Loading...
HomeMy WebLinkAbout20180398E003 Renton ES 16 2022-06-22 FR 026 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 4 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 06/22/2022 Renton Elementary School 16 20180398E003 026 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Zach Brodkey Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Drizzle, 60’s THE FOLLOWING WAS NOTED: Rock Drainage Channel: No substantial progress on this task today, placement of nonwoven fabric over drain rock is still pending (Figure 1). Northern Portion of Bus Loop Road: This portion of road in the Northeast corner of the site had been left to aerate overnight due to the wet, yielding till (Figure 1). The exposed surface did not aerate effectively on this day due to the lack of sun and presence of precipitation. The soil has improved somewhat and does not compact as easily under foot, but will still need more time to aerate. Other soils to the West of the road toward the rock drainage channel were being turned over for aeration as well. Plumbing-Electrical Conduits: Shallow plumbing and electrical conduits had been backfilled at <1 foot deep. Native soil backfill was used. The backfill areas were observed visually, probed, and nuclear gage density tests were performed (Figure 2). Two density tests were performed in the backfill over the plumbing pipe, each test passed at >95% compaction (Table 1). A fire service line trench was also observed with the pipe now in place. A bundle of electrical conduits placed in a trench running North-South through the same area was also observed. All trench subgrades and plumbing backfill observed today was firm and unyielding. Footing/Foundation Backfill: Backfill was observed around the large footings at the north end of building area C, on gridline AL (between A19.5-A16.5 and A15-A10) and the perpendicular intersecting footings to those two along gridlines A17 and A13 (Figure 3). The backfill of 2-1/2” minus material was placed in firm and unyielding lifts of <1 ft. Additionally, the large footing at gridlines (AL-AQ, A23) was partially backfilled with native soil and density tests were taken at two different depths from subgrade in the backfill (Table 1). Footing/Foundation Subgrade Observation: The subgrade for the large footing at gridlines (AL, A23.5-A21.5) and at five square spread footings along gridline AH from A24 to A14 and at gridlines (AJ-AL, A24) was finished and observed to be firm and unyielding, but no density tests were performed since the subgrade material is 2-1/2” minus crushed rock (Figure 3). 6 Date Project Name Project No. Report No. 06/22/2022 Renton ES 16 20180398E003 026 Page 2 of 4 FIELD REPORT Figure 1: Location of Areas of Interest Across Site Figure 2: Plumbing and Electrical Conduits Density Test Locations 6 Date Project Name Project No. Report No. 06/22/2022 Renton ES 16 20180398E003 026 Page 3 of 4 FIELD REPORT Figure 3: Footing/Foundation Backfill and Subgrade Locations Table 1: Density Test Results Test No. Location Depth from current grade (ft) Proctor (ASTM D1557) Dry Density (pcf) Moisture % Compaction % Pass/Fail 1 See Figure 2 0 133.5/8% 128.8 8.3 96.5 Pass 2 See Figure 2 0 133.5/8% 127.6 8.6 95.6 Pass 6 Date Project Name Project No. Report No. 06/22/2022 Renton ES 16 20180398E003 026 Page 4 of 4 FIELD REPORT Photos Location of Density Tests 4 and 3 Backfill near (AL, A13) facing North Location of Density Test 2 Electrical Conduits lying in the trench facing North