HomeMy WebLinkAboutFR-011 Through FR-014 - HWA West Side CTB Observation21312 30th Drive SE, Suite 110 Field Report No.: FR -011
1 fflPA, ; Bothell, WA 98021-7010 Date (mm/dd/yy): 4/25/2016
TeL 425-774-0106 HWA Project No.: 2013-063-21
HWAGEOSCIENCES INC. Fax. 425-774-2714 HWA Task No.: 200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
tient
tient Representative
Weather
City of Renton
Bob Hanson
Cloudy/Light Rain, 50's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General ContractorGeneral
Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
Ken
Bret Salazar
FIELD REPORT
SUMMARY OF FIELD TIME SPENT ON PROJECT TODAY:
Start Travel: 0645 Arrived at Site: 0750 Departed Site: 1430 End Travel: 1530
HWA INSPECTION ACTIVITIES, OBSERVATIONS AND/OR COMMENTS:
HWA made a visit to the jobsite to observe the cement treatment of subgrade beneath the southbound lanes and
shoulder of Logan Ave N. The crew began work at the southern end of the jobsite, at Sta. 15+55. Approximately 14
pounds per square foot of Portland cement was planned to be placed on top of the existing subgrade with a spreading
truck. Due to the spreading techniques and the dust guard on the spreader truck, a representative sample was difficult to
collect using a measured pan without introducing inaccuracies. I measured the area that was covered by one complete
delivery truck and divided that by the tonnage of the truck. It was determined that approximately 15 lbs per square foot of
cement was being applied to the subgrade at the start of the job. The spread rate was reported and adjusted.
The material was tilled and mixed into the subgrade using a CMI/Terex RS -650 rotovator in 7 -foot wide swaths to a
depth of 16 -inches below the top of the existing grade. The degree of mixing was verified by frequent potholing to the full
mixing depth (16 inches) and utilizing Phenolphthalein to indicate the presence of the cement. From Station 15+55 to
19+10, a water truck was connected to the front of the rotovator and water was added to the mixture. The material
directly behind the rotovator was tested with a nuclear density gauge to determine the approximate moisture content.
The material was then spread with a CAT D5G dozer and a CAT 140H motorgrader to grade, and compacted with a
CAT CS533E single smooth drum roller. Compaction was performed in static mode due to the moisture and fines
content of the soil. A nuclear density gauge was used to take compaction tests along the roadway; the specific locations
and elevations tested are summarized on the attached 'Field Compaction Test Report'. Samples of the tested material
were collected for moisture content verification.
A lab technician from HWA was on site to collect samples of cement -treated soil. The samples were molded in 4 -inch
split proctor molds on site, and returned to HWA's lab in Bothell for compressive strength testing.
At 1240, the rotovator snapped one of the articulating arms connected to a wheel, and could not continue. The crew
planned to replace the broken parts through the evening, and will possibly be ready to continue tomorrow. Material was
spread, mixed, and compacted to Station 20+25.
A total of 9.25 hours was charged to the job today for equipment load/unload, travel, observation/testing, standby,
sample entry, and report writing.
SIGNATURES:
Signed
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 1 of 3
21312 30th Drive SE, Suite 110
i r LT MA Bothell, WA 98021-7010
7�� j (� ( 7 T INC
Tel. 425-774-0106
u` AGEOSCTENCES IlVC. Fax. 425-774-2714
Field Report No.:
FR -011
Date (mm/dd/yy):
4/25/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
tient
Client Representative
Weather
City of Renton
Bob Hanson
Cloudy/Light Rain, 50's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const. I
Ken
I Bret Salazar
Photo 1: Mixing cement into existi
subgrade with water truck attached
Photo 2: Potholing in processed material and spraying sidewalls with Phenolphthalein to ensure mixing.
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 2 of 3
�� 21312 30th Drive SE, Suite 110
ff 1 � �' ; Bothell, WA 98021-7010
Tel. 425-774-0106
HWAGEOSCIENCES INC. Fax. 425-774-2714
Field Report No.:
FR -011
Date (mm/ddlyy):
4/25/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
Field Test
Client
ICTient Representative
Weather
City of Renton
Bob Hanson
Cloudy/Light Rain, 50's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
I Ken
Bret Salazar
FIELD COMPACTION TEST REPORT - NUCLEAR METHOD
MATERIAL BEING PLACED: see accompanying field report
PROJECT IMPROVEMENT TESTED: see accompanying field report
Test Method X ASTM D6938 (soil) ASTM D2950 (asphalt) Other:
Densometer: X Troxler 3440 Troxler 3430 Troxier 3411-B CPN MCI -DR -P
Serial #: 37406 Density Standard Count.: 2443 Moisture Standard Count: 720
*Lab Control: Standard Proctor X Modified Proctor
Asphalt Marshall Density Asphalt Maximum Theoretical Density (Rice)
COMMENTS: Test locations and elevations are approximate. Testing provides data only for a specific test location and to a limited depth.
Accompanying field report provides additional information. **Depth B.G. indicates depth below grade. Grade means the design finish grade of the
current type of fill material being placed. Bolded results indicate compaction below specified value.
Completed By: Bret Salazar Reviewed By: Bryan Hawkins
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 3 of 3
Elev'n
Lab Control*
Field Test
Relative
Density
Moist.
or
Probe
(Proctor/Rice/Marshall)
Compaction
Test
Depth
Depth
ID
Max.
Opt.
Over
Total
Dry
Moist.
Field
Spec
No.
Detailed Test Location
B.G.**
(in)
#
Dens.
Moist.
Size %
pcf
pcf
%
%
%
Logan Ave N, Southbound, Sta.
1
16+25, 19' Left of CL
SG
8
143.0
131.9
8.4
2
Logan Ave N, Southbound, Sta.
SG
8
143.9
135.1
6.5
16+20, 13' Left of CL
3
Logan Ave N, Southbound, Sta.
SG
8
139.2
129.4
7.6
16+30, 7' Left of CL
Logan Ave N, Southbound, Sta.
4
19+95, 20' Left of CL
SG
8
122.7
109.3
12.2
5
Logan Ave N, Southbound, Sta.
SG
8
126.6
113.5
11.6
20+00, 14' Left of CL
6
Logan Ave N, Southbound, Sta.
SG
8
133.7
122.4
9.2
20+25, 5' Left of CL
7
8
9
10
11
12
13
Test Method X ASTM D6938 (soil) ASTM D2950 (asphalt) Other:
Densometer: X Troxler 3440 Troxler 3430 Troxier 3411-B CPN MCI -DR -P
Serial #: 37406 Density Standard Count.: 2443 Moisture Standard Count: 720
*Lab Control: Standard Proctor X Modified Proctor
Asphalt Marshall Density Asphalt Maximum Theoretical Density (Rice)
COMMENTS: Test locations and elevations are approximate. Testing provides data only for a specific test location and to a limited depth.
Accompanying field report provides additional information. **Depth B.G. indicates depth below grade. Grade means the design finish grade of the
current type of fill material being placed. Bolded results indicate compaction below specified value.
Completed By: Bret Salazar Reviewed By: Bryan Hawkins
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 3 of 3
21312 30th Drive SE, Suite 110
ULTMA, Bothell, WA 98021-7010
7�� �A T �7 INC
Tel. 425-774-0106
HWAGEOSCIENCES I1VC. Fax. 425-774-2714
Field Report No.:
FR -012
Date (mm/dd/yy):
4/25/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
Owner
Client Representative
Weather
City of Renton
Bob Hanson
Cloudy/Light Rain, 50's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const. I
Ken
Daniel Walton
FIELD REPORT
SUMMARY OF FIELD TIME SPENT ON PROJECT TODAY:
Start Travel: 0700 Arrived at Site: 0815 Departed Site: 1430 End Travel: 1530
MISCELLANEOUS DETAILS: I arrived on the jobsite at 08:15 and set up a mobile laboratory in a parking lot on the west
side of Logan Avenue North. Two samples of soil cement were taken and each sample was compacted into four 4 -inch
split molds to match the wet density obtained with a Troxler 3440 nuclear density gauge by HWA representative Bret
Salazar. The samples were taken at 11:30 and 12:30 respectively.
Information for the samples taken today is as follows:
Sample 8: Taken at Station 16+25 at 11:30. One bucket was taken from each lane.
Sample 9: Taken at Station 20+00 at 12:30. One bucket was taken from each lane.
A total of 10.5 hours was charged to the job today for travel, loading and unloading of equipment, observation/testing,
and report writing.
SIGNATURES:
'e�
Signed I r��
HWA Field Representative
SUMMARY OF UNRESOLVED ISSUES
Item # Status
HWA Project Engineer or. Reviewer
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 1 of 1
21312 30th Drive SE, Suite 110
ULT"a I Bothell, WA 98021-7010
Tel. 425-774-0106
HWAGEOSCIENCES INC. Fax. 425-774-2714
Field Report No.:
FR -013
Date (mm/dd/yy):
4/26/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
Client
tient Representative
Weather
City of Renton
Bob Hanson
Partly Cloudy, 50's - 60's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
I Ken
Bret Salazar
FIELD REPORT
SUMMARY OF FIELD TIME SPENT ON PROJECT TODAY:
Start Travel: 1140 Arrived at Site: 1240 Departed Site: 1630 End Travel: 1730
HWA INSPECTION ACTIVITIES, OBSERVATIONS AND/OR COMMENTS:
HWA made a visit to the jobsite to observe the cement treatment of subgrade beneath the southbound lanes and
shoulder of Logan Avenue N, and on N 3rd Street at the intersection with Logan Avenue N. The rotovator had been
repaired through the night, and HWA was contacted at 0955 to inform us that cement treatment was planned to be
completed across the site today. The crew began work at the northern end of the quarry spalls, at Sta. 26+25, heading
northward. Approximately 14 pounds per square foot of Portland cement was planned to be placed on top of the existing
subgrade with a spreading truck. Due to the spreading techniques and the dust guard on the spreader truck, a
representative sample was difficult to collect using a measured pan without introducing innacuracies. I measured the
area that was covered by one complete delivery truck and divided that by the tonnage of the truck. It was determined
that approximately 14 lbs per square foot of cement was being applied to the subgrade at the start of the job. The spread
rate was reported and adjusted.
The material was tilled and mixed into the subgrade using a CMI/Terex RS -650 rotovator in 7 -foot wide swaths to a
depth of 16 -inches below the top of the existing grade. Due to shallow high-pressure water crossings on N 4th Street,
material was mixed near the intersection using the bucket of an excavator instead of the rotovator. The degree of mixing
was verified by frequent potholing to the full mixing depth (16 inches) and utilizing Phenolphthalein to indicate the
presence of the cement. The material directly behind the rotovator was tested with a nuclear density gauge to determine
the approximate moisture content. The material was then spread with a CAT D5G dozer and a CAT 140H motorgrader
to grade, and compacted with a CAT CS533E single smooth drum roller. Compaction was performed in static and in
vibratory mode, depending on the moisture and fines content of the soil. A nuclear density gauge was used to take
compaction tests along the roadway; the specific locations and elevations tested are summarized on the attached 'Field
Compaction Test Report'. Samples of the tested material were collected for moisture content verification.
A lab technician from HWA was on site to collect samples of cement -treated soil. The two samples comprsied of 4
specimens each were molded in 4 -inch split proctor molds on site, and returned to HWA's lab in Bothell for compressive
strength testing.
A total of 6.5 hours was charged to the job today for equipment load/unload, travel, observation/testing, standby, sample
entry, and report writing.
Signed <L_..�— Reviewed Axl ..
HWA Field Repsesentats4e HWA Project Engineer
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 1 of 3
21312 30th Drive SE, Suite 110
ULTMA,
Bothell, WA 98021-7010
HWAGE�7� �A(T 7 INC.el. 425-774-0106
OSCIENCES IlVFax. 425-774-2714
Field Report No.:
FR -013
Date (mm/dd/yy):
4/26/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
Client
CEnt Representative
Weather
City of Renton
Bob Hanson
Partly Cloudy, 50's - 60's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
Ken
Bret Salazar
Photo 1: Mixing cement into existing su
de with cement placement in foreground
1 v
j.h
Photo 2: Potholing in processed material and spraying sidewalls with Phenolphthalein to ensure mixing.
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 2 of 3
ff�21312 30th Drive SE, Suite 110
iy A Bothell, WA 98021-7010
\iTel. 425-774-0106
fiWAGEOSCIENCES INC. Fax. 425-774-2714
Field Report No.:
FR -013
Date (mm/dd/yy):
4/26/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
Field Test
tient
Client Representative
Weather
City of Renton
Bob Hanson
Partly Cloudy, 50's - 60's
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
Ken
Bret Salazar
FIELD COMPACTION TEST REPORT - NUCLEAR METHOD
MATERIAL BEING PLACED: see accompanying field report
PROJECT IMPROVEMENT TESTED: see accompanying field report
Test Method X ASTM D6938 (soil) ASTM D2950 (asphalt) Other:
Densometer: X Troxler 3440 Troxler 3430 Troxler 3411-B CPN MCI -DR -P
Serial #: 37406 Density Standard Count.: 2467 Moisture Standard Count: 715
*Lab Control: Standard Proctor X Modified Proctor
Asphalt Marshall Density Asphalt Maximum Theoretical Density (Rice)
COMMENTS: Test locations and elevations are approximate. Testing provides data only for a specific test location and to a limited depth.
Accompanying field report provides additional information. **Depth B.G. indicates depth below grade. Grade means the design finish grade of the
current type of fill material being placed. Bolded results indicate compaction below specified value.
Completed By: Bret Salazar Reviewed By: Bryan Hawkins
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 3 of 3
Elev'n
Lab Control*
Field Test
Relative
or
Probe
(Proctor/Rice/Marshall)
Density
Moist.
Compaction
Test
Depth
Depth
ID
Max.
Opt.
Over
Total
Dry
Moist.
Field
Spec
No.
Detailed Test Location
B.G.**
(in)
#
Dens.
Moist.
Size %
pcf
pcf
%
%
%
Logan Ave N, Southbound, Sta.
1
33+75, 25' Lett of CL
SG
8
134.9
127.9
5.4
Logan Ave N, Southbound, Sta.
2
33+80, 18' Left of CL
SG
8
136.4
128.8
5.9
Logan Ave N, Southbound, Sta.
3
33+85, 10' Left of CL
SG
8
136.2
128.4
6.1
N 3rd St, Westbound, Sta. 100+90,
4
15'NofCL
SG
8
135.7
126.6
7.2
N 3rd St, Westbound, Sta. 100+95,
5
15'NofCL
SG
8
136.2
127.4
6.9
N 3rd St, Westbound, Sta. 101+00,
6
15'NofCL
SG
8
135.3
126.7
6.8
7
8
9
10
11
12
13
Test Method X ASTM D6938 (soil) ASTM D2950 (asphalt) Other:
Densometer: X Troxler 3440 Troxler 3430 Troxler 3411-B CPN MCI -DR -P
Serial #: 37406 Density Standard Count.: 2467 Moisture Standard Count: 715
*Lab Control: Standard Proctor X Modified Proctor
Asphalt Marshall Density Asphalt Maximum Theoretical Density (Rice)
COMMENTS: Test locations and elevations are approximate. Testing provides data only for a specific test location and to a limited depth.
Accompanying field report provides additional information. **Depth B.G. indicates depth below grade. Grade means the design finish grade of the
current type of fill material being placed. Bolded results indicate compaction below specified value.
Completed By: Bret Salazar Reviewed By: Bryan Hawkins
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 3 of 3
21312 30th Drive SE, Suite 110
Bothell, WA 98021-7010
TA T INC.
Tel. 425-774-0106
HWAGEOSCIENCES C. Fax.425-774-2714
Field Report No.:
FR -014
Date (mm/dd/yy):
4/26/2016
HWA Project No.:
2013-063-21
HWA Task No.:
200
Project Name
Location or Address of Project
PO No.
Logan Avenue North Improvements
Logan Avenue N. Renton, WA 98055
caner
Client Representative
Weather
City of Renton
Bob Hanson
Mostly sunny, 60s
Design Authority (engineer or architect of record)
Design Authority Representative
HWA Project Manager
Perteet
Shawn Shirey
Bryan Hawkins
General Contractor
General Contractor Representative
HWA Field Representative
Johansen Excavating/Ground Up Const.
I Ken
Daniel Walton
FIELD REPORT
SUMMARY OF FIELD TIME SPENT ON PROJECT TODAY:
Start Travel: 1130 Arrived at Site: 1210 Departed Site: 1630 End Travel: 1745
MISCELLANEOUS DETAILS: I arrived on the jobsite at 12:10 and set up a mobile laboratory in a parking lot on the west
side of Logan Avenue North. Two samples of soil cement were taken and each sample was compacted into four 4 -inch
split molds to match the wet density obtained with a Troxler 3440 nuclear density gauge by HWA representative Bret
Salazar. The samples were taken at 13:30 and 14:30 respectively.
Information for the samples taken today is as follows:
Sample 10: Taken at Station 33+75 at 13:30. One bucket was taken from each lane.
Sample 11: Taken at Station 100+90 at 14:30. One bucket was taken from the westbound lane.
A total of 8.0 hours was charged to the job today for travel, loading and unloading of equipment, observation/testing, and
report writing.
SIGNATURES:
Signed-
HWA Field Representative
SUMMARY OF UNRESOLVED ISSUES
Item # Status
HWA Project Engineer or Reviewer
This report should only be reproduced in its entirety. Report is not final until signed by HWA field representative and HWA reviewer. Page 1 of 1