Date Project Name Project No. Report No.
06/07/2022 Renton Elementary School 16 20180398E003 019
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Charlie Chou
Permit No. Client/Owner Attn Requested By
Renton School District No. 403 Ed Thomson Client
Engineer/Architect General Contractor Grading Contractor Weather
LPD / Hutteball + Oremus Cornerstone Continental Dirt Contractors/ Jerry Jr. Cloudy, 60’s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences Inc. (AESI) was on site for part-time geotechnical observation. Upon arrival, we met with representatives
from Cornerstone and Continental Dirt Contractors (CDC).
Area D Footing Backfill
While on-site, we observed CDC backfilling 1’ to 2’ deep footing edges in Area D using native till soils. The soil was brought by loader,
spread, and compacted in 1’ lifts using a track mounted hoepac. We probed the footing edges with a ½” diameter steel probe to 2”
and took density tests on the native till soil.
Table 1: Compaction Test Results (Water Line)
Test
No. Location
Approximate
Backfill Depth
Relative to Existing Ground Surface (ft)
Proctor
(ASTM D1557)
Dry Density
(pcf)
Moisture
%
Compaction
% Pass/Fail Notes
1 See Figure 1 0 133.5/8.2 127.4 8.7 95 Pass
2 See Figure 1 0 133.5/8.2 127.7 9.7 96 Pass
3 See Figure 1 0 133.5/8.2 128.5 8.3 96 Pass
4 See Figure 1 0 133.5/8.2 128.4 8.0 96 Pass
Photo 1. Compaction of 1’ to 3’ deep footing edges.
Date Project Name Project No. Report No.
06/07/2022 Renton ES 16 20180398E003 019
Page 2 of 2
FIELD REPORT
Figure 1: Plan sheet S2.04 (Area D). Footing backfill observed today highlighted in yellow.
Subgrades observed previously highlighted in blue.
1
2
3 4