Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-06-07_FR_019 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 06/07/2022 Renton Elementary School 16 20180398E003 019 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Charlie Chou Permit No. Client/Owner Attn Requested By Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather LPD / Hutteball + Oremus Cornerstone Continental Dirt Contractors/ Jerry Jr. Cloudy, 60’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on site for part-time geotechnical observation. Upon arrival, we met with representatives from Cornerstone and Continental Dirt Contractors (CDC). Area D Footing Backfill While on-site, we observed CDC backfilling 1’ to 2’ deep footing edges in Area D using native till soils. The soil was brought by loader, spread, and compacted in 1’ lifts using a track mounted hoepac. We probed the footing edges with a ½” diameter steel probe to 2” and took density tests on the native till soil. Table 1: Compaction Test Results (Water Line) Test No. Location Approximate Backfill Depth Relative to Existing Ground Surface (ft) Proctor (ASTM D1557) Dry Density (pcf) Moisture % Compaction % Pass/Fail Notes 1 See Figure 1 0 133.5/8.2 127.4 8.7 95 Pass 2 See Figure 1 0 133.5/8.2 127.7 9.7 96 Pass 3 See Figure 1 0 133.5/8.2 128.5 8.3 96 Pass 4 See Figure 1 0 133.5/8.2 128.4 8.0 96 Pass Photo 1. Compaction of 1’ to 3’ deep footing edges. Date Project Name Project No. Report No. 06/07/2022 Renton ES 16 20180398E003 019 Page 2 of 2 FIELD REPORT Figure 1: Plan sheet S2.04 (Area D). Footing backfill observed today highlighted in yellow. Subgrades observed previously highlighted in blue. 1 2 3 4