HomeMy WebLinkAboutAdmin Report
Mayor’s Office
Memorandum
DATE: June 13, 2022
TO: Ryan McIrvin, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Juneteenth is the celebration commemorating the emancipation of the last enslaved
African Americans on June 19, 1865, in Galveston, Texas. Several community groups
have activities planned for June 18:
Annual Community BBQ: presented by Doug Baldwin Jr. and United Way of King
County. Saturday, June 18, 11 a.m. to 3 p.m., Renton Memorial Stadium. Tickets are
$10 per person.
"And Still We Rise:" Free community celebration. Saturday, June 18, at noon, BLM
Mural (302 Lake Street).
Juneteenth Celebration and Festival: Free. Presented by Renton School District.
Saturday, June 18, 2 to 6 p.m., Campbell Elementary (6418 S 124th St, Seattle
98178). Activities will include a BBQ, games, a job fair, & more. For more
information and to register, go to coopartnerships.org.
• On Tuesday June 28, the Urban Forestry Division will be doing tree removal for public
and road user safety on Maple Valley Highway on the westbound side, west of the
parking area for Riverview Park. Traffic will be reduced to one lane in either direction on
the eastbound side from 9:30 am until 2:30 pm. There will also be brief closures of all
four lanes of traffic due to the position of the tree being removed.
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.gov/traffic. All projects
are weather permitting and unless otherwise noted, streets will always remain open.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
Monday, June 13 through Friday, June 17, 7:00 am to 2:30 pm. Single intermittent
lane closures on the southernmost eastbound lane closure on NE Sunset Boulevard
between Aberdeen Ave NE overpass and Harrington Avenue NE due to utility
construction. Questions may be directed to Brad Stocco, 425-282 -2373 .
Ryan McIrvin, Council President
Members of Renton City Council
Page 2 of 2
June 13, 2022
Monday, June 13 through Friday, June 17 , 7:00 am to 4:00 pm. Asphalt repairs on
S. 3rd Pl between Rainier Ave S and Shattuck Ave S will impact east and westbound
traffic on S. 3rd St . Flaggers will be there directing traffic.
Monday, June 13 through Friday, June 17, 8:30 am to 3:00 pm. Intermittent lane
closures on Logan Avenue N just south of N 8th Street due to roadway construction.
Questions may be directed to Brad Stocco, 425-282-2373.
Monday, June 13 through Friday, June 17, 8:30 am to 3:00 pm. Intermittent lane
closures on N 8th Street between Logan Avenue N and Park Avenue N due to
roadway construction. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, June 13 through Friday, June 17, 8:30 am to 3:00 pm. Intermittent lane
closures in both directions of Duvall Avenue NE between NE 12th Street and NE
Sunset Blvd due to utility construction. Questions may be directed to Tom Main,
206-999 -1833.
Monday, June 13 through Friday, June 17, 8:30 am to 3:00 pm. Intermittent lane
closure at the 4100 block of Lincoln Ave NE due to utility and roadway construction.
Question s may be directed to Kip Braaten, 206-503-1746.
Downtown Utility Improvement Project. Completion of pavement restoration on
S. 3rd Street is dependent on weather and contractor scheduling. Expect
intermittent lane closures, parking restrictions, and detours as the contractor moves
around the downtown core to finish work. Additional information can be found at
rentonwa.gov/duip.
Duvall Avenue NE Project. Long-term double lane closure on the west side of Duvall
Ave NE between NE 9th Street and Sunset Boulevard for road construction. One
lane of traffic will be provided in each direction, tentative through August 29.
On-going Street Closure through October 4, 2023 (City of Renton Resolution No.
4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street and
Harrington Place NE in support of the Solera Development Project (LUA20-000305).
Questions may be directed to Brad Stocco, 425-282-2373.