Loading...
HomeMy WebLinkAboutApproved Committee ReportsTRANSPORTATION/AVIATION COMMITTEE COMMITTEE REPORT July 18, 2022 APPROVED BY CITY COUNCIL Construction Management Agreement with Perteet, Inc. for the Rainier Avenue S Corridor Improvements — Phase 4 Project (Referred on July 11, 2022) The Transportation/Aviation Committee recommends concurrence in the staff recommendation to approve the professional services agreement with Perteet, Inc. to provide construction management services totaling $3,442,794.80 for the Rainier Avenue S Corridor Improvements — Phase 4 Project. ke Kim-Khanh Van, Chair cc: Jim Seitz, Transportation Systems Director Bob Hanson, Transportation Design Manager Keith Woolley, Civil Engineer III Kelsey Marshall, Administrative Secretary I Joey Hamden, Engineering Specialist II 1055 South Grady Way, Rentonr WA 98057 • rentonwa.gov TRANSPORTATION/AVIATION COMMITTEE COMMITTEE REPORT July 18, 2022 Temporary Total Closure of Bronson Way South (Referred on July 11, 2022) APPROVED BY CITY COUNCIL Date - zazz The Transportation/Aviation Committee recommends concurrence in the staff recommendation to adopt the resolution to authorize the temporary total closure of Bronson Way South between North Riverside Drive and Mill Avenue South for up to forty-two (42) calendar days, between July 25 and December 31, 2022, to construct the Bronson Way Bridge — Seismic Retrofit and Painting Project. r fAt t_; Kim-Khanh Van, Chair Prince, Vice -Chair men Rivera, M tuber cc: Jim Seitz, Transportation Systems Director Kelsey Marshall, Transportation Administrative Secretary I Derek Akesson, Transportation Project Manager I OSS South Grady Way, Renton, WA 98057 • rentonwa.gov