Loading...
HomeMy WebLinkAboutPA PARK ADDENDUM C - 06-03-2022PHILIP ARNOLD PARK BID PHASE ADDENDUM C 3 June 2022 Addendum C - Page 1 of 2 ADDENDUM – C TO THE CONTRACT DOCUMENTS FOR City of Renton PHILIP ARNOLD PARK Project Issued: May 9, 2022 Addendum C Issued: June 3, 2022 Revised Document Clarification Questions Due Date: 5:00 pm June 1, 2022 Bid Date: Prior to 2:00 pm June 8, 2022 Bid Opening Date: 3:00 pm June 8, 2022 To: All Holders of Bid/Contract Documents: This addendum forms part of the Contract Documents and modifies the original Plans and Specifications, for which proposals are due on the date and time above. Acknowledge receipt of this addendum on “Addenda Received” of the Bid Documents in the Contract Documents. Failure to do so might subject the bidder to disqualification. This addendum shall clarify the Contract Documents as follows: Item No. 1 – Title Sheet, pg 1 1.Revise Bid Due date to June 8, 2022 2.Revise Bid Opening date to June 8, 2022 Item No. 2 – Specification Section 00 00 03 – Bid Proposal Form, pg 1 1.Revise Bid Due date to June 8, 2022 Item No. 3 – Specification Section 00 11 13 Advertisement for Bids, pg 1 1.Revise Bid Due date to June 8, 2022 2.Revise Bid Opening date to June 8, 2022 Item No. 4 – Specification Section 01 21 00 Prevailing Wage Rates 1.Revise effective date for prevailing wages for this project to June 8, 2022. Addendum C Sheets Issued: 1.Drawing No E3.00 – Detail 4. Revises conduit to Schedule 80. 2.Drawing No LS.02 – Removes 3 stray drafting symbols in the parking lot area. PHILIP ARNOLD PARK BID PHASE ADDENDUM C 3 June 2022 Addendum C - Page 2 of 2 3.Drawing No LS.14 – Detail 1, Adds note 2 and lengths to barrier rails. Detail 3, Revises direction arrows per slope shown in elevation. 4.Drawing No LS.15 – Detail 2, Adds note 1 and length to barrier rail. 5.Drawing No LP.04 – Detail 1, Revises bar scale. Detail 2, Revises bar scale. 6.Drawing No LP.05 – Detail 1, Revises bar scale. Detail 2, Revises bar scale. 7.Drawing No LP.06 – Detail 1, Revises bar scale. Detail 2, Revises bar scale. Alternate 1 Planting Schedule, daylily symbol and plant added. CONTRACT DOCUMENTS For City of Renton Philip Arnold Park Site Improvements #CAG-22-015 IN RENTON, WASHINGTON Owner: City of Renton Contact: Betsy Severtsen (425)757-6657 PRE-BID CONFERENCE Date: May 16, 2022 Time: 8:30 AM Zoom: Meeting ID: 879 8127 9841 Passcode: 685055 BID DUE Date: June 8, 2022 Time: 2:00 PM Location: Office of the City Clerk Address: Renton City Hall - Lobby 1055 S Grady Way Renton, WA 98057 BID OPEN Date: June 8, 2022 Time: 3:00 PM Zoom: Meeting ID: 839 7998 5134 Zoom Password: 019972 Time of Completion Substantial Completion: May 26, 2023 Anticipated Notice to Proceed: July 20, 2022 BID PHASE PHILIP ARNOLD PARK REVISED - ADDENDUM C 3 June 2022 DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS PHILIP ARNOLD PARK SITE IMPROVEMENTS SECTION 00 00 03 - BID PROPOSAL FORM Philip Arnold Park Site Improvements Bid Form Page 1 of 6 CITY OF RENTON HAND DELIVER TO: OFFICE OF THE CITY CLERK RENTON CITY HALL – LOBBY 1055 S. GRADY WAY, RENTON, WA, 98057 for the PHILIP ARNOLD PARK SITE IMPROVEMENTS 720 Jones Avenue South Renton, WA 98057 CAG-22-015 Bids Due: 2:00 PM PDT June 8, 2022 Bidder’s Name: Address: Telephone: (MUST BE COMPLETED AND SIGNED) Having carefully examined the Bidding Documents and Instructions to Bidders, the Project site and conditions affecting the Work, and all Addenda, the undersigned Bidder certifies that: (i) it has the personnel and means to complete the Work and (ii) it will furnish all labor, materials, equipment, and management to perform all Work required by, and in strict accordance with, the above-named documents for the following sum within the time fixed. All Bid amounts shall include overhead, profit, bonds, insurance, and any other expense required to complete the Work (excluding Washington State Sales Tax). The undersigned Bidder certifies that it is, at the time of submitting the Bid, and shall remain throughout the period of the Contract, licensed by the State of Washington to perform the type of work required under the Contract Documents. It further certifies that it is skilled and regularly engaged in the general class and type of work called for in the Contract Documents. A. BASE BID The Bidder agrees to complete the Work for this Project for the following lump sum Base Bid amount: ______________________________________________________________ DOLLARS (words) $_____________________________________________________________ (numerals) Do not include in the Base Bid amount Washington State Sales Tax that will be paid based on the B I D F O R M BID PHASE PHILIP ARNOLD PARK REVISED - ADDENDUM C 3 June 2022 DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS PHILIP ARNOLD PARK SITE IMPROVEMENTS Section 00 11 13 – ADVERTISEMENT FOR BIDS Contract No. CAG-22-015 00 11 13 - 1 Philip Arnold Park Improvements June 3, 2022 The City of Renton invites interested and qualified contractors to submit sealed bids for the following project: TITLE: PHILIP ARNOLD PARK SITE IMPROVEMENTS ESTIMATED BASE BID COST: $3,833,023.36 including WSST. ESTIMATED ALTERNATE 1 COST: $182,109.52 including WSST. ESTIMATED ALTERNATE 2 COST: $76,798.90 including WSST. PRE-BID CONFERENCE: 8:30 A.M. May 16, 2022 via ZOOM Attendance at the pre-bid conference is highly encouraged but is not mandatory. Pre-Bid Conference Zoom Information: Click or use this link to join the Pre-Bid Zoom Conference: https://us02web.zoom.us/j/87981279841?pwd=NjNvbUFYK3NzdEpZajdMYzdoR3Yvdz09 Meeting ID: 879 8127 9841; Passcode: 685055 Via telephone by dialing: +1 253 215 8782, followed by: Meeting ID: 879 8127 9841 Passcode: 685055 SUBMITTAL TIME/DATE/LOCATION: Prior to 2:00 P.M. June 8, 2022 Bids must be hand delivered to: Office of the City Clerk Lobby, Renton City Hall 1055 S. Grady Way, Renton, WA, 98057 PUBLIC BID OPENING: Approximately 3:00 PM on June 8, 2022 via ZOOM. Public Bid Opening Zoom Information: Click or use this link to join the Pre-Bid Zoom Conference: https://us02web.zoom.us/j/83979985134?pwd=ZlZrMlpiUGl6Z1grVVd6S2F4TitYZz09 Meeting ID: 839 7998 5134; Passcode: 019972 Via telephone by dialing: +1 253-215-8282, followed by: Meeting ID: 83979985134# Passcode: 019972# The work, to be substantially completed from the date of commencement under this contract, but shall not exceed a Substantial Completion date of May 26, 2023; shall include, but not be limited to: Construction of park improvements and related site work. Work includes earthwork, utility installation, picnic shelters, Portland Loo Restroom, pathways including boardwalk and retaining walls, basketball court improvements, parking lot improvements, lighting, park signage, concrete flatwork, site furnishings, landscape planting, and landscape irrigation and other improvements for the construction of Philip Arnold Park Site Improvements for the City of Renton, Washington, all as shown and described on the Contract Documents prepared by Hough Beck & Baird Inc., dated, May 4, 2022. CAG-22-015 BID PHASE PHILIP ARNOLD PARK REVISED - ADDENDUM C 3 June 2022 DIVISION 01 – GENERAL REQUIREMENTS PHILIP ARNOLD PARK SITE IMPROVEMENTS Section 01 21 00 – Prevailing Wage Rates Contract No. CAG-22-015 01 21 00 - 1 Philip Arnold Park Site Improvements June 3, 2022 PART 1 - GENERAL 1.01 SUMMARY A.This project, located in King County Washington, is subject to the payment of prevailing wages to all workers. It is the contractor’s responsibility to determine and use the applicable rates for the appropriate area of the state, as published by the Washington State Department of Labor and Industries. These rates are available on the web at https://lni.wa.gov/licensing-permits/ public-works-projects/prevailing-wage-rates/. 1. Contractor must include these provisions in all subcontracts for work performed under this Contract. B.Based in the bid submittal deadline for this project, the applicable effective date for prevailing wages for this project is June 8, 2022. Upon written request, the Owner will mail a hard copy of the applicable prevailing wages for this project. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED) END OF SECTION BID PHASE PHILIP ARNOLD PARK REVISED - ADDENDUM C 3 June 2022 A B MANUAL WATERING BY SENSORSUSPENDEDWATERING OFF SENSOR ACTIVE ON OFF PGM ADV. STARTMAN- STATUSSTATION MAXICOMLINKED TO DAY CYCLECYCLICALODD DAYCYCLE STATUSPUMP / MVEVEN DAYCYCLE DAY CYCLECUSTOM OFF TEST PROGRAM CYCLE + SOAK WATERBUDGET EVEN DAYS ODD DAYS CYCLICAL CUSTOM SUNSAT FRI THUWED TUE MON STATION WATERING TIME WATERING START TIME MY PUMP START PROGRAM OVERLAP TIMECALENDAR EVENT DAY OFF RAIN DELAY AUTO B A 3"A FINISHED GRADE DUCT SCHEDULE 1 STRONGBOX ENCLOSURE #SB24-SS-120V ALUMINUM PANEL (BOLTED TO BACK WALL OF BOX) HYBRID CONTROLLER: SEE LANDSCAPE DRAWINGS AND SPECIFICATIONS. TERMINAL BOX WITH TERMINAL STRIPS. FLOW MONITOR. PUMP MFGR: SEE LI SERIES SHEETS FOR (E) IR. PUMP. LEVITON 5280-W, GFI OUTLET. 12" ENCLOSURE EXTENSION (TYP.) PRE-CAST OR CONCRETE BASE 1. STRONG BOX CABINET - #SB-24SS-120V. 2. COLD ROLLED STEEL CONSTRUCTION 3. POWDER COATED DARK GREEN COLOR 4. TWO LOUVERED VENTS ON EACH SIDE 5. REMOVABLE EQUIPMENT MOUNTING PANELS 6. CABINET BOLTED TO A PREFABRICATED CONCRETE BASE 7. HINGED METER VIEWING WINDOW WITH REINFORCED GLASS 8. CONTROL CABINET, PREFABRICATED CONCRETE BASE, IRRIGATION CONTROLLER, TERMINAL STRIPS, SURGE PROTECTION, & PANEL ASSEMBLY AVAILABLE FROM UNITED PIPE AND SUPPLY (MODEL # IT-ICC-SBMC12MB-RP). IRRIGATION CONTROL PANEL LEGEND: ENCLOSURE CABINET & PANEL NOTES: 200 AMP METER BASE REQUIRED BY PUGET SOUND ENERGY (ALIGN METER WITH WINDOW TYP.) PANEL 'SPL', 200A, 240/120V, 1Ø, 3W. 16-CIRCUIT; CIRCUIT BREAKERS PER PANEL SCHEDULE. CONNECT PER SINGLE LINE DIAGRAM. LIGHTING CONTROLLER; DOUGLAS LITEPAK 2 #DLP2-8R8D-SM. DATAREMOTE DIGITAL CELLULAR COMMUNICATION UNIT WITH DOMED TOP ANTENNA & CABLE MIN. 2" CONDUIT FOR STATION CONTROL WIRES GROUND WIRE CONNECTS FROM GROUND LUG TO GROUNDING BUSS IN CONTROLLER (TYP.) GROUND LUG (RUN WIRE FROM GROUND LUG TO GROUNDING ROD GRID TYP.) METER / LOAD CENTER PANEL LEGEND: 2 3 4 5 6 7 8 A B 9 10 11 12 16 17 13 18 BID SET PHILIP ARNOLD PARK PM: ED DAVID, PE TEL: 206.855.4600 04/01/22 IN COMPLIANCE WITH CITY OF RENTON STANDARDS SCHEDULES AND DIAGRAMS SERVICE/IRRIGATION CONTROL PEDESTAL POLE BASE DETAIL HANDHOLE DETAIL TYPICAL DUCT BANK R-4211TED-04-4211R-421160E3.00 PHILIP ARNOLD PARKPHILIP ARNOLD PARKPR:LUA: C: C21006142 BBBBBBBBBBBBBB594678101112CONCRETE MOW STRIPCOORDINATE CHARTBID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHIN GTONLICENSEDLANDSCAPEARCH ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 SITE FINISHES & FURNISHINGS PLAN - CENTRALLS.02 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: R-421163 BID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHING TONLICENSEDLANDSCAPEARC H ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 SITE FINISHES & FURNISHINGS DETAILSLS.14 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: NOT TO SCALE1BOARDWALK ELEVATIONNOT TO SCALE3BOARDWALK R-421176NOT TO SCALE2BOARDWALK ENLARGEMENT BID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHING TONLICENSEDLANDSCAPEARC H ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 SITE FINISHES & FURNISHINGS DETAILSLS.15 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: NOT TO SCALE2BOARDWALK AND GUARDRAIL SECTIONNOT TO SCALE4GUARDRAILNOT TO SCALE6POST ATTACHMENTNOT TO SCALE7BARRIER ATTACHMENTNOT TO SCALE1BOARDWALK AND CURB SECTIONNOT TO SCALE3BOARDWALK TRANSITIONNOT TO SCALE5BOTTOM BASE PLATE R-421177 BID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHIN GTONLICENSEDLANDSCAPEARCH ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 PLANTING ENLARGEMENTSSCALE: 1" = 5'-0"PLANTING ENLARGEMENT 11LP.04 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: R-421194SCALE: 1" = 5'-0"PLANTING ENLARGEMENT 22 BID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHIN GTONLICENSEDLANDSCAPEARCH ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 PLANTING ENLARGEMENTSLP.05 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: R-421195SCALE: 1" = 5'-0"PLANTING ENLARGEMENT 3SCALE: 1" = 5'-0"PLANTING ENLARGEMENT 421 ALTERNATE 1: PLANTING SCHEDULEALTERNATE 1: PLANTING SCHEDULEALTERNATE 1: PLANTING SCHEDULEALTERNATE 1: PLANTING SCHEDULEALTERNATE 1: PLANTING SCHEDULEBID SETPHILIP ARNOLD PARKIN COMPLIANCE WITH CITY OF RENTON STANDARDS2101 4TH AVENUE, SUITE 1800 SEATTLE, WA 98121206.682.3051 phone206.682.3245 faxSTATEOFWASHIN GTONLICENSEDLANDSCAPEARCH ITECT MERIT OVIIRNO. 1396 EXP.03/2023 C: C21006142 TED-04-4211 PLANTING ENLARGEMENTSSCALE: 1" = 5'-0"PLANTING ENLARGEMENT 1 - ALTERNATE 11LP.06 PHILIP ARNOLD PARK PHILIP ARNOLD PARK PR:LUA: R-421196SCALE: 1" = 5'-0"PLANTING ENLARGEMENT 2 - ALTERNATE 12 Philip Arnold Park Site Improvements CAG-22-015 Bidder Questions and Response PARKS and RECREATION DEPARTMENT M E M O R A N D U M #3 DATE: TO: CC: FROM: SUBJECT: 3 June 2022 Bidders Dean W. Koonts, HBB Landscape Architecture Betsy Severtsen, Capital Projects Coordinator Philip Arnold Park Site Improvements – Bidder Questions & Responses (CAG-22-015) 1.Bidder’s Question: •We are interested in bidding the precast planks on the boardwalk portion of this project. Is PermaTrak supplying these planks, or are they open to bids from other suppliers. Response: PermaTrek is supplying the planks (i.e. treads) as part of a complete boardwalk system. 2.Bidder’s Question: •Is there a base bid for the cross bracing requested, as far as material size and lengths? Are there minimum material requirements for the cross bracing/barriers? Is the cross bracing/barrier design provided by the structural EOR or is the design to be provided by Magnum? If Magnum is responsible for the cross bracing, what are the dimensions between the bents? Response: The Barrier Rails are installed to act as a barrier against crawling or sleeping underneath the boardwalk and should be included in the base bid for the boardwalk. Material, finish, and sizing is in specification 32 33 00.01, 2.02 Boardwalk Barrier. These should be included in the shop drawing submittal. Lengths have been added to drawings and will be issued in an Addendum. 3.Bidder’s Question: •Please provide picnic shelter foundation details. We refer to LS.2, it says picnic shelter foundation details to be determined by the manufacturer Bidders Questions – Philip Arnold Park Site Improvements (CAG-22-015) Page 2 of 3 June 3, 2022 Philip Arnold Park Site Improvements CAG-22-015 Bidder Questions and Response while Appendix E says foundation design has not performed by the manufacturer. Response: Per manufacturer ‘Recreation Today,’ footing/foundation design is included in their engineering drawings they provide. These will then be reviewed in the submittal review process for shop drawings, per 32 33 00 Site Furnishings, 1.06 Submittals, A.2.a. Picnic Shelters. 4.Bidder’s Question: •Philip Arnold Park Spec Section 26 05 43, 2.02A, indicates conduit should be Schedule 80 PVC. However, drawing E3.00, detail #4 indicates conduit should Schedule 40 PVC. Please resolve this issue. Response: The specification is correct. The drawing will be revised in an Addendum. 5.Bidder’s Question: •The drawings for this project show two basketball goals but they are nor included in the specifications. I was going to bid the PR55XL goal from Bison. I have attached a cut sheet of this goal from Bison which marches up with the drawing in the plans. Can you clarify this? Response: Specification 11 68 23, Section 2.01 Basketball Goal provides pole, backboard, goal, and net components. 6.Bidder’s Question: •Regarding, the 2,000 sq ft of joint compound, was this ever composite tested or point counted? It could be considered part of the wall board system and if less than 1%, could be demolished with the building. Response: The joint compound was not composite tested, nor was it point counted, therefore assume that it cannot be combined with in-place building demolition. 7.Bidder’s Question: •Is there additional written specifications available on the requirements for the SPH service other than what is shown on the plan sheet E1.00? Reviewing section 26000 of the special provisions I only see Bidders Questions – Philip Arnold Park Site Improvements (CAG-22-015) Page 3 of 3 June 3, 2022 Philip Arnold Park Site Improvements CAG-22-015 Bidder Questions and Response information on the other PP-2 & PP-3 services from Skyline and Milbank is needing to know if there are specific requirements for the SPH service meeting any City of Renton standards and cabinet material type and finish. Response: Pedestal requirements for ‘SPH’ are the same as pedestal ‘SPL’, except references to irrigation controller do not apply. See sheet E3.00, Detail 1, Service/irrigation Control Pedestal’ including ‘Enclosure Cabinet & Panel Notes’. Provide distribution as shown in single line wiring diagram for ‘SPH’. 8.Bidder’s Question: •The new plans on the City Clerk site are the same plans just with a different name, they are still scans/raster. Response: The download off the City Clerk’s website prints to PDF and rasterizes, our apologies. See the following FTP link for vectorized plans: https://spaces.hightail.com/receive/SFZk5QooF1 9.Bidder’s Question: •The bid date (June 1) noted on Page 1 of 6 of the Bid Form has been changed by addendum to June 8. Will this page be re-issued? Response: •Yes. Please see Addendum C that includes reissued pages with the updated date for page 1 of the Bid Form, and also page 1 of the title pages, page 1 of the bid advertisement, and the prevailing wage effective date. End of Bidder's Questions & Responses Received through 06-01-22.