Loading...
HomeMy WebLinkAboutKC-16-343 & KC-16-344 - 28 day break - Sidewalk - 06-02-16Prujuct: city of Renton - Logan Ave N. Cuiwrutu Plauud 6y: Highmark concrete Concrete Supplier: Miles Plant Location: Plauemcnt Cucatiun: Concrete UJC: Pacific - 203 5idewalR Slump: 5 Air Cantu lt: Project Dumber: 1126896 Plaucment Inspuctur: Shawn 51hirey Tests ana Cyli� ldurs Dy: Maser Brown Mix Design Number: Sidewalk 044zA Strenytn Speciticatiun: 400opsi at 28 5.7% Dusiyn w7(u+p) 0.43 Datu Lylinaurs Last: 6/2/16 Unit Weight: 144./PCT Temperature: zU-F Actual w/(cep) 0.40 Time Cylinders Cast: 10:00 Ayyreyate Suurce(s): Coarse: n-azu, Fine: S-Utf days FraCTOM I ype 155 Monroe Avenue NE, Bldg. D. L9 keinnii. WA 98056-4199 Concrete Compression Test Report KiF 1'llollu: ('SUS) '_591)- / /U9 1"an: (SUb) !96-U1 /9 Total Load lCaa) Unit Load teal) Prujuct: city of Renton - Logan Ave N. Cuiwrutu Plauud 6y: Highmark concrete Concrete Supplier: Miles Plant Location: Plauemcnt Cucatiun: Concrete UJC: Pacific - 203 5idewalR Slump: 5 Air Cantu lt: Project Dumber: 1126896 Plaucment Inspuctur: Shawn 51hirey Tests ana Cyli� ldurs Dy: Maser Brown Mix Design Number: Sidewalk 044zA Strenytn Speciticatiun: 400opsi at 28 5.7% Dusiyn w7(u+p) 0.43 Datu Lylinaurs Last: 6/2/16 Unit Weight: 144./PCT Temperature: zU-F Actual w/(cep) 0.40 Time Cylinders Cast: 10:00 Ayyreyate Suurce(s): Coarse: n-azu, Fine: S-Utf days FraCTOM I ype Age at Tvaling (Days) Ca6Mam6er Date Hecei„ea uate of I est Cylinder Dimensions Total Load lCaa) Unit Load teal) Unit Load (I�Pa) Een th Diameter Diar�ieter x Area Type z / KC -lb -34z 6/3/115 Evv/16 Muzin 4.uuin 4.01in 12.6uin- 42./4U 33`Ju 23.4 Type 2 28 KC -16-343 6/3/16 6/30/16 8.01 in 4.00in 4.01 in 1z.6uin= I 58,u/u 461u 31.6 I ype 3 28 KC -16-344 6/3/16 6/30/16 7.99in 4.00in 4.01in 12.60inz 56,880 4520 31.2 History of Individual compressive Strength Tests For This Project and Mix ID Hermance:yyz5DO I jta. z5peciTitotiom, 6-U'L. (4) L. ( ). X meets Material above specifications. f to eet npprovw for Distribution tsy: Materials Engineer Date estaa ana Submitted By: CW -to Initial vDate Form: Field Concrete Test Repon Revisetl: arc1105 Second Plost Recent First IIoat HeCcnt COrrnl InBiv'aaai 5trenytn Running Average Individual Strength Test Individual Strength Test Test oT the I Firee Most Recent InOW10aal Strength Tests Date of 1 eat 6/1Fi/zu1Fi 6n6/zul6 6/30/2016 linger 5tren tPi 4130 .A 41 to ai 4166 Si 4640 Si 4610 sl 4520 sl ri✓ Avera a Stren th 4/5upsi 4/00psi 45/ups1 4b/U Si Hermance:yyz5DO I jta. z5peciTitotiom, 6-U'L. (4) L. ( ). X meets Material above specifications. f to eet npprovw for Distribution tsy: Materials Engineer Date estaa ana Submitted By: CW -to Initial vDate Form: Field Concrete Test Repon Revisetl: arc1105