Loading...
HomeMy WebLinkAbout20180398E003 Renton ES 16 2022-07-01 FR 034 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 1 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 07/01/2022 Renton Elementary School 16 20180398E003 034 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Bruce Guenzler Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 60’s THE FOLLOWING WAS NOTED: AESI arrived mid-morning at the request of the contractors in order to observe the aeration and compaction of lifts in the North grading area. Water main progress continued as detailed below. TESC weekly checklist was completed and submitted separately. North Grading Area: Aeration progress slowed substantially today due to overcast and cool temperatures. No additional fill was placed during our visit. Water Line: Water line progress to the south continued. A segment of water line excavated yesterday was backfilled with a combination of ballast rock and native soil that was too coarse for densometer testing. Fill was placed in lifts and qualitatively observed with a hand probe and visually and appears adequate to support the planned fire lane in our opinion.