Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-05-25_FR_013 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 1 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 05/25/2022 Renton Elementary School 16 20180398E003 013 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Kelsey McCrady Permit No. Client/Owner Attn Requested By Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather LPD / Hutteball + Oremus Cornerstone Continental Dirt Contractors/ Jerry Jr. Cloudy, 50’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on site, as requested, to observe building footing subgrade preparation. Upon arrival, we met with representatives from Cornerstone and Continental Dirt Contractors (CDC). Building Footing Subgrade Preparation: Upon arrival, CDC was preparing footings in Area A for the future school building. At planned footing subgrade elevation, a moist to very moist, gray to orange, sand with silt (native till) was observed. AESI probed footing subgrades to depths of less than 2 inches and noted the material appeared firm and unyielding underfoot. The contractor then placed 4-inches of 2.5-inch minus crushed rock along the bottom of excavations to protect the subgrade. The material was compacted using a vibratory sled compactor. All footings observed today appear suitable for the design loads. See Figure 1 for locations. Figure 1: Footing subgrades observed today highlighted in green. Subgrades observed previously highlighted in blue.