CONSTRUCTION MITIGATION DESCRIPTION
King County Solid Waste Division (KCSWD)
Interim Maintenance Facility Improvements at Farwest
201 SW 34th St #4939, Renton, WA 98057
April 12, 2022
Requirement: Please provide a written narrative addressing each of the following:
1. Proposed construction dates (begin and end dates):
Response: June - September 2022
2. Hours and days of operation:
Response: Construction activities shall be restricted to 7am-8pm M-F, 9am-8pm on Saturdays, as
required by RMC 4-4-030C7.
3. Proposed hauling/transportation routes:
Response: Tenant improvements and move-in hauling/transportation hours shall be restricted to
between 8:30 and 3:30 M-F as required by RMC 4-4-030C7. Existing site access points and
vehicle transportation routes will be utilized. One exiting route is to go West out of the
site to Lind Ave. and go either North or South on Lind. The other is to go North out of the
site and go East to E.Valley Rd or West on 34th to Lind and go either North or South.
4. Measures to be implemented to minimize dust, traffic and transportation impacts, erosion, mud, noise,
and other noxious characteristics:
Response: Proposed scope for tenant improvements is anticipated to have minimal traffic, dust,
erosion, noise and mud to manage. We will implement targeted watering to keep dust at a
minimum, but there are no proposed improvements to non-asphalted areas, thus
effectively removing erosion, mud, or dust issues. We will be using the existing site
entrance points, and do not foresee any traffic or transportation impacts, nor noisy or
noxious situations.
5. Any special hours proposed for construction or hauling (i.e. weekends, late nights);
Response: We do not propose or anticipate any specialty hours for construction or hauling.
6. Preliminary traffic control plan:
Response: We plan to utilize the existing site access points at the North and West. We anticipate
most traffic to enter North from 34th St, therefore we would suggest a preliminary traffic
plan to exit to the West onto Lind Ave.
Note: If your project requires the use of cranes, please contact the City’s Airport Manager at 425-
430-7471 to determine whether Federal Aviation Administration (FAA) notification will be required.
Response: Not applicable.