HomeMy WebLinkAbout5719.05 S 05232022Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
www.esnw.com
FIELD REPORT
Project No. 5719.05 Page 1 of 4 Report ID 5719.05 S 05232022
Date Mon 5/23/2022 Weather 50F Sun
Arrival/Departure Time(s) 11:30 AM/ 11:45 AM Travel Time (hr)1.0
Project Name Solera
Location 2902 NE Sunset Blvd, Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Jackson Lundgren CESCL Number: EF8183892
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Heartland Construction, LLC | Craig Vierling, Benham Hansen
Permit No(s).
Reviewed By MTA
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project
objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.54 inches
Precipitation in last 24 hours (approximate): 0.00 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
•Record results in the table below.
•Hanna Turbidity Meter No.
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
WAR310291
Report ID 5719.05 S 05232022 Page 2 of 4
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
Buffer Zones around Sensitive AreasSilt Fence
G N Entire site is located on existing pavement. Silt
fences along southern margin of site. Recommend
placing silt fence along entire downslope margin.
2. Establish Construction Access
Fabric; Quarry Spalls
Wheel Wash
Sweeper Truck
G N Crushed rock construction entrance along eastern
margin of site, paved entrance along western
margin. Sweep as needed.
3. Control Flow RatesStormwater Vault or Facility
Straw Wattles
Check Dams
G N Contractor relayed excavation of swales along
southern margin of site was ongoing with sandbags,
check dams and straw wattles
4. Install Sediment Controls
Silt FenceStraw Bale Barriers
Vegetation
Straw
Sediment Ponds, Traps & FiltersTreatmentWater Truck
G N Silt fence installed partially along southern margin of
site, recommend installing silt fence along all
downslope margins.
5. Stabilize Soils
Nets & BlanketsMulch, Bark & Rock
Hydroseeding; Grass
Plastic Sheeting
Stockpiles
G N Plastic sheeting along cut slopes. Recommended
placing hydroseed along exposed unworked slopes
as needed.
6. Protect Slopes
Benching; Track-WalkingPipe Slope Drains
Plastic Sheeting; Anchors
G N Slopes covered in plastic sheeting
7.Protect Drain Inlets
Catch Basin Inserts G N CB inserts along NE 12th St as well as on site.
Sandbags and straw wattles around catch basins.
8. Stabilize Channels and Outlets
Channel LiningCheck Dam
Outlet Protection
Nets and Blankets
G N Add check dams along downslope margins as well
as sand bags.
9. Control Pollutants
Chemical Storage Area CoveredConcrete Handling - - N/A
10. Control Dewatering - - ESNW rep should be contacted before discharge
11. Maintain BMPs G N See recommendations
12.Maintain SWPPP & Site Logbook G N
13. Protect Low-Impact Development (LID BMPs)
Bioretention Rain Garden Facilities
Permeable Pavement - - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
Report ID 5719.05 S 05232022 Page 3 of 4
Earth Solutions NW, LLC
SILT FENCE
CATCH BASIN INSERT
STOCKPILE
JOB SHACK
CONSTRUCTION ENTRANCE
SANDBAGS
Report ID 5719.05 S 05232022 Page 4 of 4
Earth Solutions NW, LLC
Fig. 1: Plastic sheeting anchored with sandbags along over steepened slopes