C:oncrere Compression Test Report King County u6) z96 -u 1 /9
Concrete Compression Test Report
Project: C;Ty of Renton - Ligan Avu Iq. Project Num5er: 1126896
Uunurete Placed By: Highmark Concrete PlaL;cmcnt Inspeutur: Shawn Shirey
uuncrete Supplier: Miles Tests and Cylinaers 6y: cusey Wagner
Plant Location: PaclTia - 203 Mix Design Number: 0442A
Placement Location: Sidewalk cal NortFi side of 3rd
cuncrete use: Sidewalk Strcnyth Speuiticatiun: 4000psi at 28 days
Slump: 51/z" Air Content: 5.4°r Design w/(c+p) 0.44 Date Cylinders Cast: 0/11/16
Unit vveiyMt: 142.3pcf Temperature: t6 -F Actual w/(c+p) 9.3y Time Cylinders Cast: 11:37
Aggregate Source(s): Coarse: B-329, Fine: B-329
As i IM c39: Test tOtethotl for ComnrPccivP_ SfrPnnffi rnf Cvlinrlriral r_nnr_rssrc Cnorimunc
Fracture
i ype
Age et
Tesung
(Days)
Lab Number
Date
Received
Date of
Test
uyiinde, Dimen0ions
Total Load
([60)
Unit Load
(psi)
Unit Load
(MPa)
Can th
Diameter
x Diameter
Area
I ype 2
1
KC -16-255
5/12/16
5/18/16
8.03in
4.0 i in
4.ut in
1 z.63inz
40V30
324U
22.3
28
KV-1ii-z5t5
wiz/16
6/8/16
28
KC- t n -z5 t
5/1 z/1 b
6/8/15
KC -16-258
History UST Individual Gvmpressive Strenatfi Tests For This Proieci and Mix ID
Remarks: Reference: WSDOT Std. Specifications 6-u2.3(4) & O -u2.3(5).
Field tests performed using ASTM C31/C31 M, C t 3is, C143, C t tz, Cz31. an'a u i i)64.
Material
meetb
fails t1/ meet above specifications.
Approved for TesLen an6
Distribution By. su6miaetl 5,:
IGlaienais Engineer Date - n h
Form: Melt! Cone,ete Test Report SMSOR: EVr°t/Dz8
Second Most Recent
First Most Recent
Current individual 5t,enyth
Running Average
intlividaa) St,ength i est
Individual Strength Test
Test
of the i hiee Most
Recent lndividaai
Strength Tests
Date of Test
6/8izu16
,Cylinder Strength
Hveja a 5tien th
Remarks: Reference: WSDOT Std. Specifications 6-u2.3(4) & O -u2.3(5).
Field tests performed using ASTM C31/C31 M, C t 3is, C143, C t tz, Cz31. an'a u i i)64.
Material
meetb
fails t1/ meet above specifications.
Approved for TesLen an6
Distribution By. su6miaetl 5,:
IGlaienais Engineer Date - n h
Form: Melt! Cone,ete Test Report SMSOR: EVr°t/Dz8