Summary of Bidders Inquiries No. 2
2022 Overlay
Date: June 29, 2022
The responses to bidder inquiries, unless incorporated into a formal addendum to the contract,
are not part of the contract and are provided for the bidders’ convenience only. The responses
may be considered along with all other information furnished to prospective bidders for the
purpose of bidding on the project. The use of information provided in the responses to bidder
inquiries is not to be construed in any way as a waiver of the provisions nor excuse the contractor
from full compliance with the contract requirements. Bidders are cautioned that subsequent
responses or contract addenda may affect or vary a response previously given and any such
subsequent response or addenda should be taken into consideration when submitting a bid for
the project.
Bidder Inquiry No. 1
Bid items 39 thru 43 have the unit as HR, I assume they should all be LF, can you confirm?
City of Renton Response to Bidder Inquiry No. 1
A contract addendum revising bid item units is forthcoming, and anticipated to be available by
end of day on 6/29/22.
Bidder Inquiry No. 2
There is no detail provided for Pavement Repair Excavation by the SY and no areas on the plan
show any. What is the depth of the excavation?
City of Renton Response to Bidder Inquiry No. 2
Refer to Special Provision 5-04.3(4)C for direction to excavate to a depth of 1.0 foot if no detail
is shown on the plans. The locations, if any, will be determined after the grinding is completed.
Bidder Inquiry No. 3
Is the unit of HR correct for item 43 Temporary Pavement Marking – Short Duration? Should it
be LF?
City of Renton Response to Bidder Inquiry No. 3
A contract addendum revising bid item units is forthcoming, and anticipated to be available by
end of day on 6/29/22.
End of Summary of Bidder Inquiries No. 2