HomeMy WebLinkAboutKC-16-161 & KC-16-162 - 28-day break - P18 21 26 28 30 Foundations - 03-31-16L9 155 Monroe Avenue NE. Bldg. D,
Kehiatt_ WA 98056-4199
Pfiaue: (206) 596-7709
concrete compression Test Report King Cvurlty haw: (206) Z95 -UI /9
Project: City of Renton - Cogan Ave N.
Luncrete Placed By: Amaya Electric
L;unt;rutu Supplier: Miles
Plant Location:
Pacific - 202
Project Namber: 1126896
Placement Inspectur: Shawn Shirey
1 ust5 and c;ylinaers try: c;aaey Wctyner
Mix Design Dumber: 0443zF
Placement Location: Pole Bases P-18, 21, 26, 28, & 30
Guncrete Use: Shafts Strenyth Specificatiun: 4000psi at 28 days
Slamp: 5 3/4" Air uuntent: 1.6% Desiyn w/(t;+p) 0.44 Date uylinaers cast: 3/31/16
Unit Weiyht: 150.Opef Temperature: 74°F AAuctl w/(c+p) 0.36 Time Cylinders Cast: 14:18
Aggregate Source(s): Uaarse: 6-3za, 1- ne: 6-3zy
Remarks:
d
VVIOL
—2FF
Approved for est a na
Distribution By l v b Su mittod y. Cw GV a 14
Ma Is %%ser )ate im, al at
orm �-Ielti Concrete i est Repoli ReviseC: 82 VOS