Loading...
HomeMy WebLinkAboutKC-16-251 & KC-16-252 - 28 day break - P1 P8 Foundation SG Tops - 05-06-16L9 155 Monroe Avenue NC, 131de. 1), Kenton, WA 98056-4199 Phone: (206)296-//09 Concrete ress C:om ion Tesr Report Kin Count , P N g y hon: (:Uti) 296-01/9 cullicilift —C111111111PRIN-31-011111-1111SURVOrt Project: City of Renton - Logan Ave N. Project Dumber: 1126896 uunerete Plauud By: Amaya Electric Placement Inspector: Shawn Shirey Cun urctc Supplier: Miles I usts and uylindurs t y: Casey wagner Plant Location: Sumner - zOz Mix Design Number: u4432F Placement Location: KC -16-250 Signal Base P1 & P8, Signal Tops 5/13/16 ucincrete Use: Pole Bases Strenyth Specitication: 4000psi at 28 days Slump: 6 Air Uuntunt: 1.6% Dusiyn w/(c:+p) 0.44 Datu uylindurs oast: o/6/16 Unit Weight: 150.Opcf Temperaturc: 69°F Actual w/(D+p) 0.41 1 imc uylindcrs Cast: 7:12 Aggregate Source(s): Coarse: 6-3zy, Finu: 6-3zu 4.02in 12.63in2 ASTM C39: Test Method for Compressive Strength of COindrival Cuncirwty Siowvi,,,wr,5 Fracture Type YP Age at Testing (Days) Lab Number Date Received Date of Test Cylinder Dimensions Total Lead (Lbs) Lbs Unit Load (psi) Unit Load (MPa) Len th Diameter Diameter x Area Type 2 7 KC -16-250 5 ;" 5/7/16 5/13/16 8.00in 4.00in 4.01 in 12.60in2 74,120 5880 40.5 Tvpe 2 28 KC -16-251 6/3/16 8.00in 4.00in 4.02in 12.63in2 103,800 8220 56.7 Type 3 28 KC -16-252 5/7/16 6/3/16 7.99in 4.00in 4.02in 12.63in2 102,740 8140 56.1 History of Individual Compressive Strength Tests For This Project and Mix ID Second Most Recent First Most Recent Current Individual Strength Running Average Individual Strength Test Individual Strength Test Test of the Three Most Recent Individual Strength Tests Date of Test 5/30/2016 6/1/2.016 6/3/2016 ,Cylinder Strength 6820 si 6670 si 7750psi 7810psi 220 8si T 8140 si Avera a Strength I 6750psi 7780psi 8180psi I 7570psi Rer�iarRs: Reference: WSDOT Std. Specifications 6-02.3(4) & 6-02.3(5). Field tests performed using ASTM C31/C31 M, C138, C1437 C1727 C231, and C1064. Material X meets above specifications. fails to meet Approvetl or zlL Distribution B,: MaWnars Engineer Date Tested and Submitted By. cw ay-:;, Inivai Daie Form: Field Concrete Test Report