FIELD REPORT
Date Project Name Project No. Report No.
7/11/2022 Bethany Corner 20160674E002 044
Location Municipality AESI Project Manager AESI Field Rep
SE 165th St. Renton Matthew A. Miller, P.E. Scott R. Hannah, L.G.
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Earthwork Contractor Weather
HiLine Homes Tiger Mountain Homes / Mark Tiger Mountain Sunny, 80’s
THE FOLLOWING WAS NOTED:
Lot 6 House- Foundation Excavation:
Associated Earth Sciences Inc. (AESI) was onsite 12pm to observe the excavation for the house on Lot 6. Mark informed
us that over-excavation was required along the eastern portion of the building area where organic soil was observed
beyond the structural fill placed last year in the old temporary pond area. Mark was not onsite.
We observed the building area to be partially excavated with the deepest portion 8 to 9 feet below existing grade along
the eastern portion of the building area. No offset stakes or paint lines were present to identify the building corners or
the building envelope. Mark informed us that the foundation for the Lot 6 house will be about 6 inches west of the
existing ADU building. The deepest portion of the excavation exposed weathered to unweathered medium dense to
dense, suitably firm, native soil. The central portion of the excavation exposed previously placed, gray, sandy, structural
fill. The southern portion of the excavation was 6 feet deep and ended 12 feet from the western margin of the proposed
house. Most of the excavation was in a rougly graded condition.
We discussed with Mark afterwards that the deeper, eastern portion was suitable for placement of backfill with quarry
spalls or concrete recycle as similarily used on other Lot/ADU building excavations. We said that there appeared to still be
some organics near the northeastern portion of the excavation but, weren’t sure if it was within the building envelope.
We recommended that he establish the building envelope by staking or paint marks prior to our next site visit. The areas
of disturbed structural fill will need to be recompacted. Mark said he was not planning to be onsite for a couple weeks
but would get the building area outlined. We will return upon request.
Date Project Name Project No. Report No.
7/11/2022 Bethany Corner 20160674E002 044
Page 2 of 3
FIELD REPORT
8’-9’ deep by 8’ wide “trench” to expose suitably firm, native soil. East side of building area, looking N.
Southern portion of the excavation in sandy fill material. Looking E.
Date Project Name Project No. Report No.
7/11/2022 Bethany Corner 20160674E002 044
Page 3 of 3
FIELD REPORT
Excavation for Lot 6. Looking N-NW