Loading...
HomeMy WebLinkAboutRAM 081 01 R A72 Extruded Concrete Curb - ResponseRequest for Approval of Material Contract Number FA Number SR Date Section / Title of Project County Contractor Subcontractor For assistance in completing, see Instructions and Example Bid Item No. Material or Product/Type Name and Location of Fabricator, Manufacturer or Pit Number Specification Reference PE/QPL Code Hdqtr./QPL Code Acceptance Action Codes for use by Project Engineer and State Materials Laboratory 1. Acceptance Criteria: 2. Acceptance Criteria: 3. Acceptance Criteria: 4. Acceptance Criteria: 5. Acceptance Criteria: 6. Acceptance Criteria: 7. Acceptance Criteria: 8. Source Approved: Acceptance based upon 'Satisfactory' Test Report for samples of materials to be incorporated into project. Mfg. Cert. of Compliance for 'Acceptance' prior to use of material. Catalog Cuts for 'Acceptance' prior to use of material. Submit Shop Drawings for 'Approval' prior to fabrication of material. Only 'Approved for Shipment', 'WSDOT Inspected' or 'Fabrication Approved Decal' material shall be used. Submit Certificate of Materials Origin to Project Engineer Office. Request Transmitted to State Materials Laboratory for Approval Action. 9. Approval Withheld: 10. Approval Withheld: 11. Miscellaneous Acceptance Criteria. Remarks: Submit samples for preliminary evaluation. Project Engineer Distribution State Materials Engineer Distribution General FileContractor DOT Form 350-071 EF Revised 12/2012 Project Engineer Date State Materials Engineer Date RAM # Region Operations Engineer Region Materials State Materials Lab Fabrication Inspection Signing Inspection Other For WSDOT Use Only M/S 47365 This form shall be completed prior to submittal. If this form is not complete at time of submittal it may be returned for information that was omitted. Catalog Cut Approved Yes No CAG-15-134 STPUL-1131(002) Logan Ave N - Airport Way to N 6th Street - Project King Johansen Excavating, Inc.