HomeMy WebLinkAboutT-417903ti
� � N
it n
Dry
Lu 0 ~
O
Q
AS-BUILTS CERTIFICATION: ASBUILT NOTE
THE ASBUILT INFORMATION DEPICTED ON THESE
I HEREBY CERTIFY THAT THE AS -BUILT MEASUREMENTS SHOWN �C91 PLANS IS BASED UPON FIELD SURVEY
: •'pfr wA.Sy ••.•�'
HEREON ARE TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE �
:.,� INFORMATION PROVIDED BY CORE DESIGN AND
n nin nrerr nr rirn irvrn ui Tr rrn ni n nu innv nnai_ nnna _ � ... ...... �. .�..��.. .-... ...-ram .. ... .-r... ..�.. ..
UNDERGROUND LOCATOR SERVICE
CALL BEFORE YOU DIG.
811
1 CONSTRUCTION RECORD DRAWINGS MEM 2/13/24 HHH SURVEYED: SCALE:
DESIGNED:
B VL
DRAWN:
BI/L ONE INCH
CHECKED: AT FULL SCALE
GMD IF NOT ONE INCH
N 0. REVISION BY DATE AP P R APPROVED: CTB SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
ILLUMINATION CONSTRUCTION NOTES
CONSTRUCT FOUNDATION PER CITY OF RENTON STANDARD PLAN 116.1.
O FURNISH AND INSTALL NEW POLE, LUMINAIRE, JUNCTION BOX, AND CONDUIT
PER ILLUMINATION POLE SCHEDULE, SHEET IL-03, AND CITY OF RENTON
STANDARD PLANS 1 16.1, 119, 120, AND 121.
20 EXISTING UTILITY POLE MOUNTED LUMINAIRE TO REMAIN.
OCONSTRUCT SERVICE CABINET FOUNDATION PER CITY OF RENTON STANDARD
PLAN 126.1. FURNISH AND INSTALL NEW SERVICE CABINET ON NEW
FOUNDATION PER CITY OF RENTON STANDARD PLANS 122.1 AND 126.1.
OTHE POWER SOURCE LOCATION WAS NOT KNOWN AT THE TIME OF PLAN
PREPARATION. THE CONTRACTOR SHALL COORDINATE WITH PSE TO IDENTIFY A
LOCATION FOR 1201240 VOLT SINGLE PHASE POWER SOURCE CONNECTION
INCLUDING COMPLETING ALL FORMS/APPLICATIONS AND PAYMENT OF ALL
ASSOCIATED FEES. PSE SHALL MAKE FINAL CONNECTION TO THE POWER
SOURCE. THE CONTRACTOR SHALL ASSUME 500 FEET OF TRENCHING TO
CONNECT TO POWER SOURCE FOR BIDDING PURPOSES.
OCONSTRUCT FOUNDATION PER CITY OF RENTON STANDARD PLAN 117.1.
FURNISH AND INSTALL NEW POLE, LUMINAIRE, JUNCTION BOX, AND CONDUIT
PER ILLUMINATION POLE SCHEDULE, SHEET IL-02, AND CITY OF RENTON
STANDARD PLANS 1 17.1, 119, 120, AND 121.
r-417903
CITY OF
RENTON
Planning/Building/Public Works Dept.
ILLUMINATION WIRING SCHEDULE
RACEWAY
CONDUIT
SIZE
ILLUM.
# 8
SERVICE
POWER
#2
EQUIP.
GROUND
NO.
1
2" SCH40 PVC
2
1
2
2" SCH80 PVC
2
1
3
3" SCH80 PVC
3
4
2" SCH40 PVC
4
1
* EQUIPMENT GROUND SIZE SHALL BE EQUAL TO OR
LARGER THAN THE LARGEST WIRE SIZE IN THE
CONDUIT.
SEE SHEET IL-03 FOR:
• ILLUMINATION GENERAL NOTES
• ILLUMINATION WIRING DIAGRAM
• BREAKER SCHEDULE
• PHOTOMETRIC CALCULATION SUMMARY
• ILLUMINATION POLE SCHEDULE
iiiiiii Z�
15 60
0 30 90
SCALE IN FEET
ILLUMINATION LEGEND
EX NEW DESCRIPTION
m r JUNCTION BOX TYPE 1, 2
ROADWAY SCALE LUMINAIRE POLE
COMBINED PED/ROADWAY SCALE
LUMINAIRE POLE
UTILITY POLE WITH LUMINAIRE
PEDESTRIAN SCALE LUMINAIRE POLE
— — — — — CONDUIT/CONDUCTOR
® SERVICE CABINET
O CONSTRUCTION NOTE
LUMINAIRE NO.
AWIRE NOTE
of wAsy �/c�
"�Fic z� Transportation Engineering Northwest
ASS dIVAL ECG\ Transportation Planning I Design I Traffic Impact & Operations
1 ] 400 SE 8th Street, Suite 200, Bellevue, WA 98004 1 Office (425) 889-6747
0,3107120241 Project Contact: Glen DuBreuil
Phone: 425-250-0582
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DATE:
CANOPY 0JI07124
4196L/NCOLNAVENE, RENTON, WA 98056 FIELDBOOK:
PAGE:
ILLUMINATION PLAN I IL-01
SHEET: OF:
104 107
M
O
O
O
PC
1
O
Z
Q
CONSTRUCT/ON RECORD DRA WINGS