HomeMy WebLinkAboutKC-16-104 & KC-16-105 - 28-Day Breaks - SG5 & BO #1 - #4 - 03-18-16L -M
111 Wlime Aveljue ISG- 131 Ir. 1 .
I'Mit0 �. WA `99U16-41
Pfinix: (dUO) _JU l lU
Conricte Compez.iiou Tc,t Rupert KingCouniy Fa.: (S06) ,96 -UI /J
ConCre[e Compression Test Report
PmEnA:
city of Renton - Luyan Ave N.
Prujeut Mum6er:
1126896
Concrete Placed By:
Amaya Electric
Pial emuntt intsput ter:
Shawn Shirey
Concrete Supplier:
Miles
Tests and Cylinders by:
Casey Wagner
Plant Lvcativn:
Pacitic - 202
Mix Desiyn Mum5er:
04432F
Placement Lvtativn:
su5 Founaativ" Matt & eight
Pule Shatt Bases Bu# 1 -4
Concrete Use:
Shafts Strenyth Spcuifivativn: 4000pSi at 2s Clays
Slamp: 61/2',
Air Content: 1.6% Design w/(cTp)
0.44 Date Cylinders Cast:
3/18/16
Unit Weiyht: 15u.upcf
I emperature: 61'r Actual w/(c+p)
0.41 Time Cylinders Cast:
14:28
AyyrCyatC Svurue(s):
Coarse: B-329, Fine: B-329
AS I M c39: Test Methud tur Cum
imens
Remarks: R f WS S P f t U (4) & 6 3(_
t -P d 19 A M RI 4 1 31,
res n
S 5 i 6: C W 47, 920,8
ate sasE 01 a Date I ital Date
orm Field Concrete Test Report Revised 8/41/on