Loading...
HomeMy WebLinkAbout21397-Submittal Letter-2022-06-21 June 21, 2022 Email: TMain@Rentonwa.gov Tom Main City of Renton Inspector 1055 South Grady Way Renton, WA 98057 RE: Final Close Out Items River Trail at Elliott Farm (fka Elliott Farms) Case No. C20005641 Our Job No. 21397 Dear Tom: We are addressing the punch list items from your Inspection Worksheet received June 1, 2022. Enclosed are following documents for your review and approval: 1. One set of revised As-Built Plans including Road and Drainage, Landscape, and Illumination Plans 2. One copy of the As-Built Bond Quantity Worksheet in Excel format The following outline provides each of your Final Punchlist Items related to the as-built plans in italics exactly as written, along with a response: verify existing 18 inch cmp at cb D3 is FILLED with CDF Response: The existing 18” CMP pipe was shown incorrectly on the plans and no longer needs to be filled with CDF. The existing 18” pipe headed SE to the existing Pioneer Place Pond will remain. See revised sheet Cb D1 was to be connected to existing pipe. No existing pipe to connect to? Trash Rack? Response: The 18” DI pipe was connected to CB #D1. The notations on Sheet 16 were revised. Complete landscaping. Response: Landscape as-builts included with this submittal Construct path along south side of plat including stairs Response: Stairs on Lot 39 are deferred per DEF22001233 and plat conditions Correct plan set sheet 16 CB D1 Remove connect to existing verbiage Response: The notation was removed from Sheet 16. Place markings on sr 169 Sheet 17 Tom Main City of Renton Inspector -2- June 21, 2022 Response: Deferred per DEF2200989 Sheet 17 Markings should not say proposed. Correct. Response: The plans were revised to remove the reference to proposed improvements. Update as built plans to show trail once it is completed Response: The trail was built per the approved plans. See the enclosed updated as-builts. We believe that the above responses, together with the enclosed revised plans, address the items in your Final Punchlist received June 1, 2022. Please review and approve the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Sincerely, Mark Sumrok Senior Project Engineer MTS/ns 21397c.010.docx enc: As Noted cc: Jeff Beckmann, Tri Pointe Homes, Inc. Barbara Yarington, Tri Pointe Homes, Inc. Barry Talkington, Barghausen Consulting Engineers, Inc.