Loading...
HomeMy WebLinkAboutMFP22001551.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22001551 IVR Number: 22001551 Permit Information Permit Name: Comcast Cable Franchise Permit Address/Location:03/28/2022Application Date:3224059049Parcel Number: 4350 LAKE WASHINGTON BLVD N Permit Type:06/16/2022Issue Date:Franchise Permit Work Class:06/16/2023Expiration Date:Minor Utility Job Number: JB0000845743Franchise Type:Cable Description: Comcast JB0000845743 UPGRADE (3) VAULTS TO DOGHOUSES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Annie Robertson Cannon Construction LLC 406 Porter Way Milton, WA 98354 ApplicantX James Hefley Cannon Construction 3601 20th St E Suite 2 Fife, WA 98424 Applicant Sandra Castro Comcast B: (209) 561-4786Applicant Andrew Parker Comcast 410 Valley Ave NW, Suite 12 Bldg C Puyallup, WA 98371 B: (253) 225-0596Contact Andrew Parker comcast 410 Valley Ave NW Puyallup, WA 98371 B: (253) 864-4249Contact Michael Cannon Cannon Constructors Inc 406 Porter Way Milton, WA 98354 B: (253) 922-2787Contractor Business License Number: 41539Construction Contractor: CANNOCL791JK CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communications Management JB0000845743 V2 Andrew Parker 253-225-0596 andrew_parker2@comcast.com N 43DR ST & LK WASHINTON BLVD WAKVD0K00 1X2-WAKVD02G00 UPGRADE (3) VAULTS TO DOGHOUSES Cannon Construction LLC - David Standring 253-922-2787 601590363 20838 06/13/2022 MFP22001551 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 6/16/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering T2B/D - WAKVD02K00 1X2 - WAKVD02G00 2X4 (RN25A 2X2) - RF N 43RD ST & LAKE WASHINGTON BLVD N RENTON , WA 98056 9/12/2022 9/18/2022 0800 1600 Cannon Construction LLC Andrew Parker 253-225-0596 TIE INTO SPLICE CASE SP.WAKV.0426 WITH 48CT FIBER. -PLACE 48CT SHEATH 200' STORAGE @ RISER. -PULL 48 CT FIBER IN EXISTING CONDUIT, (TYPICAL). -PLACE 48CT SHEATH 200' STORAGE EVERY 1500'. X X MFP22001551 Scott Warlick CED 6/16/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) 4130 EOP EOP EOP EOP EOP EOP EOP EOP R2-1 NE 40TH STWTP ASPHALT ASPHALT ASPHALT ASPHALT EOP EOP EOP EOP EOP EOP EOP EOP SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES -For aerial work, there will be a moving traffic control setup -Will coordinate with businesses that will be affected by construction -Will have spotter on site to escort pedestrians through work zone -All work will stop while pedestrians are escorted through work zones -Will have no more than two work areas active at a time SITE NOTES -Maintain driveway access at all times -Place temporary "NO PARKING" signs at least 72 hours prior to work -Sidewalks to remain open during road work unless noted otherwiseFLAGGER SPOTTERWT LEGEND Work Vehicle Work Area Flagger Spotter N OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP NODE SEGMENTATION1JBLSPLIT PERMIT INTO MUTIPLE PARTS6/3/2022JB0000845743000 3 1 CS JBL 2/11/2022 NTS RENTON, WA 98056N 43RD ST & LK WASHINGTON BLVD NWAKVD02G00 1X2-WAKVD0G00 2X4 (RN25A)-RF17-050 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SHOULDER WORK 2-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN MFP22001551 2010 3526 2022 3606 2016 3600 2004 2110 EOPEOP EOP EOP EOP EOP EOPEOPEOPEOP EOPEOP EOP EOP EOP MONTEREY CT NENE 36TH ST NE 36TH STSIDEWALK SIDEWALKSIDEWALK SIDEWA L K SIDEWALK SIDEWALK SIDEWALKSIDEWALK ASPHALT ASPHALT ASPH A L T ASPH A L T ASPHALT ASPHALT ASPHALTASPHALTASPHALTGRASS LANDSCAPE GRASS LANDSCAPE GRASS LANDSCAPE GRASS LANDSCAPE GRA S SLAND S C A P E GRASS LANDSCAPE GRASS LANDSCAPE GRASS LANDSCAPE GRASS LANDSCAPE GRASS LANDSCAPE LANDSCAPELANDSCAPELANDSCAPELANDSCAPEDRIVEWAYDRIVEWAYDRIVEWAYV ROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROWROWROWROWROW ROW ROW ROWROW ROWROWXX WT XSIDEWALK SIDEWALK SIDEWALK R2-1 12' 45' SPOTTER 6 DEVICE MIN 50'-100' 22' 37' SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES -For aerial work, there will be a moving traffic control setup -Will coordinate with businesses that will be affected by construction -Will have spotter on site to escort pedestrians through work zone -All work will stop while pedestrians are escorted through work zones -Will have no more than two work areas active at a time SITE NOTES -Maintain driveway access at all times -Place temporary "NO PARKING" signs at least 72 hours prior to work -Sidewalks to remain open during road work unless noted otherwiseFLAGGER SPOTTERWT LEGEND Work Vehicle Work Area Flagger Spotter N OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP NODE SEGMENTATION1JBLSPLIT PERMIT INTO MUTIPLE PARTS6/3/2022JB0000845743000 3 2 CS JBL 2/11/2022 NTS RENTON, WA 98056N 43RD ST & LK WASHINGTON BLVD NWAKVD02G00 1X2-WAKVD0G00 2X4 (RN25A)-RF17-050 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANEWIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SHOULDER WORK 2-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN MFP22001551 2108 2109 2025 2103 2013 2102 3305 2019 EOPEOPEO PEOPEOP EOP EOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP NE 33RD PLMONTEREY LN NENE 33RD PL LANDSCAPE ASPHALT LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPEASPHALT ASPHALT ASPHALT ASPHALT ASPHALT SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALKSIDEWALKSI D EW A L K SIDEWALK DRIVEWAY DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYV ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW XX WT XASPHALTR2-1 X26 32' SPOTTER 6 DEVICE MIN 50'-100' SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-site traffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES -For aerial work, there will be a moving traffic control setup -Will coordinate with businesses that will be affected by construction -Will have spotter on site to escort pedestrians through work zone -All work will stop while pedestrians are escorted through work zones -Will have no more than two work areas active at a time SITE NOTES -Maintain driveway access at all times -Place temporary "NO PARKING" signs at least 72 hours prior to work -Sidewalks to remain open during road work unless noted otherwiseFLAGGER SPOTTERWT LEGEND Work Vehicle Work Area Flagger Spotter N OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP NODE SEGMENTATION1JBLSPLIT PERMIT INTO MUTIPLE PARTS6/3/2022JB0000845743000 3 3 CS JBL 2/11/2022 NTSRENTON, WA 98056N 43RD ST & LK WASHINGTON BLVD NWAKVD02G00 1X2-WAKVD0G00 2X4 (RN25A)-RF17-050 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANEWIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SHOULDER WORK 2-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN MFP22001551 2 1 2 3 SHEET INDEX: 1 - COVER SHEET 2 -GENERAL NOTES 3 -LEGEND 4-6 -DESIGN THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES CONTACTS: PROJECT MAP: *ALL FOOTAGES AND MATERIALS ARE ESTIMATED N BILL OF MATERIALS*: RE-LASH = OVER-LASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER (1)= TOTAL ROW FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 COMCAST N 43RD ST & LAKE WASHINGTON BLVD N RENTON , WA 98056 T2B/D - WAKVD02K00 1X2 - WAKVD02G00 2X4 (RN25A 2X2) - RF JB0000845743 NODE SEGMENTATION CANNON COMPANIES Chuck Schroeder - (253) 922-2787- cschroeder@cannonconstructioninc.com ROW FOOTAGES*: NEW BUILDING PATHWAY = EXISTING BUILDING PATHWAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL SITE FOOTAGE = 0 FT. 0 FT. 0 FT. 0 FT. 0 FT. SITE FOOTAGES*: TOTAL PROJECT FOOTAGE =0 FT. POLE INFORMATION: POLE COUNT = POLES THAT NEED PERMIT = POLES THAT NEED MAKE READY = TRANSMISSION = 0 DISTRIBUTION = 0 0 0 0 SCOPE OF WORK: -UPGRADE (3) VAULTS TO DOGHOUSES. MFP22001551 GENERAL NOTES STANDARD 1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS. 2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811 3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES. 4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES. 5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM. 6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE. 7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS. 8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED. 11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED. 12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION. TRAFFIC CONTROL 1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS. 2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN. SITE PREPARATION 1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE. 2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE). 3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. TRENCH EXCAVATION AND BACKFILL 1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS. 2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. UTILITY DUCT 1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT. 2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION. 3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE. 4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED. CEMENT CONCRETE PAVEMENT 1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF EACH JURISDICTION. ASPHALT CONCRETE PAVEMENT 1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION. GRAVEL AREAS 1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION. SITE RESTORATION 1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES. 2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND WATERED IN TO ENSURE ITS SURVIVAL. 3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO CONSTRUCTION. WATER QUALITY 1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S WATER QUALITY STANDARDS 2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE. DIRECTIONAL BORING 1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS. 2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES. FIRE PROTECTION 1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT. 2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT. AERIAL INSTALLATION 1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS. 2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION. 3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN WHERE APPLICABLE. 4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION. OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000845743WAKVD02K00 1X2-WAKVD02G00 2X4 (R25A 2X2)N 43RD ST & LAKE WASHINGTON BLVD NRENTON, WA 98056NODE SEGMENTATION17-050 2/9/2022 JBL CS NTS 0 0 0 2 616/3/2022SPLIT PERMIT INTO MUTIPLE PARTSJBLGENERAL NOTES MFP22001551 OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000845743WAKVD02K00 1X2-WAKVD02G00 2X4 (R25A 2X2)N 43RD ST & LAKE WASHINGTON BLVD NRENTON, WA 98056NODE SEGMENTATION17-050 2/9/2022 JBL CS NTS 0 0 0 3 616/3/2022SPLIT PERMIT INTO MUTIPLE PARTSJBLLEGEND EDGE OF PAVEMENT FOGLINE POWER COMMUNICATION SEWER DRAIN DRAINAGE DITCH GAS WATER TRAFFIC SIGNAL TELCOM STEAM UNKNOWN UTILITY RIGHT OF WAY TRAFFIC CONES PROPOSED NEW BORE STRAW WATTLES P LT CW R UTILITY POLE VAULT - SMALL PEDESTAL STREET LIGHT CROSSWALK LIGHT UTILITY RISER V VAULT - SMALL 444LA MANHOLE VAULT - 25TA CATCH BASIN CATCH BASIN WITH SOCK GLULAM UTILITY POLECENTER LINE LANE LINE FENCE HIGH VISIBILITY FENCE S SEWER MANHOLE D DRAIN MANHOLE W WATER MANHOLE V UTILITY VALVE SHRUBBERY BORE PIT VAULT - LARGE VAULT - 25TA C COMMUNICATION MANHOLE FIRE HYDRANT DISTANCE STATIONSTA 0+00 CONSTRUCTION NOTE CALLOUT# X.X DISTANCE DIMENSION ASPHALT SURFACE CONCRETE ROADWAY PANEL HF H-FRAME VAULT - LARGE CAB CABINET LEGEND LANE DIRECTION INDICATOR PROPOSED MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES A 7 LANDSCAPE CROSS SECTION SYMBOL CROSS SECTION NAME CROSS SECTION SHOWN ON PAGE FL FL P P TS TS C C D D DD DD DD DD DD G G W W T T ST ST ROW ROW S UK CB CB P P V V V V VV WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT #PHOTO LOCATOR SYMBOL PROPOSED NEW TRENCH EXISTING UNDERGROUND PATHWAY PROPOSED NEW AERIAL STRAND EXISTING AERIAL PATHWAY EXISTING SPLICE CASE PROPOSED SPLICE CASE EXISTING FIBER/COAX STORAGE PROPOSED FIBER/COAX STORAGE TREE EOP V VAULT - SMALL 444LA MANHOLE VAULT - 25TA VAULT - LARGE EXISTING - CONTINUED 233LA MANHOLE 233LA MANHOLE MFP22001551 3989 0 3925 3915 1800 1800 1800 1800 LINCOLN AVE NENE 40TH ST LINCOLN AVE NEEOPEOPEOPEOPEOPEO P EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOP EOP EO PEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPSIDEWALK ASPHALTASPHALTASPHALTASPHALTASPHALTASPHALTASPHALTASPHALTASPHALTASPHALTAS PH A LT AS PH A L TASPHALTASPHALTASPHALT ASPHALT SIDEWALK SIDEWALKSIDEWALK SIDEWALKASPHALTASPHALTWOODSWOODS WOODS WOODS WOODS WOODS WOODS LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE WOODS WOODS WOODSWOODS WOODS WOODS LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE WOODS WOODS WOODS LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE SIDEWALK ASPHALTASPHALTWOODS WOODS WOODSWOODS WOODS WOODS WOODSWOODS WOODS WOODS WOODSWOODS WOODS WOODS WOODSWOODS ROWROW ROW ROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROWUPGRADE TO DOGHOUSE FLFLFLFLFLFLFLFLFLFLFL FLFL FLFL FL FL FL FLFLFLFLFLFL FL FL FL FL FL FL OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000845743WAKVD02K00 1X2-WAKVD02G00 2X4 (R25A 2X2)N 43RD ST & LAKE WASHINGTON BLVD NRENTON, WA 98056NODE SEGMENTATION17-050 2/9/2022 JBL CS 1:40 0'20'40' 4 616/3/2022SPLIT PERMIT INTO MUTIPLE PARTSJBLDESIGN N MFP22001551 3612 3606 1930 3618 3601 2010 1924 3526 3614 2022 3606 3615 1912 3600 2016 3607 3600 2004 2110 NE 35TH PLMONTEREY CT NENE 35TH PL NE 36TH STLINCOLN CT NEMONTEREY PL NE NE 36TH ST NE 36TH ST EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOP EOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOPMONTEREY CT NEEOPEOP EOPEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOP EOP EOP EOPEOPEOPEOP EOP EOP EOP EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPSIDEWALK SIDEWALKSIDEWALK SIDEWALK SIDEWALKSIDEWALKSIDEWALK SIDEWALKSIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SID E W A L K SID E W A L K SIDE W A L K SIDEWALKSIDEWALKSIDEWALKSIDEWALKSIDEWALK SIDE W A L K SIDEWALK SIDEWALK SIDEWALKSIDEWALK ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHAL T ASPHAL T ASPHALT ASPHALT ASPHALTASPHALTASPHALTASPHALTASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT AS P H A L T AS P H A L TASPHALTASPHALTASPHALT ASPHALT GRASSLANDSCAPEGRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAP E GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE GRASSLANDSCAPE LANDSCAPELANDSCAPELANDSCAPELANDSCAPEDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYLANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPELANDSCAPEDRI VE WAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAY ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROW ROW ROW ROWROW ROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW RO W ROW ROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW UPGRADE TO DOGHOUSE V FLFLFLFL FL FL OF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000845743WAKVD02K00 1X2-WAKVD02G00 2X4 (R25A 2X2)N 43RD ST & LAKE WASHINGTON BLVD NRENTON, WA 98056NODE SEGMENTATION17-050 2/9/2022 JBL CS 1:40 0'20'40' 5 616/3/2022SPLIT PERMIT INTO MUTIPLE PARTSJBLDESIGN N MFP22001551 2002 3402 3310 3315 2115 3308 3408 3318 3407 3400 2108 2109 3300 2006 3316 20253306 2007 3401 2103 3315 3320 3309 3314 2013 3321 2102 3406 3305 2019 2030 2112 2117 NE 33RD PL ABERDEEN AVE NEMONTEREY LN NEMONTEREY CT NEMONTEREY CT NENE 33RD PL EOPEOPEOPEOPEOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOPEOPEOPEOPEOPEOPEO PEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOP EOPEOP E O P EOP EOP EOP EOPEOPEOPEOPDRIVEWAYLANDSCAPE ASPHALT EO P EO P EOP LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LANDSCAPE LA NDS CA PE LANDSCAP EASPHALTASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT ASPHALT A S PH A L T AS P H A L T ASPHA L T ASPHALT ASPHALT ASPHALT ASPHALT SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALK SIDEWALKSIDEWALKSIDEWALKSIDEWALKSI D E W A L K SIDEWAL K ASPHALTDRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAY DRIVEWAYDRIVEWAYDRIVE W A Y DRIVEWAY DRIVEWA Y DRIVEWAY DRIVEWAY DRIVEWAY N E 3 3 R D S T DRIVEWAY DRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDRIVEWAYDH UPGRADE TO DOGHOUSE ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW ROWROWROWROWROWROWOF APPROVED BY: PROJECT CODE: DRAWN BY: DATE: SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0000845743WAKVD02K00 1X2-WAKVD02G00 2X4 (R25A 2X2)N 43RD ST & LAKE WASHINGTON BLVD NRENTON, WA 98056NODE SEGMENTATION17-050 2/9/2022 JBL CS 1:40 0'20'40' 6 616/3/2022SPLIT PERMIT INTO MUTIPLE PARTSJBLDESIGN N MFP22001551