Loading...
HomeMy WebLinkAboutRES 4473CITY OF RENTON, WASHINGTON RESOLUTION NO. 4473 A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AMENDING THE 2021/2022 CITY OF RENTON FEE SCHEDULE. WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which removed many fees from the Renton Municipal Code and consolidated them into the 2010 City of Renton Fee Schedule brochure, which has been subsequently amended; and WHEREAS, on November 9, 2020, the City Council passed Resolution No. 4422, adopting an amended fee schedule for 2021 and 2022, and WHEREAS, the fee schedule for 2021 and 2022 was subsequently amended by Resolution No. 4433, Resolution No. 4441, Resolution No. 4453, and Resolution No. 4467; and WHEREAS, it is necessary to approve an amended fee schedule to make periodic updates as part of the City's 2022 2"d Quarter budget amendment; and WHEREAS, it is further necessary to approve an amended fee schedule setting forth Parklet Rental fee under Section VI. Parks and Facilities Use and Rental section of the fee schedule; and WHEREAS, it is further necessary to approve an amended fee schedule updating Tree Fee in Lieu under Subsection 6 Miscellaneous Fees of Section XII. Development Fees of the fee schedule; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: 1 RESOLUTION NO. 4473 SECTION I. The fee schedule is amended and replaced with the 2021-2022 City of Renton Fee Schedule brochure, which is attached hereto and adopted by this reference ("Fee Schedule"). An updated copy of the Fee Schedule shall be filed with the City Cleric and available for public inspection. SECTION ll. The amended Fee Schedule adopted by Section I of this resolution shall be effective July 25, 2022, and thereafter act as the City of Renton's Fee Schedule for all fees or charges referenced therein. The Fee Schedule shall remain in effect until amended or otherwise replaced by the City Council. In the event the Fee Schedule is not amended prior to the year 2023, the fees specified for the year 2022 shall continue to apply into and beyond 2023 until amended by the City Council. PASSED BY THE CITY COUNCIL this 18th day of July, 2022. Jas A. Seth, i y Clerk APPROVED BY THE MAYOR this 18th day of Jam, 2022. Approved as to form: Shane Moloney, City Attorney RES-Finance:1913:6/17/22 t Armon o Pavone, Mayor ,0,,,,R,Hj''%, O SEAS, sn %, ''ems O�p ,`log, 'Jljf �0R47*ED`SE? 6��`�,� 2 Resolution No. 4473 City of Renton Fee Schedule 2021-2022 2021-2022 City of Renton Fee Schedule 'd Rev. June 2022 City of Renton Fee Schedule 2021-2022 Table. SECTION I. MISCELLANEOUS FEES 1 SECTION II. MAPLEWOOD GOLF COURSE 2 SECTION Ill. City CENTER PARKING FEES 2 SECTION IV. AQUATIC FEES 3 SECTION V. CARCO THEATER (REPEALED) 3 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 4 SECTION Vlll. AIRPORT CHARGES 4 SECTION IX. ANIMAL LICENSES FEES* - RMC 5-4-2 4 SECTION X. BUSINESS LICENSES 4 SECTION XI. ADULT ENTERTAINMENT LICENSES 4 SECTION XII. DEVELOPMENT FEES 4 Building Fees: 4 Land Use Review Fees: 6 Public Works Fees: 8 Technology Surcharge Fee 11 Impact Fees: 11 Miscellaneous Fees: 12 SECTION XIII, FIRE DEPARMENT FIRE MARSHAL FEES (RFA) 13 City of Renton Fee Schedule 2021-2022 SECTION I. MISCELLANEOUS FEES a. Zoning maps -standard 11 x 17 $q $4 b. Zoning maps -large 24 x 36 512 $12 c. Comprehensive Plan map - standard 12 x 17 $4 $4 d. Comprehensive Plan map - large 24 x 36 $12 $12 a. Precinct maps CS t; a. First page $2 $2 b, Each additional page $1 $1 3- Photocopies: a. Each 8.5" is 11" or 8.5" x 14" $0,15 $0.15 b. Each 11" x 17" $0.20 $0.20 C. Each 8_5" x 11' cc 8.5" x 14" color $o-25 $C.25 4. Budget: a. City's Budget $10 $10 b. City's Budget to other municipality or quasi -municipal corporation or other nonprofit charitable cr education organization N/C N/C 5. Audio or Video Recording Copies: a. Audio recording, each copy $2 $2 b. Video recording, each copy $2 $2 6. Regulations and Plans: a. Comprehensive Plan and Map $30 $30 b. Title IV, Development Regulations-, (i) Text and Zoning Map $110 5110 {ii) Text only Wic $100 C. Individual Chapters of Development Regulations $10 $10 d. Renton Municipal Code (two volumes) $400 $400 e. Code Supplements, per year (i) Titles I - III and VI -X $70 $70 (ii) TilIV $70 $70 7. Miscellaneous Services: a. CertftatlOn and Notary Fees -Clerk's Certification $10 $10 b. Notary Public Attestation or Acknowledgement or as $10 $to otherwise provided for in RCW 42.28.090, per signature C. Hold Harmless Agreements and other similar docu menu $20 $20 not otherwise provided for d. Lamination of licenses, pictures $6 S6 Community Development Block Grants (Cl Loan Program: (i) Application Fee (ii) Loan Origination Fee pi) Closing Costs (including any legal fees) $200 $200 $150 or 0-25%of loan amount, $150 or 0,25% of loan amount, whichever is greater 50% of total actual costs whichever is greater 50% of total actual costs g- Miscellaneous Charges for Police Services: a. Police Reports per page $0.15 $0.15 b. Record Checks (WrittenResponse) $5 $5 C. Photographs - Digital on CD $2 $2 d. Photographs - black & white or color -Cost of developing film Cost Cost e. Fingerprint Cards $5 $5 (i) Each additional card $1 $1 9. Charges for Fire Documents: a. Fire reports per page $0.15 $0.15 Ill. Fire investigative report an CD $2 $2 C. First copy - black & white or color - Cost of developing film Cost Cost d. Additional copy - black & white or color - Cost of developing film cost Cost 10- Computer Listings: a. City of Renton new business list $10 $10 b. List of all business Fcenses $20 $20 C. Copies requested to be faxed, local number $3 $3 d. Copies requested to be faxed, long distance number (1) One (1)- five (5)pages sic $10 (ii) Six (6) or more pages (ten (l0) page limit) 520 $20 11. Utility Fee: a. Special Request Water Meter Reading $30 $30 b. Utility New Account Setup $25 $25 C. Utility Billing Account Transfer (tenant billing form) $5 $5 it, Water utility outstanding balance search requested by $25 $25 fax, messenger, or letter 12. Schedule of Flnes for False Alarms -Security/Gurgfar: (effective February 1, 2019) a. One-time Registration Fee $25 $25 b. Annual Registration Renewal N/C N/C C. First False Alarm in a registration year' N/C N/C d. Second False Alarm in a registration year- $100 $100 e. Third or more False Alarm in a registration year' $250 $250 f. Late Payment Fee S25 $25 g. Unregistered Alarm System Fee $50 $5p -A registration yew shall mean January 1 thru flecember 31 each yew. 13. NSF Check Fees $25 $25 24. Veteran Park Tile: Three lines $75 $75 City of Renton Fee Schedule 2021-2022 SECTION• (CONTINUED) 15. Electronic Records: a. Photocopies or printed copies of electronic records, per page $015 $0.15 Is, Scanning paper records, per page $o.10 $0-10 C. Electronic files or attachments uploaded for electronic delivery (email, cloud -based data storage service, or $0.05 $0.05 other mea ns of electronic delivery), for each four (4) files d. Transmission of retards in an electronic format or for the use of agency equipment to send the records $0,10 $0. 10 electronically, per gigabyte (G8) 'The charges identified in 142-56. 120(3)(b) (and referenced above) may be combined to the extent that more than one type of charge applies to copies produced in response to a particular request. The actual cost of any digital storage media or device provided by the agency, Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the cost at uploading and transmitting the electronic records is reasonably estimated to equal or exceed that amount- Only one 52 flat fee per request is authorized for electronic records produced in installments- When records are provided electronically an a CD, DVD, thumb drive, flash drive, or other electronic device, the requester will be charged for the cast of the electronic storage device. The City may charge an actuahgst service charge for requests that require use of IT expertise to prepare data comilations or provide customized electronic access services when not used by the City for other purposes. A cost estimate and explanation will be provided to the requestor before incurring the costs. Option to waive charges. The City may waive charges associated with fulfilling a request. The decision will be based on various factors, including the volume and format of the responsive documents. The decision to assess fees for fulfilling a public records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff time required for copying, scanning, shipping, uploading, and/or transmitting the records associated with fulfilling a request. Certified copies. If the requestor is seeking a certified copy of a City record, an additional charge of $1,00 per each complete document may be applied to cover the additional expense and time required for certification. _ 16. Document Recording Fees: a. The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title company Actual Costs Actual Costs for processing, Payment in full shall by submitted to the City before documents are sent for recording. b. Miscellaneous charges associated with document recording, such as courier fees Actual Costs Actual Costs 17. Publication Fees: The applicant shall pay all Publication fees charged by publication outlet used by the City (The Seattle Times or equivalent). Actual Costs Actual Costs Payment in full shall be made to the City prior to public hearing, permit approval or issuance, whichever comes first, Nate: Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department administrator Vau authorize to waive the entire amount due at their discretion- •N [I. MAPLEWOOD GOLF COURSE 1. Green Fees': a. Weekday: (i) 18 Hale $39 $41 (ii) 9 Hale $29 $30 (iii) 18 Hale, Senior $30 $31 (iv) 9 Hole, Senior $22 $23 M 18 Hole, Jun for $21 $25 (vi) 9Hale, Jun for $17 $19 b. Weekend (1) I8 Hole $46 $48 (i) 9 Hole $29 $30 For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "Junior" shall mean ages 17 and under, "Senior" shall mean ages 61 and over, Off-season and promotional rates determined by management; posted on website, 2. Club Rental": a- Regular S25 $30 b. Premium $50 560 a. 18 Hole $34 536 b- 18 Hole Single Rider $26 $28 C. 9 Hole $22 $24 d. 9 Hole Single Rider $16 $18 e. Trail Fee $15 $15 f- Half Can, 18 1,401e $18 g. Ha if Cart, 9 Hole $12 4. Driving Range Fees": a. Large Bucket $11 512 Is. Small Bucket $6 $9 C. warm-up Bucket 54 $6 5. Lesson Fees: a. 1 2 Hour Private S45 $55 Is. 1 Hour Private $65 $80 C. 1/2 Hour Series Private $160 $200 d. 1 Hour Series Private $240 $3oo e. Group Series $100 $140 f. 1/2 Hour Private, Junior $25 $35 g. Playing Lesson(3-hole minimum/9-hole maximum) per hole $15 $25 ' Rates include Washington State Sales Tax (WSSTI ;enter Parking Garage Fees: ng rates for retail parking w Zero (0) -two (2) hours Two (:I - four (4) hours Four (4) -six (6) hours Six (6) - (10) hours 10 hours or more as follows: Monthly pass -holders, tax included N(C N/C $2 $2 $4 $4 $6 $6 $10 $10 535 $35 City of Renton Fee Scheduie 2021-2022 SECT!ION 1. Ad mission fort he Aquatic center shall be as follows: a. Regular Session, (1) Infants - under 1 year NJC N/C (ii) Youth -1 to 4 years $6 $8 (in) Ages 5 and up $11 $16 (iv) Lap swim- water walking only $5 $7 (v) Locker Rental $0.25 $0,25 b. Canopy Rental Fees': (includes canopy and admission for one leisure swim session(: {i) Henry Moses Party Tent #1 (10' x 20' for up to twenty-five (25) guests on wave pool): (1} Resident Rate, per session $450 $600 (2) Non-resident Rate, per session $550 $700 Ili) Henry Moses Parry Tent #2 {10' x 20' for up to twenty-five (25) guests): (1) Resident Rate $400 $500 (2) Nan -Resident Rate $500 $600 (iii) Henry Moses Party Tent 03 ( 30' x 10' for up to ten (10) guests(: (1) Resident Rate, per session $200 $25C (2) Non-resident Rate, per session $240 5300 C. Resident Rate all inclusive' $1,80e $3,800 d. Non-resident Rate all inclusive' $2,3CC $4,800 'Sales tax not included in the rental fee e. Swim Lesson Program. Fees and associated descriptions are published in the "What`s Happening " Renton Activities Guide 2. Boat Launch Rates: a. Daily resident -7 days a week $10 $15 b. Daily Nan -resident -7 days a week $20 $25 C. Overnight resident -7 days a week $20 $25 d. Overnight Non-resident -7 days a week $40 $45 e. Annual parking boat launch permit - resident $60 $70 f. Annual parking beat launch permit - non-resfdcnt $120 $130 g. Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area forweigh in and or electricity at the current rental rate) per event (1) Resident rate $so $75 b. Non-resident 10am-71 $280 $290 2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people: a. Resident 10ani $140 $150 b. Non-resident 10am-7pm $280 $290 e. South Shelters 1 & 2 Resident rate $300 $310 f. South Shelters 1 & 2 Non-resident rate $600 $610 3. Gene Coulon Beach Park Shelters (North Shelter): a. Resident 10am-7pm . $160 $zoo b. Non-resident 10am-7pm $320 $360 4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Mal Only): a- Tennis court (i) Resident rate $10 $25 (ii) Non-resident rate $10 $30 Ill Park basketball court (i) Resident rate $1C $25 {ii) Non-resident rate $1C $30 c. Sand volleyball court (1) Resident rate $10 $25 Non-resident rate $10 $30 pen ace Ani.n e Parksasn e, eas ae, Phillip Moll ear ver, a rngtan, ene u on, enr:oe, cony a e 5. Lions, Sunset, and Riverview Parks): a. Resident rate per hour $10 $23 b. Non-resident rate per hour $25 $30 c. Special Event Permit Fee $85 $85 6. Piazza Park Open Space Event Rental a. Full day rental 10ani-7pm 5500 $500 7. Photo Shoots per hour: a. Commercial Film and Photo Shoats per hour $300 $300 Sax 9. Athletic Field Rental, Lights and Prep Fees: a. Sports field rental per hour -resident $25 $30 b. 5ports field rental per hour - non-res ident $30 $36 C. Renton Area Youth Sports Agencies, per hour $6 $8 d. Field prep for softball/baseball - resident per occurrence $30 $35 e- Field prep for soccer - resident per occurrence $45 $50 f. Custom Field prep - resident per occurrence $100 $100 g. Field prep for soliball/baseball - non-resident per occurrence $35 $40 h. Field prep for soccer - non-resident per occurrence $50 $55 I. Custom Field prep - non-resident per occurrence Sing $100 j. Field lights all sports - resident per hour S25 $30 k. Field lights all sports - non-resident per hour $30 $36 City of Renton Fee Schedule 2021-2022 ISE61ON VI. PARKS AND [CONTINUED) 10. Banquet & Classroom Rental - Community Center & Senior Activity Center: a. Friday evening 5 hour minimum - resident $650 $75C b. Weekend Rates 10 hour minimum - resident $1,300 $1,500 C. Extra hours - per hour - resident $130 $150 d. Friday 5 hour minimum - non-resident $750 $900 e. Weekend Rates 10 hour minimum -non-resident $1,500 $1,600 f. Extra hours -per hour - non-resident $150 $180 g. Kitchen Charge -per hour $100 $100 Is. Banquet Room - Mon - Fri -daytime-resident/hr3 hour min $85 $100 !. Banquet Roam -Mon - Fri -daytime -non-residentlhr 3 hour min $90 $120 j. Damage deposit $550 $550 It. Contract violation fee -per hour - resident $200 $300 I. Contract violation fee - per hour -non-resident $200 $360 m. Cancellation Fee - Less than 90 days $550 $550 11. Classroom and Gymnasium Rental - Renton Community Center: a. Resident single gym athletic - per hour $45 $so Is. Non-resident single gym athletic - per hour $50 $60 C. Resident double gym athletic - per hour $90 $100 it. Non-resident double gym athletic - per hour S1oo $120 e. Resident si ngle gym nonathletic $550 $1,000 f. Nan -reside nt single gym nor -athletic $675 $1,200 g. Resident double gym non -athletic $1,10C $2,000 In. Non-resident double gym non -athletic $1,35C $2,400 !. Carpet fee single gym - resident & non-resident $325 $325 j. Carpet fee double gym - resident&non-resident $650 $550 k. Classroom resident $35 $40 I. Classroom Non-resident $40 $48 12, Facility Rental - Neighborhood Center: a. Meeting room - resident $35 $41) It. Gymnasium - resident $35 540 C. Meeting room - non-resident $40 548 d. Gymnasium - non-resident $40 $48 13. Farmer's Market a. 10x 10 Lot $40 $40 Is. Half Lot $70 $20 c. Application fee $30 $30 d. Electrical fee $5 $5 14. Parklet Rentals a Parklet Rental including installation per Occurrence $500 'Revocable Right of Way Permit will be required if located within the City Right of Way. See Section XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection I of subsection 3, Public Works Fees Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Guide. 2. JetA Fuel Flow Charge: Der gallon Sc.10 Solo 4. Hangar wait list, one time fee 5. Tie -down wait list, one time fee 6. Lost gate card fee per occurrence 7. T-Hangar. Non -Refundable Move -in B. Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence) $500 _ $500 9. Penalty for Movement Area Incursions (each occurrencel, assessed to sponsorytenant 5500 $Soo 1. Altered Animal Annual License 2. Unaltered Animal Annual License 3. Economically Qualified Resident 'Please note, impounded animals are subject to license fees, microchipping casts, and other out-of-pocket costs as specified in RMC !SECTION X. BUSINESS LICENSES 1. General Business License: a. Registration Fee $150 $150 b. Appeal of Business License Decision $250 $250 2. Penalties: a. The penalty to reinstate an expired business license $50 SSo b. The penalty for Failureta obtain a business license $250 $250 C. Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for the first 5%-I5% 5%-15% month of the delinquency and an additional penalty of 15%j for each succeeding month of delinquency, but not exceeding a total denalty of 115%) of the amount of such license fee, a. Adult Entertainment Business License $750 $750 b. Entertainer $75 $75 C. Manager $75 $75 d. License Replacement $10 $lo City of Renton Fee Schedule 2021-2022 1. Building Fees: icantin ued) (1) Base Fee/Val uatior$ 1.00 to$500.00 $34 $37 III) Vaivation $501.D0 to $2,000.00 $34 + $3.83 x each $10C value $37 + $4-21 x each 5100 value (iii) Valuation $2Do1.00 to 25,000.00 $8g75+$17.59 x each $1,000 $97.63+$19.35 x each $1,000 value value (iv) Valuation $25,DOI 00 to $50,000 90 5493.26+$12 60 x each $542 59 +$13.86 is each $1,000 $1,000 value value IV) Valuation $50,001.0o to $100,000.00 $801- $8.77 x each $1,000 $889.09 ♦ $9.65 x each $1,000 value value (vi) Valuation $100,001.00 to $SW,O00.00 $1,225.76 +$7.04 x each $1,348.34 + $7.74 x each 51,000 value $1,000 value ivii) Valuation $500,001.O0 to$1,000,000,00 $4,039.76 + $5.93 reach $4,443.74+$6S2 teach $1,000 value $1,000 value (viii) Valuation $1,000,001.00 and up $7,O06, 01 r $457 x each $7,706,61 + $5.03 x each $1,000 value S1,ODO value b. Combination Building Permit Fees" (1) Plumbing up to 3,000 sq ft $256 $282 (ii) Plumbing over 3,000 sq ft $262 $310 (iii) Mechanical up m 3,000 sq ft $205 $226 (iv) Mechanicai over 3,000 sq ft $231 $254 (V) Electrical up to 3,000 sq ft $231 $254 (vi( Electrical over 3,000 so ft $282 $310 Combination Building Permit fees are required for each new single family residential structure C. Building Plan Check Fee' (i) Initial Building Plan Check Fee* 65% of permit fee 65% of permit fee pi) Additional Building Plan Check Fee 50% of initial plan Check Fee 50% of initial plan Check Fee • Building Plan Check Fee is in addition to the building permit fees, demolition permit fees, and combination building permit fees. The plan check fee is equal to 65% of the building permit fee, or the demolition permit fee, or the combination building permit fee. includes three (3) review cycles. d. State Building Code Fee', (i) Non-residential projects, $25 $25 (ii) Residential projects: $6.50 $6.50 { 1) Each additional unit after first unit $2 $2 e. Electrical Permit fees, (I) Residential Fees - Single -Family and Duplex (1) New Service -Single Family and Duplex' (a( up to 200 AMP S217 $239 (b) Over 200 AMP $231 $254 12) Service Changes/New Circuits -Single Family and Duplex: (a) Change up to 200 AMP $169 $186 (b) Charge over 200 AMP $179 S197 (c) Any new circuits added to above price is per each up to a maximum of$80.00 $21 $23 (d( Minimum fee for remodel/addition of new circuits without a service charge $169 $196 le) Cooling system circuit for new or replaced appliance $75 $83 (h) Multifamily, Commercial and Industrial Fees', (1) Value of work, $1.00 to $50C.00 $66 $73 5500.01 to $1,000.0C $49 + 3,5% of $53.90 + 3.5% of value value $1.000, Olt. 5,000.00 $86,10+3.05%of value $94.71+3,05%of Value $5,000,011. $50000.00 $245.70 + 1-9% of value $270,27+ 1,8% of value $50,00001 to $250,000.00 $1,18335+ 1.05%of value $1,301.69 + 105% of value $250,000.01 to $1,0001 53,919.60 + 0,85% of value $4,333,56 +0.85% of value $1,OOO,000.01 and up $12,75-360+0,47%of va lue $14,03556+0,47-Ao1i {iii) Temporary Electrical Services $169 $186 (iv) Miscellaneous Electrical Fees {1) Job Trailers $169 $1B6 (2) Signs per each $169 $186 (3) Mobile Homes S169 $136 (4) Low Voltage Work (e-g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable 50%of commercial fees 50% of commercial fees television, etc.) Minimum $169 Minimum $196 Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees f. House Moving' -minimum per hour Inspection Fee: $154 $169 "'This coven only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual house move permit. A building permit is also required In order to site the structure on the new site. g. inspection Fee For Condominium Conversions $154 on 1st unit 21 each 1$ $169 on 1st unit/ add'I unit $23 each add'I unit It. Manufactured/Mobile Home Installation Fees* Within a manufactured home park $154 $169 7 City of Renton Fee Schedule 2021-2022 FSECfION XIL DEVELOPMENT FEES (CpNT1NUE 1. Building Fees: (continued) (III Outside of a manufactured home park Braildirig Permit Fees Building Permit Fees • Includes plan review and inspection fees for the foundation {electrical, plumbing, mechanical, sewer and water connection fees are In addition to the below amounts). I. Mechanical Permit Fei (1) Residential - Mechanical Permit base fee plus itemized fees below. $53 $58 (1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.)- A/C system (air $21 $23 conditioner, chiller or Air Handling Unit (VAV) including ducts and vents) (2) Boiler or Compressor $21 $23 (3) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for $21 $23 which na other fee is listed in this code (4) Ventilation/exhaust fan $21 $23 (5) Fuel Gas Piping (each gas piping system up to 6 outlets) $21 $23 (ii) Commercial or Multi -Family -Mechanical Permit base fee plus itemized fees below: $77 $as (1) Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.). A/C system (air $36 $40 conditioner, chiller or Air Handling Unit (VAV) including ducts and vents) (2) Bailer or Compressor $77 $85 (3) Refrigeration System $77 $85 (4) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each $77 $85 (5) Incinerator: Installation or relocation of each $103 $113 (6) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for $36 $40 which no other fee Is listed in this code (7) Fuel Gas Piping {each gas piping system up to 6 outlets) $36 $40 j. Plumbing Permit Fees:i (i) Residential - Plumbing Permit base fee plus itemized fees below: $53 $58 (11 Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc ) or set of fixtures on one trap $10 $11 (2) Water Service: For meter to house $to $11 (3) Per fixture for repair or alteration of drainage or vent piping $10 $11 (4) Per dram for rainwater systems $10 $11 (5) Per lawn sprinkler system, includes backflow prevention $10 $11 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc $10 $11 (7) Per interceptor for industrial waste pretreatment $1C $11 (8) Fuel Gas Piping(each gas piping system up to 6 outlets) $21 $23 {ill Commercial or Multi-FamllyPlumbing Permit base fee plus itemized fees below. $77 $85 11) Per plumbing fixture (e g, sink, shower, toilet, dishwasher, tub, etc) or set of fixtures on one trap $15 $17 (2) water Service, For meter to bui ldi ng $Is $17 (31 Per fixture for repair or alteration of drainage or vent piping $15 $17 (4) Per drain for rainwater systems $15 $17 (5) Per lawn sprinkler system, includes backflow prevention $Is $17 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc $15 $17 17) Fer interceptor for ndustrial waste pretreatment $15 $17 l8) Fuel Gas Piping: (each gas piping system up to 6 outlets) $26 $29 (9) Medical Gas Piping: (each gas piping system up to 6 cutlets) $77 $85 k. Sign Permit Feesi (i) Permanent Signs. (1) Roof, projecting, awning, canopy, marquee, and wall signs $256 $292 (2) Freestanding ground and pole signs $256 $282 III) Temporary and Portable Signs: (1) Real Estate Directional Signs, pursuant to RMC 4-4-10012, perm@ valid for a 12-months period $77 $85 (2) Grand Opening Event Signs, pursuant to RMC 4-4-10CJ 6d(i) $77 $85 (3) Event Signs, pursuant to RMC 4-4-101 and (iii) per sign, per promotion $51 $56 (4) A -Frame Signs, pursuant to RMC 4-4-I0015 Charge Is for the first sign, all subsequent signs are $50.00 $126 $141 (5) Commercial Property Real Estate Banner each sign permit is valid for 12 months, $77 $as (6) Decorative Flags fee is per entrance and valid until flags) are removed $77 $85 I. Miscellaneous Fees: (i) Inspection Fees, (1) Minimum Housing Inspection $I23 $141 (2) WARO-Adult Family Home; Misc building inspection 512H $141 (3) Reinspection Fee; Misc building inspection $128 $141 III) Plan Review Fees-. (1) Electrical, Plumbing, or Mechanical Permits (percentage of permit feel 40% 40% (2) Additional Plan Review Fees: Over three review cycles (percentage of plan review fee) 50% 50% 131 Miscellaneous Plan Review. hourly fee, $128/hr $141/hr (iii) Work commencing before permit Issuance: Where work for which the permit is required is started prior to 2 X Permit Fee 2 X Permit Fee obtaining the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The special Investigation fee shall he paid in addition to the required permit fees, Per Res. 4422, fees for an Accessory Dwelling Unit (ADU) will be waived as of the adoption date of Res. 4422, through December 31, 2022. 2. Land Use Review Fees: a. General Land Use Review. (1) Additional Animals Permit $so $50 (ii) Address Change $105 SI05 (iii) Annexation . - I Lessthan to acres $5,250 $5.25C (2) 10 acres or more $5,250 $5,250 IN) Appeal of (1) Hearing Examiner's Decision $500 $500 12) Administrative Decision $500 $500 13) Environmental Decision $500 $500 (vl Binding Site Plan (total fee for both preliminary and final phases) $5,280 $5,280 (vi) Building Permit -Site Plan/Zoning Review and Inspection Fee 5% of Building Permit Fee (vii) Civil Construction Permit -Site Plan/Zoning Review and Inspection Fee° 0.5%of Construction Cost (viii) Code Text Amendment NIL N/C City of Renton Fee Schedule 2021-2022 SECTIONIMMVEWIPMENT FEES (CONTINUED) 2. Land Use Review Fees. (Continued) Iix) Comprehensive Plan Map or Text Amendment (each) $5,250 $5,250 Conditional Use Permit: (x) (1) HEX $3,300 $1,300 (2) Administrative $1,600 $1,600 )3) Revision (minor, administrative) 50% of Application Fee 5096 of Application Fee (4) Revision (major) Application Fee Application Fee (xi) Critical Areas Exemption N/C N/C (xii) Critical Areas Permit $1,250 $1, 250 )xri) Critical Areas Review Fee: for those projects that propose impacts to critical areas and will be billed at the cost of l00% of 100% of contract biologists review.' contract cost contract cost (xiv) Development Agreement $10,000 $10,ODO (xv) Environmental Impact Statement Cast include the coordination, review and appeal. Draft and Final' 100% of cost 100% of cost (xvl) Environmental Checklist Review $1,600 $1,600 (xvii) Environmental jSEPA) Addendum $1,600 $1,600 (xvill) Fence Permit (special) $160 $160 (xix) Grading and Filling Permit (Hearing Examiner) S5,410 $5,410 (xx) Landscape Review Fee $160 S16C (xxij Legal Lot Segregation N/C N/C (xxii) Lot Consolidation $510 $510 (xxiii) Lot Line Adjustment $1,090 $1,090 (xxiv) Manufactured/Mobile Home Park. (1) Tentative $1,090 $1,090 (2) Preliminary $3,250 $3,250 (3) Final $1,600 $1,600 (xiv) Open Space Classification Request S155 $153 (Kxvij Plats: (1) Preliminary Short Plat $5.410 $5,410 (2j Final Short Plat $2,705 $2,705 (3) Preliminary Plat $10,830 $10,830 (4) Final Plat $5,410 $5,410 (5) Minor Plat Amendment 50% of Application Fee 50% of Application Fee (6) Major Plat Amendment Application Fee Application Fee (xxvii) Planned Urban Development'. (1) PreliminaryPlan $5,410 $5,41D I2) Final Plan S2,700 $2,700 (xxviii) Reasonable Use Exception: (a) in conjunction with land use permit $510 $SID (b) Standalone $1,540 $1,540 (xxii} Public Arts Exemption N/C i (xxx) Rezone $5,250 S5,250 (KKKI) Routine Vegetation Management Permitwithout Critical Areas $105 $SOS (xxxll) Shoreline -Related Permits'. (1) Shoreline Permit Exemption N/C N/C j2) Substantial Deveiopment Permit $2,700 $2,700 (3) Ccnditional Use Permit 53,250 $3,25D (4) Variance $3,250 $3,250 (xxxiiij Site Development Plan (Site Plan or Master Plan which includes design review fee for projects subject to RMC 4-3-100): (1) Hearing Examiner Review $3,8C0 $3,800 (2) Administrative Review $2,700 52,700 (3) Modification {minor, administrative) (4) Modification (major) required new application and repaymentoffee required (xxxiv) Small Cell Permit, per site' (xxiv) Special Permit (Hearing Examiner) Ixxxvi) Street Naming (Honorary) Ill Application (2) Installation (xxxvii) Temporary Use Permits (1) Tier 1 (2) Tier 2 (xxxviii) Variance (per each variance requested) Administrative or Hearing Examiner (xxxix) Waiver or Modification of Code Requirements cost is per request (xxxx) Zoning Compliance Letter Miscellaneous Fees (i) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside of the hours of city staff regular work schedule) Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use Review Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk's office for public review. SC% of current site plan review fee Application Fees $510 $2,700 $25D $250 $105 $205 $1,330 $260 $480 $175/hr 50% of current site plan review fee Application Fees $510 $2,700 $250 5250 $1c5 $205 $1,330 $260 $480 175/hr 'Per RMC 4-3-1 the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other documents related to evaluation of impacts to or hazards from critical areas and subsequent code -required monitoring. 2When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicants) of the projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after inputted costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant's proposal. The City shall not collect a fee for performing its duties City of Renton Fee Schedule 2021-2022 as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter 42.17 RCW. 'Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application, including plan inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended. 'Construction costs as defined in the following Subsection g of Subsection 3, Public Works Fees; and Section XIII. ISECTION XIL DEVELOPMENT (CONTINUED) 3. Public Works Fees: Franchise Application Fee 55,000 $5,000 'The fixed application fee established herein is intended to cover the Citfrs internal administrative costs in processing and administering the franchise. In addition to the fixed application fee, the City may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement. The City may require applicants to deposit funds in advance to cover legal and/or other professional services fees as they are incurred. Franchise Permit Fees: " If a franchise agreement does not specify the fee amount, the generic fee, as identified in the following table, shall be collected: (iJ (11 Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $600 $Soo I All other work, permit fee plus $150 per hour of inspection applied during regular inspection hours, overtime $600 $600 inspection rates apply thereafter (3) Other public agencies constructing utilities within City right-of-way $600 $600 pi) Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits (1) Master Lease Agreement Administrative Costs, $100 per staff hour Actual cost Actual cost (2) Pale Reservation, per pole $120 $120 (3) Administrative Fee,$10C per staff hour and/or cost of materials - $760 deposit + $760 deposit+ time and materials time and materials (4) Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or operation of site equipment) (i) Electrical service (annual feel (a) Tier 1, Daily peak kWh <20 $715.38 $71538 lb) Tier 2, Daily peak kWh 21 - 40 $1,430.76 $1,430.76 (cl Tier 3, Daily peak kWh 41 -60 $2.146-14 $2,146.14 (d) Tier 4, Daily peak kWh 61-80 $2,961.51 $2,851.51 (e) Tier S, Daily peak kWh >81 $3,576.99 $3,576S9 All other reimbursement Actual cost Actual cost (5) Site License Addendum Rent $270.00 $270.00 (6) All other fees, $100 per staff hour and/or cost of materials' Actual cast actual cost (iii) Conduit Lease Rates per Lineal Foot (annual fee): (1) Tier 1, conduit in existing planter strips $10.00 510,00 (2) Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks $20.00 $20,00 (3) Tier 3, conduit within signalized intersection crossings, bridges and train tracks 530,00 53000 'Bond required pursuant to AMC 9-10-5 =The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. 'Standard after hour and overtime fees apply. Latecome rs' Agreeme nt Application Fees: (I) Processing fee'(Nonrefundable) (1) If amount covered by latecomers' Is $50,000 or less 51,000 51,000 (2) If amount covered by latecomers' is between $50,D00 and $200,000 $2,000 $2,000 (3) If amount covered by latecomers' is greater than $200,000 $4,000 $4.000 (ii) Latecomers' Agreement - Administration and collection fee (1) if amount covered by latecomers' is $50,000 or less 15%of total 15% of total (2) If amount covered by latecomers' is between $50,00C and $200,00C 10%of total 10% of total (3j if amount covered by latecomers' is greater than $200,000 5%of total 5% of total (III) Segregation processing fee, it applicable $750 $750 'The administration and collection fee is deducted from each individual latecomer fee payment and the balance forwarded to the holder of the latecomers agreement pursuant to RMC 9-5, Tender of Fee. System Development Charge Tables (il Water and Wastewater System Development Charges: (1) 5/8 x 3/4 inch and 1 inch: (a) Waterservicefee' $4,450 $4,500 lb) Fxeservicefee'" $594 $601 (cl Wastewaterfee' $3,450 $3,500 (2) 1-112 inch: (a) Water servicefee' $22,25C $22,500 I Fire service fee'" $2,971 $3,005 (c) Wastewaterfee' $17,250 $17,500 (3) 2 inch: (al Waterservicefee' $35,600 $36,000 lb) Fireservicefee''' $4,754 $4,807 (c) Wastewaterfee' $27,600 $29,000 (a) 3 inch, (a) Waterservicefee' $71,200 $72,000 (b) Fireservicefee''' $9,508 $9,615 (c) Wastewaterfee' $55,200 $56,000 I 4 inch: (a) Water service fee' $111,250 $112,500 (6) Fire service fee " $14,955 $15,023 (c) Wastewaterf-' $86,25C $87,5CO (6) 6inch: (a) Waterservicefee' $222,500 $225,000 (bi Fire service fee' ` $29,712 S30,046 (c) Wastewatcrfee' $172,500 $175,00O (7) a inch: (a) Waterservicefee' $356,000 $360,000 (b) Fire service fee' -' $47,539 $48,073 (c) Wastewater fee' $276,000 $280,000 ON City of Renton Fee Schedule 2022-2022 3. Public Works Fees: (continued} (ii) Storm Water System Development Charges: (1) New single family residence (including mobile/manufactured homes)' $2,000 $2,100 (2) Addition to existing single family residence greater than 500 square feet (including mobile/manufactured $0.800 per sq foot $0.940 per sq foot homes} Fee has to exceed $2,0W (2021) or $2,100 (2022) (3) All other uses charge per square foot of new impervious surface, but not less than $2,000 12021) or $2,100 $0-800 $0-840 (2022) per sq foot per sq foot ' Based upon the size of the fire service (NOT detector bypass meter( z unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not be charged. Per Res. 4422, utility system development charges Ihookup fees) for an Accessory Dwelling Unit (Al will be reduced by 50%as of the adoption date of Res. 4422, through December 31, 2022. Administrative Fees for SDC Segregation Request' $750 + administrative costs $750 +administrative casts 'The applicant shall pay the City's administrative costs for the preparation, processing and recording of the partial payment of the fee(s). If the same segregation is used for more than one utility's special assessment district, and/or latecomer's charge, then only one administrative fee is collected. Public Works Construction Permit Fees. (i) Water Construction Permit Fees: (1) Water meter tests for 3/4" to 2" meter' $50 $5C (a} Water meter tests on meters 2" or larger $60 deposit I time and $60 deposit+time and materials materials (b) Open and close fire hydrants for fire Flow tests conducted by others. Time and materlals Time and materials (c) Water service disconnection (cut at main) $275 $275 (d) Meter resets $95 $95 (e) Repair of damage to service $250 $250 If) Water main connections $560 $56C (g) Water main cut and cap $1,025 $1,025 (h} Water quality/inspection/purity tests $80 $so (i) Specialty water tests (lead, copper, etc) Cast oftest+$70 processing Cost of test + $70 processing fee fee {j} Water turn ons/offs after hours $185 5185 (k) Into Ilation of isolation valve. 52,000 deposit time and $2,000 deposit+ time and materials materials (1) New water line chlorination fee. Fee plus 50-15 per lineal foot for any footage after $25C + $0-15 5250+$0.15 the first two hundred fifty (250) lineal feet per lineal per lineal foot foot (m) Miscellaneous water installation fees. Time and materials Time and materials In) Service size reductions $50 $50 (o) Installation fees for ring and cover castings $200 $200 (2) Water meter installation fees— City installed' (a) 3/4" meter installed by City within City limits. Installation of stub service and meter setter only. $2,875 $2,975 (1) 3/4" meter drop in only $400 $40C (b) 3/4" meter installed by City outside City limits. Installation of stub service and meter setter only. $2,935 $2,935 (i) 3/4" meter drop in only $40C $400 (c) V meter installed by the City, Installation of stub service and meter setter only. $2,375 $2,875 {i) V meter drop in only $460 $46C (d) 1-1/2" meter installed by the City. Installation of stub service and meter setter only. 54,505 $4,605 (1) 1-1/2" meter drop in only $75c $750 (e) 2" meter installed by the City. Installation of stub service and meter setter only- 54,735 $4,735 (i) 2" meter drop in only $950 $950 (3) Water meter processing fees — Applicant installed: For meters larger than 2", the applicant must provide matenals $220 $220 and installs.' (4) Hydrant Meter fees:' (a) Hydrant meter permit fee $5C $50 (b} Deposits, (1) 3/4" meter and backflow prevention assembly $500 $500 (li) 3" meter and backflow prevention assembly. $2,000 $2,OD0 (III) Deposit processing charge, nonrefundable, $25 $25 (c) Meter rental (begins on day of pickup} (i) 3/4" meter and backflow prevention assembly, Per month. $Se $50 l 3" meter and backflow prevention assembly. Per month. 525C $250 (ii) Wastewater and Surface Water Construction Permit Fees' (I7 Residential, (a) Wastewater permit fee 5375 $375 (b) Surface water permit fee $375 $375 (2) Commercial_ (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 {3) IndustrW (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (4) Repair of any of the above (a) Wastewater permit fee 5375 $375 (b) Surface water permit fee $375 $375 (5) Cut and cap/Demolition permit: (a) Wastewater permit fee $375 $375 (b} Surface water permit fee $375 $375 (5) Reinspection for Wastewater or Surface Water Permits $375 $375 (7) Groundwater discharge (temporary connection to wastewater system for discharge of contaminated ground $375 S375 water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged plus King County plus King County amount (meter provided by property owner) sewer rate sewer rate on discharged on discharged amount amount 11 City of Renton Fee Schedule 2021.2022 [SECTION XII. DEVELOPMENT FEES (COIMNUEO) 3 Public Works Fees icontinued) Right-of-way Permit Fees'. Work in rightof-way—construction permit: Utility and street/sidewalk improvements, excluding utilities from other public agencies which shall be considered under a franchise permit. A bond is required, as stipulated in RMC 9-10-5, Street Excavation Bond, (1) Single family residence $325 $325 (2) All other uses, excludingthose listed $625 $625 (3) Wastewater or storm water service $375 $375 (4) King County ROW Permitslinspections: (a) Service Installation Only $1,025 $1,025 (b) Utility Extension per 100' of Length (Min 200' Length j $1,025 $1p25 (5) Exception: No permit fee shall be charged for individual homeowners for work in street rightsof-way for street tree or parking strip irrigation systems or work associated with City of Renton capital improvement projects or City funded projects. No permit fee shall be charged for moving pods or moving trucks in the right -of -wary provided that they are in the right,of-way for no more than three (3) days. No permit fee shall he charged for use ofthe right-of-way in the CD zone, provided ground disturbing activity is not proposed. Street light system fee, per new connection to power system $525 $525 Utility Locate Refresh Fee (Fee is due each time excavator calls In for locate refresh during 45day locate ticket) (1) Standard locate $500 $500 (7) Large prolect locate $1000 $1,000 'Per Res. 4422. fees for an Accessory Dwelling Unit (ADU) will be waived as of the adoption date of Res. 4422, through December 31, 2022, [Per Res. 4422, water meter installation fees for an Accessory Dwelling Unit (ADU) will be reduced by 50% as of the adoption date of Res. 442Z through December 31, 2022. Civil construction permit plan review and inspection fees": All developers, municipal or quasi -municipal entities, or utility corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include City -franchised cable Tv, cable modem, natural gas, telecommunications, and electrical power. The fee will be based upon percentages of the estimated cost of improvements using the following formula, (j) Street and utility plan review and inspection fees; estimated construction cost: The applicant must submit separate, itemized cost estimates for each item of improvement subject to the approval by the Public Works Plan Review Section. (1) $150,000.00 or less 6%of cost 6%of cost (2) trver$150,000.00 but less than$300,000.00_ $9,000+5%over $150,000 $9,000+5%over $150,000 (3) $300,000,00andover. $15,500+4%over5300,000 $26,500 ♦4%over $300,000 (III Standard or minor drainage adjustment review $550 $55C (iii) Wet weather (annual fee) $3.000 'Includes three (3) review cycles, Additional reviews will be charged $1,500 each. 'Construction cost shall be based on the Cfty's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public water main improvements; required off -site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements; and site grading and mobilization costs. 'if deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related costs and expenses payable by the applicant. Grade and Fill License Fees. Fees shall be based on the highest her triggered. Grade and Fill Quantity Cleared or Disturbed Area New or Replaced Hard Surface Tier < 50 cy < 7000 sf < 2,000 sf 0 50 cy - 499 cy 7,000 st - < 3/4 acre 2,000 sf - 4,999 sf 1 500 cy-4,999 cy 314 ac-<1 ac 5,000 sf-<1 ac 2 5000 cy-49.999 cy lac -<25 ac lac-<2.5 ac 3 50,000 cy-99,999 cy 25 ac-<5 ac 2,5ac-15ac 4 100,000 cy and larger 5 ac and larger 5 ac and larger 5 (i) Review/Intake Fee: (11 Tier 0 (not permit required) N/A N/A 121 Tier 1 $466 $465 (3) Tier 2 $621 $621 (4) Tier 3 $932 $932 (5) Tier $1,242 $1,242 (6) Tier $1.553 $1,553 Inspection/Issuance Fee: (1) Tier (no permit required) N/A N/A (2} Tier 1 $444 $444 (3) Tier $887 $887 (4) Tier $1,183 $1,183 (5) Tier $2,366 $2,366 (6) Tier $3,550 $3,550 (III) Solid Waste Fills: 1.5 x plan 1.5 x plan The plan check fee for solid waste fills shall be one and one-half (1. 112) times the plan checking fees listed above. check fee check fee The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project. (iv) Annual Licenses of Solid Waste Fills: 15 x plan 1.5 x plan The fee for annual licenses for solid waste fills shalt be one and one-half (1-1/2) times the plan checking fees listed check fee check fee above_ The fee for a grading license authorizing additional work to that under a valid license shall be the difference between the fee paid for the original license and the fee shown for the entire project. Any unused fee may be carried Forward to the next year. If any work is done before the license is issued, the grading license fee shall be doubled. i. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9-1 RMC, Easements. (i) Filing fee $250 $250 (il) Processing fee $250 $250 City of Renton Fee Schedule 2021.2022 SECTFQN 7(I1. DEVELOPMENT FEES (CONTiNVED) 3 Public Works Fees: (contini j, Revocable Rig�t�pf-way Permit Fees 01 Single family and two family uses', fee assessed annually plus leasehold excise tax' if applicable $30,00- LET' 510,00 + LET' All uses without public benefit fee is a per month charge assessed annually based on property value of land to be 0-5%x Value' + LEf' 0.5%x Value' + LET' utilized, plus leasehold excise tax', if applicable. Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold excise tax', 0,5%x Va{ue'+LET' 0.5% x Value+ LET' if applicable. In no case less than $10,00, [iv) Insurance Required: Public Liability and property damage insurance is also required pursuant to RMC 9-2-58, Minimum Permit Requirements for Excess Right -of -Way Use. (v) Exception for Public Agencies: a no -fee permit may be issued only when the applicant is a public agency and when the proposed use of the right-of- way provides a direct smite to the public (e,g., Metro applications for right-of-way far bus shelters), 'There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a leasehold interest at the rate established by the State of Washington 'Right-of-way value shall be based an the assessed value of the land adjoining the property as established by the King County Assessor 'Except those single family and two family uses that utilize right of way along the waterfront. They shall be considered uses without public benefit. k. Street and Alley vacation FeesThe imposition, collection, payment and ether specifics concerning this charge are detailed in cha pter 9-14 RMC, vacations. (i) Filing fee $500 $Soo (ii) Processing and completion fee, payable upon Council approval of the vacation and upon administrative determination of appraised value of vacated right-of-way. Appraised Value of Vacated rightof-vray: (1) Less than $25,000 $750 $750 M 525,00Oto$75,000 S1,250 $1,250 (3) Over$75,000 $2,000 $2,000 I. Temporary connections to a City utility system maybe granted for a one-time, temporary, short-term use of a portion of the property for a period nat to exceed three (3) consecutive years: Storm Water Pee, Fee equal to thirty percent (30%) of the current system development charge applicable to that 3C% of system development 30% of system development (I) portion of the propertl charge charge Ili) Wastewater Fee; Annual fee equal to thirty percent (30%) of the current system development charge applicable to 3046 of system development 30% of system development the size of the temporary domestic water meter(s).' charge charge (iii) Water Fee; Annual fee equal to thirty percent 131 of the current system development charge applicable to the size 30% of system development 30% of system development of the temporary water meteris).' charge charge 'Fee shall be paid annually {non -prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and a boundary line of the proposed development service area for use in the fee determination. m. Water or Sewer - Redevelopment: Credit for existing water or sewer service: Any parcel that currently has water and or sewer service is eligible for a prorated system development charge. (1) Feels) based upon meters) proposed for Final project minus feels) based upon meter existing on site. n. Building Permit -Engineering Review 5% of Building Permit Fee o. Miscellaneous Fees'. W Re -inspection Fee $129 $128 iii) Plan Revision following Permit Issuance. (1) Minor (Results in a change 10%or less than the cost of construction based on the City's bond quantity $250 $250 worksheet Excludes minor adjustments that are approved by the City to be shown on record drawings.) (2) Major [Results in a change of greater than 10%of the cost of construction based on the City's bond quantity $1,500 $1,500 worksheet.} (iii) Street Frontage Improvements Fee-Inl (1) Street with existing storm drainage main line $113/LF $113JLF (2) Street with existing conveyance ditch $128/1 $1211 (3) Exception: No fee-inrieu shall be charged to accessory dwelling units IN) After hours inspection (applies to inspections performed on Saturdays. Sundays, observed City of Renton holidays, $12S/hr $175/hr and non -holiday Monday -Fridays outside the hours of TCOam to 3:301 (v) Permit review staff overtime (applies only if permit review is requested by the applicant to he performed on $1751hr $175/hr Saturdays, Sundays, observed City of Renton holidays, and non -holiday Monday -Fridays outside of the hours of city staff regular work sched ule) (vi) Public Well Reimbursement (any work performed by City forces or under City contract on behalf of a permit Actual cost Actual cost applicant to repair damage to the City infrastructure caused by the permit applicant or contractor under its control, or any and al I roadway or right-of-way cleanup efforts performed by City forces or under City contract that resulted from the work performed by the permit auobcant or contractors under its control, 4. Technology Surcharge Fee An additional technology surcharge shall be required fcr all fees included in the following Subsections of Section All, Development 5.0% 5.0% Fees, of the City of Renton Fee Schedule Brochure, Subsection 1, Building Fees; Subsection 2, Land Use Review Fees, except for appeals, critical areas review fee, and direct EIS casts; Subsections b, e, f, g, h and n of subsection 3, Public Works Fees, and Section XIII Fire Department Fire Marshall Fees 5. Impact Fees: a. School Impact Fees: (i) Issaquah School District (1) Single Family Fee $18,213 520,291 (Z) Multi Family, Duplex, & Accessory Dwelling Fee [ADU) $12,043 $8,353 (iij Kert School District 11) Single Family Fee $5,692, 85 $5,818.09 (2) Multi Family,Duplex,&Accessory Dwelling Fee[ADU) 52,404-63 $2,457.53 {iii) Renton School District' (1) Single Family Fee $7,681 $2,659 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $4,939 $4,737 (lv) School Impact Fee Administration 5%x School Impact Fee 5%x School Impact Fee City of Renton Fee Schedule 2021-2022 SECTION XII. DEVELOPMENT FEES (CONTINUED) 5 Impact Fees: lcontjnuecl� b. Transportation impact Fees:' (1) Light Industrial, per sq foot $9.50 $9.50 (ill Apartment, per dwelling & Accessory Dwelling Unit (ADU) $6,717.10 $6,717.10 pi) Church, per sq foot $5.36 $5.36 (iv) Coffee/Donut Shop, no drive up, per sq foot $221.09 $221.09 M Coffee/Donut Shop, with drive up, per sq foot $232.24 $232.24 (A) Condominium & Duplexes per dwelling $5,645.22 $5,645,22 (vii) Convenience market - 24 hour, per sq foot $221.91 $221,81 (viii) Daycare, per sq foot $48.89 $48.86 (ii Drinking Place, per sq foot $61.53 $61.53 Ix) Drive-in bank, per sq foot $139,77 $13977 (xi) Fast food, no drive -up, per sq foot $141.85 $141,85 (xii) Fast food, with drive -up, per sq foot $180-72 $180,72 (xiiij Gas station with convenience store, per pump $65,313.08 565,313.08 (xivJ Gas station, per pump $87,322.31) $S7,322.30 (xv) General office, per sq foot $1458 $1458 (xvi) Health/fitness club, per sq foot $36.02 $36. 02 (xviij Hospital, per sq foot $7,79 $7,79 (xviii) Hotel, per mom $4,287.51 $4,287.51 (xixJ Manufacturing, per sq foot $7.15 $7.15 Ixx) Marina, per boat berth $2,286.67 $2,286.67 (rind) Medical office, per sq foot 532.94 $32.94 (xxil Mini -warehouse, per sq foot $2.57 $2.57 (xxiii) Mobile home, per dwelling $6,431.27 $6,431-27 (xxiv) Motel, per room 53,930.22 $3,930.22 (xxv) Movie theater, per seat $64313 $643, 13 (Y vi) Nursing home, per bed $1,786.46 $1,786,46 (xxvii) Restaurant: sit-down, per sq foot $6C.95 $6C.95 (xxviil} Senior housing -detached, per dwelling $2,929.90 $2,929,80 (xxix) Shopping center, per sq foot $26,58 $26.59 (xxx) Single family house, per dwelling $1C,861.69 $I0.861.69 (xxxi) Supermarket, per sq foot $65-81 565,91 (xxxii) Net New PM Peak Hour Person Vehicle Trip (Proposed - Existing), per PM Peak Hour Person Vehicle Trip $7,145.85 $7,145,85 c. Park impact Fees' (i) Single family $2,914.99 $2,914.99 (ill Multi -family: 2 units, Duplexes, & Accessory Swelling Unit (ADU) 52,366.28 $2,366.28 (ill) Multi -family, 3 or 4 units $2,251, 97 $2,251.97 (rv) Multi -family: 5 or more units $1,977.62 S1,977.62 (vJ Mobile home $2,069 07 $2,069.D7 d. Fire Impact Fees' (1) Residential - single family (detached dwellings & duplexes), per dwelling unit $82977 $929,77 (it) Residential - multi family & Accessory Dwelling Unit (ADU), per dwelling unit $96-4.33 $964,53 (iii) Hotel/motel/resort, per sq foot $1.29 $1,29 (iv) Medical care hook $3-92 $3-92 (v) Office, per sq foot $0.26 $0.26 {vi) Medical/dental office, per sq foot $1,99 $199 (vii) Retail, per sq foot $1,25 $1,25 (viii) Leisure facilities, per sq foot $236 $236 (ix] Restaurant/lounge, per sq foot 55.92 55.92 Ix] Industrial/manufacturing, per sq foot $0.15 $0.15 Ixil Church, per sq foot $056 5056 {xii) Education, per sq foot $0.72 $0.72 (xiii) Special public facilities, per sq foot $4.48 54.48 '(i)-(ii) is per unit 'Qii)-(xiii] is per square foot e. Independent Fee Calculation Review for unless otherwise established by Scheol District or Renton Regional Fire Authority. $500 $500 f. Impact Fee Deferral Administration: 00 Each Lot, Single Family Dwelling, or Condominium $s5 $85 iii) Each Multi -family Building $85 S85 ' Per Res. 4422, fees for an Accessory Dwelling Unit JAi will be waived as of the adoption date of Res. 4422, through December 31, 2022. 6- Miscellaneous Fees A. Multifamily Tax Exemption Application $1,000,00 $1,000.00 b. Tree Fee in lieu (peF d _Weiler Ash me at _ _ gra a $225 Q $-2-2s,aa Ill Per diameter inch measured at 45 feet above grade $225.00 $250.00 (1i) Labor cost for each 2"call per (or Eft tall) tree to he planted $500.Co :SECTION Mill. FIRE DEPARMENT FIRE MARSHAL FEES (11i a. Fire plan review and inspection fees: (i) %to $249.99 S35 $35 (ill $250_00 to$999.99 $35+2% $35+2% of the cost of the cost (iii) $1,000, 00 to$4,999. 99 $60+2% $60+2% of the cost of the cost (iv) $5,000,00 to $49,999.99 $175+ 1,5% $175+ 1.5% of the cost of the cost M $50,000.00 to $99,999,99 $400 + 1.2% $40C + 1.2% of the cost of the cost Ivi) $100,D00.00 and above $900+.75% $900+_7544 of the cost of the cost jvii) Construction Re -inspection- Fee is per hour with a 2 hour ml mmum, The minimum may be assessed it the requested $125 $125 inspection does not meet the approval of the inspector. (viii) Violation/Second Re -Inspection after 30-day period (whenever 30 days or more have passed since Fire Department $150 $15C notification of a violation, which required a first re -inspection, and such violation has not been remedied or granted an extension) 14 City of Renton Fee Schedule 2021-2022 SECrION (ix} Third Re-Inspection/Pre-Citation Follow -Up Inspection when re inspections are required beyond the first and second $250 $250 re -inspections (x} Preventable Fire alarm fee: (1) First, second, and third preventable alarms N(C NIC (2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm- $75 $75 (3) Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm, $150 $150 (xi) late Payment Penalty $35 $35 I Fire Permit type (0 Operational fire code permit {issued in accordance with Section 105-6 of the IFC) fee is yearly (includes items such as fire special events, covered stages, mobile food facilities, hot works, etc.( (ii) Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that has reciprocity with Renton RFA (iii) Hazardous materials and HPM facilities yearly (iv} Construction permit: (v} Replacement for lest permit, per each (yd Hazardous production materials permit (far businesses storing, handling, or using hazardous production materials as regulated in the fire code) permit is yearly (vii) Underground tank removal permit (commie iaq (viii) Underground tank removal or abandonment -in- place permit (residential) {ix) Other requested inspection when not required by the fire code, Fee is per hour with a minimum 1 hr when approved by the Fire Marshal, such as home daycares (x) Ni check fees (xi) RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and subsection b. (iii) $100 $325 $50 $75 $175 5200 20%of plan review fee - Min, 209Aof plan review fee - Mln. $52 $52 $35 - $175 $200 See Fire plan review and See Fire plan review and construction permit fees construction permit fees $84 $109 $125 $125 $25 $25 3% 3% I