Loading...
HomeMy WebLinkAbout20180398E003 Renton ES 16 2022-07-07 FR 036 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 3 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 07/07/2022 Renton Elementary School 16 20180398E003 036 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Bruce Guenzler Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sun 70’s THE FOLLOWING WAS NOTED: AESI arrived as requested to observe north grading area progress, water line progress, capillary break and vapor barrier progress in Building Area D, and footing and subfloor plumbing progress in Building Area C. Sketches follow the notes below outlining the areas discussed. North Grading Area: The northeast portion of the north grading area is still being aerated and is approximately 8 inches below blue flags on grade stakes. No compaction was done during our site visit, aeration continues, progress generally looks good and the area should be rechecked when the current lift has been dried sufficiently to be compacted. Rock Placement (North Grading Area): A portion of the north grading area was being capped with approximately 8 inches of imported crushed rock ballast rock to reach blue flags on grade stakes. No compaction was completed during our visit but the soil subgrade in this area was previously checked and appeared firm and unyielding, and equipment being used to place rock did not cause any rutting or yielding. Recheck when rock is compacted. Stockpile (North Grading Area): During our last visit excavated soil from the water line installation was being aerated at this location. A small working aeration pile remains but no work was actively underway in this area during our visit. Yielding Area (North Grading Area): An area near the east bus loop was observed to be yielding under construction traffic today as noted on the sketch below. This area appears to be partly under future landscaping and partly under future paving. Paving in this area is not planned for some time. Drying during summer weather is expected to improve the yielding conditions. We recommend that this area be reassessed prior to paving to verify that conditions are suitable for paving in that portion of the area where paving is planned. No immediate action is required unless it causes difficulty for construction access activities. Water Line: Water line progress continued toward the south from previously completed pipe placement. Soil cover required over the pipe and bedding in this area to reach subgrade is approximately 3 feet. Pipe laying and bedding was underway and ballast rock was staged for backfill but no backfill was completed during our site visit. Building Footings Area C: A small area of additional new footing was prepared today in Area C as shown below. The footing subgrade consisted of native soils, was firm and unyielding and suitable for structural support in our opinion, and was blanketed with a thin layer of crushed ballast as a working surface. 6 Date Project Name Project No. Report No. 07/07/2022 Renton ES 16 20180398E003 036 Page 2 of 3 FIELD REPORT Subfloor Plumbing Area C: Several subfloor plumbing pipes were backfilled in the noted area to shallow depths of typically around 2 feet. Backfill was ballast rock that is not testable with the nuclear densometer. Based on T probing and visual observations the plumbing backfill completed today in the noted area is firm and unyielding and suitable for support of floor slab in our opinion. Capillary Break and Vapor Barrier, Area D: Portions of the capillary break and vapor barrier were completed in Area D today as noted in the sketch below. The capillary break consisted of clean (no fines) crushed chip rock approximately ¾ inch in diameter. Capillary break and vapor barrier completed today in the noted areas appeared consistent with project plans and our recommendations in our opinion. North Grading Area Progress Today (See text) 6 Date Project Name Project No. Report No. 07/07/2022 Renton ES 16 20180398E003 036 Page 3 of 3 FIELD REPORT Building Area C Progress Today (See Text) Building Area D Progress Today (See Text)