Loading...
HomeMy WebLinkAboutR-417207N T O 0 w @ 2021 Abbey Road Group Land Development Services Company, LLC, Puyallup, WA All rights reserved. These drawings, plans, specifications and other documents, including those in electronic form, are owned by Abbey Road Group Land Development Services Company, LLC and it retains all common law, statutory and other reserved rights, including copyrights. These drawings, plans, specifications and other documents cannot be copied, distributed, submitted to others (including governmental agencies and lenders) without the express written consent of Abbey Road Group Land Development Services Company, LLC. STORMWATER NOTES 1. ALL WORKMANSHIP AND MATERIALS SHALL BE IN ACCORDANCE WITH CITY STANDARDS AND THE MOST CURRENT COPY OF THE STATE OF WASHINGTON STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION (WSDOT/APWA) AND AS AMENDED BY THE CITY OR THE STATE. 2. TEMPORARY EROSION/WATER POLLUTION PREVENTION MEASURES SHALL BE REQUIRED IN ACCORDANCE WITH THE 2017 CITY OF RENTON SURFACE WATER DESIGN MANUAL APPENDIX D. SHOULD THE TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN ON THIS DRAWING NOT PROVE TO BE ADEQUATE TO CONTROL EROSION AND SEDIMENTATION, THE APPLICANT/CONTRACTOR SHALL INSTALL ADDITIONAL FACILITIES AS NECESSARY TO PROTECT ADJACENT PROPERTIES, SENSITIVE AREAS, NATURAL WATER COURSES, AND/OR STORM DRAINAGE SYSTEMS. 3. CALL THE UNDERGROUND LOCATE LINE 1-800-424-5555 A MINIMUM OF 48 HOURS PRIOR TO ANY EXCAVATIONS. 4. THE STORM DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO APPROVED PLANS ON FILE WITH THE CITY (TYP.). ANY SIGNIFICANT DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY. 5. A COPY OF THE APPROVED CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN AND STORMWATER PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 6. ALL EROSION CONTROL AND STORMWATER FACILITIES SHALL BE REGULARLY INSPECTED AND MAINTAINED BY THE DESIGNATED CERTIFIED EROSION AND SEDIMENT CONTROL LEAD (CESCL) DURING CONSTRUCTION. 7. IT SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN STREET USE AND OTHER RELATED OR REQUIRED PERMITS PRIOR TO ANY CONSTRUCTION ACTIVITY IN THE MUNICIPALITY'S RIGHT OF WAY. IT SHALL ALSO BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL REQUIRED PERMITS PRIOR TO ANY CONSTRUCTION. THE CONTRACTOR SHALL ABIDE BY ALL REQUIREMENTS FOR TRAFFIC CONTROL & SAFETY WHEN WORKING IN THE ROAD RIGHT OF WAY. 8. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IN THE EVENT OR DISCOVERY OF POOR SOILS, STANDING GROUNDWATER, OR SEVERE DISCREPANCIES FROM SOIL LOG DESCRIPTIONS AS NOTED ON THE PLANS. 9. FOR PUBLIC SYSTEMS, THE CONTRACTOR SHALL CALL FOR INSPECTION 48 HOURS PRIOR TO COVERING ANY DRAINAGE STRUCTURE. 10. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLE, NOT LOCATED WITHIN A TRAVELED ROADWAY OR SIDEWALK, SHALL HAVE LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS. D Abbey Road Group Land Development Services Company, LLC 2102 E MAIN AVE, SUITE 109 PUYALLUP, WA 98372 P.O. Box 1224, Puyallup, WA 98371 (253) 435-3699, Fax (253) 446-3159 A PORTION OF THE NW 1 /4 OF THE NE 1 /4 OF SECTION 08, TOWNSHIP 23 NORTH, RANGE 05 EAST, WILLAMETTE MERIDIAN CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON TESC NOTES SEEDING NOTES 1. SEED MIXTURE SHALL COMPLY WITH TABLE D.2.1.2.13 AND APPLICATION PER D.2.1.2.6. 2. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY TO FOSTER AND PROTECT THE ROOT STRUCTURE. 3. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30, ARMORING OF THE SEED BED WILL BE NECESSARY. (E.G., GEOTEXTILES, JUTE MAT, CLEAR PLASTIC COVERING) 4. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES, SWALES, LEVEL SPREADERS AND SEDIMENT BASINS. 5. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE. FOLLOWING SURFACE ROUGHENING, PERFORM ALL OPERATIONS ACROSS OR AT RIGHT ANGLES TO THE SLOPE. 6. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED, ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS. 7. EROSION CONTROL SEEDING SHALL NOT BE USED IN AREAS SUBJECT TO WEAR BY CONSTRUCTION TRAFFIC. 8. EROSION CONTROL SEEDING MAY BE USED IN ALL AREAS OF 5% OR LESS SLOPE. IN AREAS BETWEEN 5 AND 10% SLOPE, EROSION CONTROL SEEDING MAY BE USED FOR A MAXIMUM HORIZONTAL DISTANCE OF 100 FEET. USE MULCH OR NETTING OR OTHER TREATMENTS FOR STEEPER AND LONGER SLOPES. INSPECTION SEQUENCE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES REQUIRING INSPECTION FOR THIS PROJECT: 1. CLEARING AND GRADING LIMITS 2. TEMPORARY CONSTRUCTION ENTRANCE (ONSITE PLANS) 3. TEMPORARY SILTATION FENCING 4. VEGETATION AND STABILIZATION OF EXPOSED SURFACES 5. STOCKPILE PLASTIC SHEETING (ONSITE PLANS) PERMANENT EROSION AND SEDIMENT CONTROL MEASURES REQUIRED FOR THIS PROJECT: 1. SEEDING AND/OR LANDSCAPING AND SOIL AMENDMENTS OF NON -IMPERVIOUS SURFACES. 2. ASPHALT PAVING, CURB AND GUTTER, AND SIDEWALK. 3. CATCH BASINS. MULCHING NOTES 1. MULCH MATERIALS USED SHALL BE HAY OR STRAW AND SHALL BE APPLIED AT A RATE PER TABLE D.2.1.2.A. 2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED SLOPES GREATER THAN 2:1. 3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON. 4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1. SOIL STOCKPILE NOTES 1. STOCKPILES SHALL BE STABILIZED (WITH PLASTIC COVERING OR OTHER APPROVED DEVICE) DAILY BETWEEN OCTOBER 1 TO APRIL 30. 2. IN ANY SEASON, SEDIMENT LEACHING FROM STOCK PILES MUST BE PREVENTED. 3. TOPSOIL SHALL NOT BE PLACED WHILE IN A FROZEN OR MUDDY CONDITION, WHEN THE SUBGRADE IS EXCESSIVELY WET, OR WHEN CONDITIONS EXIST THAT MAY OTHERWISE BE DETRIMENTAL TO PROPER GRADING OR PROPOSED SODDING OR SEEDING. 4. PREVIOUSLY ESTABLISHED GRADES ON THE AREAS TO BE TOPSOILED SHALL BE MAINTAINED ACCORDING TO THE APPROVED PLAN. 5. STOCKPILES MUST BE LOCATED MORE THAN 50 FEET FROM ALL DRAINAGE FACILITIES. PLASTIC COVERING NOTES 1. PLASTIC SHEETING SHALL HAVE A MINIMUM THICKNESS OF 6 MILS AND SHALL MEET THE REQUIREMENTS OF THE 2017 CITY OF RENTON SURFACE WATER DESIGN MANUAL SECTION D.2.1.2.4. 2. COVERING SHALL BE INSTALLED AND MAINTAINED TIGHTLY IN PLACE BY USING SANDBAGS OR TIRES ON ROPES WITH A MAXIMUM 10-FOOT GRID SPACING IN ALL DIRECTIONS. ALL SEAMS SHALL BE TAPED OR WEIGHTED DOWN FULL LENGTH AND THERE SHALL BE AT LEAST A 12 INCH OVERLAP OF ALL SEAMS. 3. CLEAR PLASTIC COVERING SHALL BE INSTALLED IMMEDIATELY ON AREAS SEEDED BETWEEN NOVEMBER 1 AND MARCH 31 AND REMAIN UNTIL VEGETATION IS FIRMLY ESTABLISHED. 4. WHEN THE COVERING IS USED ON UN -SEEDED SLOPES, IT SHALL BE KEPT IN PLACE UNTIL THE NEXT SEEDING PERIOD. 5. PLASTIC COVERING SHEETS SHALL BE BURIED TWO FEET AT THE TOP OF SLOPES IN ORDER TO PREVENT SURFACE WATER FLOW BENEATH SHEETS. 6. PROPER MAINTENANCE INCLUDES REGULAR CHECKS FOR RIPS AND DISLODGED ENDS. INSPECTION SCHEDULE 1. SILTATION FENCE - INSPECT: PRIOR TO CLEARING, AFTER MAJOR STORM EVENTS, MONTHLY. 2. TEMPORARY CONSTRUCTION ENTRANCE - INSPECT: PRIOR TO CLEARING, AFTER MAJOR STORM EVENTS, MONTHLY. 3. STOCKPILES - INSPECT: MONTHLY AND AFTER MAJOR STORM EVENTS FOR RIPPING AND LOOSE SEAMS. 4. INSPECTIONS SHALL CONTINUE UNTIL SITE HAS BEEN STABILIZED. THE ESC LEAD FOR THIS PROJECT WILL BE DECIDED BY THE CONTRACTOR. (A "MAJOR STORM EVENT" IS DESCRIBED AS 0.5" OR MORE INCHES OF RAINFALL IN A PERIOD OF 24 HOURS OR LESS.) THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING UTILITIES PRIOR TO ANY CONSTRUCTION. AGENCIES INVOLVED SHALL BE NOTIFIED WITHIN A REASONABLE TIME PRIOR TO THE START OF CONSTRUCTION. CALL BEFORE YOU DIG (811) WWW.WASH I NGTON811.COM SOIL AMENDMENT NOTES SOIL AMENDMENT ALL AREAS SUBJECT TO CLEARING AND GRADING THAT HAVE NOT BEEN COVERED BY IMPERVIOUS SURFACE, INCORPORATED INTO A DRAINAGE FACILITY OR ENGINEERED N AS STRUCTURAL FILL OR SLOPE SHALL, AT PROJECT COMPLETION, DEMONSTRATE It THE FOLLOWING: (Y) O • A TOPSOIL LAYER WITH A MINIMUM ORGANIC MATTER CONTENT OF TEN PERCENT DRY WEIGHT IN PLANTING BEDS, AND 5% ORGANIC MATTER CONTENT IN TURF AREAS, AND A PH FROM 6.0 TO 8.0 OR MATCHING THE PH OF r THE ORIGINAL UNDISTURBED SOIL. V • THE TOPSOIL LAYER SHALL HAVE A MINIMUM DEPTH OF EIGHT INCHES EXCEPT WHERE TREE ROOTS LIMIT THE DEPTH OF INCORPORATION OF AMENDMENTS NEEDED TO MEET THE CRITERIA. SUBSOILS BELOW THE TOPSOIL LAYER SHOULD BE SCARIFIED 4 TO 12 INCHES WITH SOME INCORPORATION OF THE UPPER MATERIAL TO AVOID STRATIFIED LAYERS, WHERE FEASIBLE. AFTER PLANTING, MULCH PLANTING BEDS WITH 2 INCHES OF ORGANIC MATERIALS. QUALITY OF COMPOST AND OTHER MATERIALS USED TO MEET THE ORGANIC CONTENT REQUIREMENTS: • THE ORGANIC CONTENT FOR "PRE -APPROVED" AMENDMENT RATES CAN BE C) (0 MET ONLY USING COMPOST MEETING THE COMPOST SPECIFICATION FOR BIORETENTION (SEE SECTION C2.6 OF THE COR SURFACE WATER DESIGN C) MANUAL), WITH THE EXCEPTION THAT THE COMPOST MAY HAVE UP TO 35 Q PERCENT BIOSOLIDS OR MANURE. THE COMPOST MUST HAVE AN ORGANIC O MATTER CONTENT OF 40 PERCENT TO 65 PERCENT, AND A CARBON TO 6 NITROGEN RATIO BELOW 25:1. THE CARBON TO NITROGEN RATIO MAY BE AS N HIGH AS 35:1 FOR PLANTINGS COMPOSED ENTIRELY OF PLANTS NATIVE TO Q THE PUGET SOUND LOWLANDS REGION. J • CALCULATED AMENDMENT RATES MAY BE MET THROUGH USE OF COMPOSTED MATERIALS AS DEFINED ABOVE; OR OTHER ORGANIC MATERIALS AMENDED TO MEET THE CARBON TO NITROGEN RATIO REQUIREMENTS, AND NOT EXCEEDING THE CONTAINMENT LIMITS IDENTIFIED IN TABLE 220-B, TESTING PARAMETERS, IN WAC 173-350-220. THE RESULTING SOIL IS CONDUCIVE TO THE TYPE OF VEGETATION TO BE ESTABLISHED. MAINTENANCE N REPLENISH THE SOUL ORGANIC MATTER BY LEAVING LEAF LITTER AND GRASS O CLIPPINGS ONSITE (OR BY ADDING COMPOST AND MULCH REGULARLY). THIS BMP IS r DESIGNED TO REDUCE THE NEED FOR IRRIGATION, FERTILIZERS, HERBICIDES, AND O PESTICIDES. O O SOIL QUALITY AND DEPTH SHOULD BE ESTABLISHED TOWARD THE END OF i O CONSTRUCTION AND ONCE ESTABLISHED, SHOULD BE PROTECTED FROM N COMPACTION, SUCH AS FROM LARGE MACHINERY USE, AND FROM EROSION. EROSION CONTROL SEED MIXTURE SPECIES DESIRED SEEDS PLS COMMON NAME/LATIN NAME COMPOSITION PER SQUARE FOOT POUNDS/ACRE SPIKE BENTGRASS/AGROSTIS EXARATA 6 9 0.1 CALIFORNIA BROME/BROMUS CARINATUS 15 23 9.8 TUFTED HAIRGRASS/DESCHAMPSIA CESPITOSA 15 23 0.4 BLUE WILDRYE/ELYMUS GLAUCUS 18 27 10.7 CALIFORNIA OATGRASS/DANTHONIA CALIFORNICA 18 27 5.6 NATIVE RED FESCUE/FESTUCA RUBRA VAR. RUBRA 18 27 2.4 MEADOW BARLEY/HORDEUM BRACHYANTHERUM 10 15 7.7 R-417207 IN COMPLIANCE WITH CITY OF RENTON STANDARDS VELOPMENT ENGINEERINGanders 12/20/2021 EJ 1 CITY OF RENTON REDLINES 3.18.21 HJ 4/16/2021 GH SURVEYED: L. WALKER SCALE: VERTICAL: NAVD 83/1 HORIZONTAL: NAD lase/ ee T Y O C M E I L I N VIEW DATE: 11 /24/2021 2 CITY OF RENTON REDLINES 5.24.21 HJ 5/27/2021 GH DESIGNED) BROWN 792 1833 N E 12TH ST FIELDBOOK: S�GISTER � 3 CITY OF RENTON REDLINES 7.21.21 HJ 7/27/2021 GH j� � T O RENTON RENTON WA 98056 PAGE DRAWN: DRAwllvc Ivo: 7 AL H. JASTRZEMBSKI ONE INCHDATUM e CHECKED: J. BROWN AT FULL SCALE IF NOT ONE INGHT SCALE ACCORDINGLY �A� I� Planning/Building/Public orks Dept. E S C NOTES APPROVED HULSMANN SHEET: 7 OF: 19 1 / � � / � 0 � 1 1112412021 N D. REVISION BY T DATE E APPR