 0 SITE PLAN I"�4v1 -_- ------- /JTRG.W.6 GW.N'ED
v shmewa/ftwrr 413N4111, n
`0..ee.`."2,mo.dated
•. �t°�I,y p n RR G�� BlD6 I.¢EA -C7fFIGE f�yp 6F- 35 URS oCCNPIe...cY B2 (SM.G-) }y�.p 4Jp..j av11
Bs. ,f• to in0 R®..e.....uRNR-vMIM WNSE Boo:J 5 DI r(lbY.-� .1 me rb.M KA•lb
MOM oms N.i971and •PO..5.Ifn (e cbtel ' e... M CORY Ma.NT 4DD0 2p CONS, TYP! li .n...
▪ ...,„RmR•.�°'"" �e"."ew.�.+'w"-`wd�.,Rsu ®�L"iORaxea�os•- ® n,rD RR4�NR.eree0 Al
GLIr Deas--t. —,� DUI.dNG 20Nt 41-P
r
RENTOIN BUILDING ,& ZONING DEPARTMENT
DEVELOPMENT APPLICATION REVIEW SHEET
E C F
APPLICATION NO(S)': SITE APPROVAL (SA-058-82)
PROPONENT : Star Machinery Company
PROJECT TITLE :
BRIEF DESCRIPTION' OF PROJECT: Site approval application for the instal lment of two
mobile office structures and the adding of a office on a mezanine in the building currently
on the property.
LOCATION : Propari-y 1irateal at 47(17 WP d Va1 1 Py Road.
TO:
r [1] PUBLIC- WORKS DEPARTMENT SCHEDULED ERC DATE :
• El ENGINEERING DIVISION
n TRAFFIC ENG , DIVISION SCHEDULED HEARING DATE :
UTILITIES ENG , DIVISION
FIRE PREVENTION BUREAU
PARKS & RECREATION. DEPARTMENT
BUILDING & ZONING DEPARTMENT
POLICE DEPARTMENT
POLICY DEVELOPMENT DEPARTMENT
E1 OTHERS :
COMMENTS OR SUGGESTIONS REGARDING THIS APPLICATION SHOULD BE PROVIDED
IN WRITING , PLEASE PROVIDE COMMENTS TO THE BUILDING & ZONING DEPARTMENT
BY 5:00 P ,M, ON August 10, 1982_
CIRCULATED: August 2, 1982
REVIEWING DEPARTMENT/DIVISION :
APPROVED El APPROVED WITH CONDITIONS ONOT APPROVED
DATE:
TURE OF DIRECTOR OR AUTHORIZED REPRESENTATIVE
REVISION 5/1982
eceipt #
CITY OF RENTON
PLANNING DEPARTMENT
NAME jefF,‘,1" DATE /
PROJECT & LOCATION :1',/I A ligA":(
':(;) J1urlt,e4--/ fOñC
Application Type Basic Fee Acreage Fee Total
're" PP.P)33A p Cdt
J
Environmental Checklist -- ---
Environmental Checklist Construction Valuation Fee
TOTAL FEES
Please take this receipt and your payment to the Finance Department on the first floor.
Thank you.
remit
r. G •
IOF FILE
FILE TITLE
c '
1N _
,
w