Loading...
HomeMy WebLinkAbout20180398E003 Renton ES 16 2022-06-24 FR 028 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 4 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 06/24/2022 Renton Elementary School 16 20180398E003 028 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Scott R. Hannah, L.G. Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 75 THE FOLLOWING WAS NOTED: Grading North: Upon our arrival at 10:45am, we observed the contractor was aerating the northern fill areas, including the bus loop road. CDC compacted the fill areas with a large, single drum, vibratory roller, including the bus loop road. The moisture contents in the southern area ranged from 10.2% to 12.8% with compaction tests results typically in the low 90% range. Some slight yielding underfoot in a few places was still observed. We discussed that a second lift could be placed since there was still 4 feet of fill needed to achieve grade and some areas were landscaping. Prior to our departure, CDC started placing a second lift with material that was staged on the gravel road to the south. With high temperatures predicted for this weekend Jerry Jr. had his crew start to aerate the material in- place again with plans for us to return at 9am tomorrow (Saturday) to check compaction. CDC continued to use their pull-behind disc to aerate the soil. 6 Date Project Name Project No. Report No. 06/24/2022 Renton ES 16 20180398E003 028 Page 2 of 4 FIELD REPORT Aerating Northern Portion of Bus Loop Road: Aerated and re-compacted soils along the western margin of the bus loop road were in a firm and unyielding condition. We informed Jerry that they could place another lift of soil to dry in the road area. The current grade along the outside of the road is approximately 2 feet low. Looking South 6 Date Project Name Project No. Report No. 06/24/2022 Renton ES 16 20180398E003 028 Page 3 of 4 FIELD REPORT Figure 1: Composite Plan Eastern soil stockpile Stormwater Facility #2 Green outlines represent fill proposed 1’- 5’ thick. Density test locations numbered in red 1 2 7 6 5 4 3 6 Date Project Name Project No. Report No. 06/24/2022 Renton ES 16 20180398E003 028 Page 4 of 4 FIELD REPORT Looking North