HomeMy WebLinkAboutKC-16-153 & KC-15-154 - 28-day break - Sidewalk 4th to 6th - 03-30-16L9 155 Monroe Avenue NL, Bldg. U,
Rmitm- WA 98056-4199
Phone: (306) 296-7709
Uoncrele Uompression Test Report King Cvur>rty r.,,.: X205) z95-01 i9
Cuourde Cumuresslun Test Repurt
Project: City of Renton - Cogan Ave N. Project Dumber: 1126896
Lunuretu Placed By: Rigfimark Concrete Placement Inspeutur: Shawn Shirey
Cum;rety Supplier: Miles I cats and Vylinavra 6y: Caacy Waynwr
Plant Location:
Placement Location:
uuncrete Use:
Slur—lip:
Pacific - 203 Mix Design Dumber: 044zA
Sidewalk (0 East side of Cogan Ave from 4th to 6th 1 of 2
SidewalR 5trengtH 5peciticatiun: Ouupsi at 2S days
51/2" Air uuntunt: 5.4% Dcaiyn w/(c;+p) 0.44 Date uylintlers oast: 3/30/16
Unit Weight: 143.7Ncf Temperature:
69°F Actual w/(c+p) 0.40 Time Cylinders Cast: 8:56
Aggregate Soarce(s): Coarae: 6-3zu, Fine: 9-3zu
RemarRo: S I S p fi ( ) ( )
gAS M . 1 . 14 3 ---
X
Material
,ppr fxt/7 7 Iestatiam
As #bud7 E Subnwlted By: GW �<.rzvI6
a,eria#s Engineer Date initial Da,e
Form: F ie 0 ioncr , I s R port Rewsm- 8121106