Concrete Compression Test Report King County Fax: (206) 296-0179
Concrete Compression Test Repoli
Project: City of Renton - Logan Ave Ia.
Concrete Placed By: Amaya Electric
Cunurete Supplier: Miles
Plant Lucatiun:
Placement Location:
Concrete Use:
Slump:
Sumner - 202
Prujaut I9um5er:
1126896
Placement Inspector: Shawn Snirey
Tests and Cylinders by: Casey Wagner
Mix Desiyn I9um6er: 04432F
Signal Base P1 a P8, Signal i cps
Pole Bases Strength Specification: 4uuup5i at 2t3 aays
Air Content: 1.6% Design w/(c+p) 0.44 Date Cylinders Cast: 5/6/16
Unit WciyHt: 150.Opcf I emperature: 69-F Actual w/(c+p) u.41 I ime Cylinders Cast:
Ayyreyate Suuruu(sy Coarse: B-329, Fine: B-329
Test e v wr Uumpratisive Strength ot Cylindricale SPec* e
Fracture
Type
Aye at
( eating
(Days)
Lab Number
Date
Received
Date of
Test
i✓linger Dimensions
y
I Otal load
(Lbs)
unit [oda
(psi)
unit Load
(PIPa)
Lci� th
[7�amatar
ulamatar �
Area
Type 2
7
KC -16-250
5/7/16
5/13/16
8.00in
4.00in
4.01 in
12.60in2
74,120
5880
4u.5
28
RL-16-zbl
5/7/16
6/3/16
Z8
I%1;-16-z5z
5///15
5/3/16
KC -16-253
Ri5tcry ct Individual compressive Strength Tests For This Project and Mix ID
Remarks: Reference: WSDOT Std. Specifications 6-uz.3(4) & 6-uz.3(5).
Field tests performed using ASTM C31/C3iM, CiM, C143, C1 /z, Cz31, and Club4.
Material
meets
fails to meet above specifications.
Approved for Tested and
Distribution By suliminett By:
Mate.'als Engineer Date Initial Date
Form: Field Concrete Test Report Revised: B/2 ,Ma
Second Most Recent First Most Recent Current Individual Strength
Individual Strength Test Individual Strength Test Test
lianniny Aveiaye
of the Three Most
Recent Individual
Strength Tests
Date of Test
b/3/LUIb
Cylinder Strength
Avera a Strength
Remarks: Reference: WSDOT Std. Specifications 6-uz.3(4) & 6-uz.3(5).
Field tests performed using ASTM C31/C3iM, CiM, C143, C1 /z, Cz31, and Club4.
Material
meets
fails to meet above specifications.
Approved for Tested and
Distribution By suliminett By:
Mate.'als Engineer Date Initial Date
Form: Field Concrete Test Report Revised: B/2 ,Ma