Loading...
HomeMy WebLinkAbout20160674E002 Bethany Corner 2022-05-27 FR 041.pdf Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Matthew A. Miller, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 1 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 5/27/2022 Bethany Corner 20160674E002 041 Location Municipality AESI Project Manager AESI Field Rep 10957 SE 165th St. Renton Matthew A. Miller, P.E. Jake Talbot Permit No. Client/Owner Attn Requested By B22000572 Mark Seek (Tiger Mountain Homes) Mark Seek Contractor Engineer/Architect General Contractor Earthwork Contractor Weather HiLine Homes Tiger Mountain Homes / Mark Tiger Mountain P/C, 60’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite around 11:30am to observe lot 2 ADU foundation subgrade. Lot 2 ADU Subgrade Check Prior to our arrival, the contractor excavated approximately 2-4 feet from existing grade using a large excavator. The subgrade consisted mostly of brown silty sand with some standing water over the surface from rainfall over the past week. We assessed the subgrade using a ½” diameter steel t-probe and observed the north side of the building foundation subgrade to be soft probing approximately 1-1.5 feet. We informed Mark with Tiger Mountain of our observations in which we outlined the soft subgrade area using yellow spray paint for it to be removed and replaced with dryer fill soils (Photo 1). Mark informed us that lot 3 foundation subgrade will be ready for us to check next week. AESI left the site in the afternoon and will return upon request. Photo 1: South end of lot 2 ADU looking towards the north.