Loading...
HomeMy WebLinkAbout04 Appendix D - CPNWW Drawings APPENDIX D: DESIGN DRAWINGS DESCRIPTIONSYMBOL SYMBOL LIGHTING DESCRIPTION REFERENCE SYMBOLS DESCRIPTION DIAGRAMS SYMBOL WIRING DIAGRAMS SYMBOL / DESCRIPTION 1.GENERAL: WORK SHALL BE DONE IN ACCORDANCE WITH CODES AS ADOPTED BY THE CITY OF RENTON, KING COUNTY, AND THE STATE OF WASHINGTON. 2.CITY OF RENTON (COR) STANDARDS APPLY TO, AND ARE MADE PART OF, THIS SCOPE OF WORK. 3.LOCATIONS OF ELECTRICAL EQUIPMENT, DEVICES, LIGHTING FIXTURES, ETC., INDICATED ON CIVIL / STRUCTURAL AND LANDSCAPE PLANS - INCLUDING SECTIONS, ELEVATIONS, NOTES, OR OTHER INDICATORS - TAKE PRECEDENCE OVER LOCATIONS SHOWN ON ELECTRICAL DRAWINGS. 4.REFER TO CIVIL, STRUCTURAL, LANDSCAPE, ETC., DRAWINGS FOR WORK IN OTHER DIVISIONS. INFORMATION CONVEYED WITHIN THE ELECTRICAL DRAWINGS ILLUSTRATING OR REFERENCING WORK OF OTHER DIVISIONS IS FOR REFERENCE ONLY. SPECIFICATION BY THE RELEVANT DIVISIONS SHALL APPLY. 5.GENERAL NOTES ARE SHOWN ON SHEETS MOST RELEVANT TO SPECIFIC NOTE; HOWEVER, GENERAL NOTES ON EACH SHEET SHALL APPLY IN PRACTICE TO ALL ELECTRICAL DRAWINGS. 6.NOT ALL COMPONENTS OF THE ELECTRICAL SYSTEMS ARE SHOWN (FOR SIMPLICITY). PROVIDE MATERIALS AND LABOR NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM. 7.STAINLESS STEEL HARDWARE: MATERIALS USED FOR THE MOUNTING AND SUPPORT OF BOXES CABLES, RACEWAYS, LIGHT FIXTURES, OUTLETS, AND OTHER ELECTRICAL EQUIPMENT, SHALL BE 316 STAINLESS STEEL. THIS REQUIREMENT APPLIES TO THE AFOREMENTIONED COMPONENTS WHEN INSTALLED OUTSIDE ABOVE GRADE. 8.LOCATIONS OF ELECTRICAL SYSTEMS COMPONENTS, INCLUDING BUT NOT LIMITED TO, LUMINAIRES, DISTRIBUTION EQUIPMENT, CONDUIT, JUNCTION BOXES, VAULTS, ETC., MAY BE REVISED PRIOR TO CONSTRUCTION. CHANGES MADE BY THE OWNER IN LOCATING ELECTRICAL COMPONENTS OF UP TO THIRTY FEET HORIZONTALLY (AND/OR VERTICALLY) IS A PART OF THIS CONTRACT. CHANGES IN LOCATION MAY BE IMPLEMENTED, AT NO CHARGE TO THE OWNER, WHEN MADE PRIOR TO ROUGH-IN OF EQUIPMENT BEING RELOCATED. 9.COORDINATE LOCATIONS OF ELECTRICAL AND COMMUNICATION CHASES AND CONDUITS WITH OTHER TRADES. ADJUST LOCATIONS AS NECESSARY TO AVOID CONFLICTS. 10.CONDUCTORS SHALL BE LABELED IN JUNCTION BOXES AND AT TERMINATIONS. 10.SCOPE OF WORK: THE SCOPE OF WORK FOR THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING: A.PERMITS: GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL GOVERNMENT TAXES, FEES AND OTHER COSTS IN CONNECTION WITH THIS WORK. OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION OF THE WORK AND DELIVER SAME TO THE ENGINEER AT THE TIME OF SUBSTANTIAL COMPLETION AND BEFORE REQUEST FOR FINAL PAYMENT. B.POWER OUTAGES: POWER OUTAGES SHALL BE LIMITED TO THE HOURS OF 6:00PM TO 7:00AM WEEKDAYS. OUTAGES SHALL BE REQUESTED IN WRITING TO THE OWNER 7-DAYS PRIOR TO THE DESIRED DATE AND TIME. NO OUTAGE SHALL OCCUR WITHOUT THE PRIOR APPROVAL OF THE OWNERS REPRESENTATIVE. OUTAGES SHALL NOT EXCEED (8) CONSECUTIVE HOURS. C.TEMPORARY POWER: PROVIDE TEMPORARY POWER AS NEEDED BY ALL TRADES DURING THE EXECUTION OF THIS CONTRACT. *NOT ALL SYMBOLS LISTED ARE USED. SYMBOL LIGHTING - EXISTING DESCRIPTION SITE ELECTRICAL SYMBOL DESCRIPTION SITE ELECTRICAL EQUIPMENT - EXISTING SYMBOL DESCRIPTION PROJECT NOTES ELECTRICAL LEGEND* ABBREVIATIONS SYMBOLS & ABBREVIATIONS E0.00 E N G I N E E R S ,I N 1736 Fourth Avenue S., Suite A Seattle, Washington 98134 P: 206.624.1387 www.pndengineers.comC. 100% REVIEW SUBMITTAL GENE COULON MEMORIAL PARK NORTH WATER WALK IMPROVEMENTS 04/26/2022 APRIL 2022 ISSUED FOR BID LIGHTING FIXTURE SCHEDULE E0.01 E N G I N E E R S ,I N 1736 Fourth Avenue S., Suite A Seattle, Washington 98134 P: 206.624.1387 www.pndengineers.comC. 100% REVIEW SUBMITTAL GENE COULON MEMORIAL PARK NORTH WATER WALK IMPROVEMENTS P2 - PILOT HOUSE RECEPTACLE P3 - TYPE 'FL' LUMINAIRE P4 - TYPE 'S12' BASE P5 - TYPE 'S12' LUMINAIREP1 - PIER DECK LIGHT1 2 3 4 5 P6 - TYPE 'FL' LUMINAIRE6 04/26/2022 APRIL 2022 ISSUED FOR BID COPPER FEEDER SCHEDULE FEEDER SCHEDULE NOTES: kW G 200/2 PSE PAD MTD. UTILITY CO. XFMR 200/2 G 60/2 G SERVICE PANEL 'M-3' 800A - 120/208V, 3P, 4W G G G EXISTING CIRCUITS EXISTING CIRCUITS G 200/2 20/1 G 20/1 G PANEL 'A' 200A - 120/208V, 1P, 3W G G EXISTING CIRCUITS G 60/2 20/1 G 20/1 G PANEL 'PL' 60A - 120/208V, 1P, 3W G G G EXISTING CIRCUITS EXISTING CIRCUITS 9 11 20/1 24 26 28 TO TYPE 'NL' NAVIGATION LIGHTS TO PILOT HOUSE & LIGHT 'S12' RECEPTACLE TO TYPE 'FL' PILOT HOUSE LIGHTS TO TYPE 'S0' & 'S0A' DECK LIGHTS TO TYPE 'S12' LIGHTS EXISTING CIRCUITS kW G 250/2 PSE PAD MTD. UTILITY CO. XFMR 50/2 GG SERVICE PANEL 'X' 250A - 120/208V, 1P, 3W G G G EXISTING CIRCUITS EXISTING CIRCUITS TO PILOT HOUSE CLAM LIGHT OUTLET 50/2 (E) IVAR'S BUILDING CLAM LIGHT OUTLET 40,42 40,42 ENCLOSED (GFCI) CIRCUIT BREAKER; WALL MOUNTED SINGLE LINE WIRING DIAGRAM E1.00 E N G I N E E R S ,I N 1736 Fourth Avenue S., Suite A Seattle, Washington 98134 P: 206.624.1387 www.pndengineers.comC. 100% REVIEW SUBMITTAL GENE COULON MEMORIAL PARK NORTH WATER WALK IMPROVEMENTS SINGLE LINE WIRING DIAGRAM (PARTIAL)SINGLE LINE WIRING DIAGRAM (PARTIAL) PAVILLION BUILDING IVARS BUILDING PHOTO - EXT. NW CORNER IVARS BUILDING 1 2 3 04/26/2022 APRIL 2022 ISSUED FOR BID ELECTRICAL SITE PLAN (WEST) E2.00 E N G I N E E R S ,I N 1736 Fourth Avenue S., Suite A Seattle, Washington 98134 P: 206.624.1387 www.pndengineers.comC. 100% REVIEW SUBMITTAL GENE COULON MEMORIAL PARK NORTH WATER WALK IMPROVEMENTS ELECTRICAL SITE PLAN (WEST)1 04/26/2022 APRIL 2022 ISSUED FOR BID ELECTRICAL SITE PLAN (EAST) E2.01 E N G I N E E R S ,I N 1736 Fourth Avenue S., Suite A Seattle, Washington 98134 P: 206.624.1387 www.pndengineers.comC. 100% REVIEW SUBMITTAL GENE COULON MEMORIAL PARK NORTH WATER WALK IMPROVEMENTS ELECTRICAL SITE PLAN (EAST) ENLARGED PILOT HOUSE PLAN PHOTO - EAST PAV. BLDG TO WEST PHOTO - WEST PAV. BLDG TO EAST 1 PHOTO - PILOT HOUSE HANDRAIL 04/26/2022 APRIL 2022 ISSUED FOR BID