HomeMy WebLinkAbout04 Appendix D - CPNWW Drawings
APPENDIX D: DESIGN DRAWINGS
DESCRIPTIONSYMBOL SYMBOL
LIGHTING
DESCRIPTION
REFERENCE SYMBOLS
DESCRIPTION
DIAGRAMS
SYMBOL
WIRING DIAGRAMS
SYMBOL / DESCRIPTION
1.GENERAL: WORK SHALL BE DONE IN ACCORDANCE WITH CODES
AS ADOPTED BY THE CITY OF RENTON, KING COUNTY, AND THE
STATE OF WASHINGTON.
2.CITY OF RENTON (COR) STANDARDS APPLY TO, AND ARE MADE
PART OF, THIS SCOPE OF WORK.
3.LOCATIONS OF ELECTRICAL EQUIPMENT, DEVICES, LIGHTING
FIXTURES, ETC., INDICATED ON CIVIL / STRUCTURAL AND
LANDSCAPE PLANS - INCLUDING SECTIONS, ELEVATIONS, NOTES,
OR OTHER INDICATORS - TAKE PRECEDENCE OVER LOCATIONS
SHOWN ON ELECTRICAL DRAWINGS.
4.REFER TO CIVIL, STRUCTURAL, LANDSCAPE, ETC., DRAWINGS FOR
WORK IN OTHER DIVISIONS. INFORMATION CONVEYED WITHIN
THE ELECTRICAL DRAWINGS ILLUSTRATING OR REFERENCING
WORK OF OTHER DIVISIONS IS FOR REFERENCE ONLY.
SPECIFICATION BY THE RELEVANT DIVISIONS SHALL APPLY.
5.GENERAL NOTES ARE SHOWN ON SHEETS MOST RELEVANT TO
SPECIFIC NOTE; HOWEVER, GENERAL NOTES ON EACH SHEET
SHALL APPLY IN PRACTICE TO ALL ELECTRICAL DRAWINGS.
6.NOT ALL COMPONENTS OF THE ELECTRICAL SYSTEMS ARE
SHOWN (FOR SIMPLICITY). PROVIDE MATERIALS AND LABOR
NECESSARY FOR A COMPLETE AND OPERATIONAL SYSTEM.
7.STAINLESS STEEL HARDWARE: MATERIALS USED FOR THE
MOUNTING AND SUPPORT OF BOXES CABLES, RACEWAYS, LIGHT
FIXTURES, OUTLETS, AND OTHER ELECTRICAL EQUIPMENT, SHALL
BE 316 STAINLESS STEEL. THIS REQUIREMENT APPLIES TO THE
AFOREMENTIONED COMPONENTS WHEN INSTALLED OUTSIDE
ABOVE GRADE.
8.LOCATIONS OF ELECTRICAL SYSTEMS COMPONENTS, INCLUDING
BUT NOT LIMITED TO, LUMINAIRES, DISTRIBUTION EQUIPMENT,
CONDUIT, JUNCTION BOXES, VAULTS, ETC., MAY BE REVISED
PRIOR TO CONSTRUCTION. CHANGES MADE BY THE OWNER IN
LOCATING ELECTRICAL COMPONENTS OF UP TO THIRTY FEET
HORIZONTALLY (AND/OR VERTICALLY) IS A PART OF THIS
CONTRACT. CHANGES IN LOCATION MAY BE IMPLEMENTED, AT
NO CHARGE TO THE OWNER, WHEN MADE PRIOR TO ROUGH-IN OF
EQUIPMENT BEING RELOCATED.
9.COORDINATE LOCATIONS OF ELECTRICAL AND COMMUNICATION
CHASES AND CONDUITS WITH OTHER TRADES. ADJUST
LOCATIONS AS NECESSARY TO AVOID CONFLICTS.
10.CONDUCTORS SHALL BE LABELED IN JUNCTION BOXES AND AT
TERMINATIONS.
10.SCOPE OF WORK: THE SCOPE OF WORK FOR THIS PROJECT
INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING:
A.PERMITS: GIVE ALL NECESSARY NOTICES, OBTAIN ALL
PERMITS AND PAY ALL GOVERNMENT TAXES, FEES AND
OTHER COSTS IN CONNECTION WITH THIS WORK. OBTAIN
ALL REQUIRED CERTIFICATES OF INSPECTION OF THE
WORK AND DELIVER SAME TO THE ENGINEER AT THE TIME
OF SUBSTANTIAL COMPLETION AND BEFORE REQUEST FOR
FINAL PAYMENT.
B.POWER OUTAGES: POWER OUTAGES SHALL BE LIMITED TO
THE HOURS OF 6:00PM TO 7:00AM WEEKDAYS. OUTAGES
SHALL BE REQUESTED IN WRITING TO THE OWNER 7-DAYS
PRIOR TO THE DESIRED DATE AND TIME. NO OUTAGE SHALL
OCCUR WITHOUT THE PRIOR APPROVAL OF THE OWNERS
REPRESENTATIVE. OUTAGES SHALL NOT EXCEED (8)
CONSECUTIVE HOURS.
C.TEMPORARY POWER: PROVIDE TEMPORARY POWER AS
NEEDED BY ALL TRADES DURING THE EXECUTION OF THIS
CONTRACT.
*NOT ALL SYMBOLS LISTED ARE USED.
SYMBOL
LIGHTING - EXISTING
DESCRIPTION
SITE ELECTRICAL
SYMBOL DESCRIPTION
SITE ELECTRICAL EQUIPMENT - EXISTING
SYMBOL DESCRIPTION
PROJECT NOTES ELECTRICAL LEGEND*
ABBREVIATIONS
SYMBOLS & ABBREVIATIONS
E0.00
E N G I N E E R S ,I N
1736 Fourth Avenue S., Suite A
Seattle, Washington 98134
P: 206.624.1387
www.pndengineers.comC.
100% REVIEW SUBMITTAL
GENE COULON MEMORIAL PARK
NORTH WATER WALK IMPROVEMENTS
04/26/2022 APRIL 2022
ISSUED FOR BID
LIGHTING FIXTURE SCHEDULE
E0.01
E N G I N E E R S ,I N
1736 Fourth Avenue S., Suite A
Seattle, Washington 98134
P: 206.624.1387
www.pndengineers.comC.
100% REVIEW SUBMITTAL
GENE COULON MEMORIAL PARK
NORTH WATER WALK IMPROVEMENTS
P2 - PILOT HOUSE RECEPTACLE P3 - TYPE 'FL' LUMINAIRE P4 - TYPE 'S12' BASE P5 - TYPE 'S12' LUMINAIREP1 - PIER DECK LIGHT1 2 3 4 5
P6 - TYPE 'FL' LUMINAIRE6
04/26/2022 APRIL 2022
ISSUED FOR BID
COPPER FEEDER SCHEDULE FEEDER SCHEDULE NOTES:
kW
G
200/2
PSE PAD MTD.
UTILITY CO. XFMR
200/2
G
60/2
G
SERVICE PANEL 'M-3'
800A - 120/208V, 3P, 4W
G G G
EXISTING CIRCUITS EXISTING CIRCUITS
G
200/2
20/1
G
20/1
G
PANEL 'A'
200A - 120/208V, 1P, 3W
G G
EXISTING CIRCUITS
G
60/2
20/1
G
20/1
G
PANEL 'PL'
60A - 120/208V, 1P, 3W
G G G
EXISTING CIRCUITS EXISTING CIRCUITS
9 11
20/1
24 26 28
TO TYPE 'NL'
NAVIGATION
LIGHTS
TO PILOT HOUSE
& LIGHT 'S12'
RECEPTACLE
TO TYPE 'FL'
PILOT HOUSE
LIGHTS
TO TYPE 'S0' &
'S0A' DECK
LIGHTS
TO TYPE 'S12'
LIGHTS
EXISTING CIRCUITS
kW
G
250/2
PSE PAD MTD.
UTILITY CO. XFMR
50/2
GG
SERVICE PANEL 'X'
250A - 120/208V, 1P, 3W
G G G
EXISTING CIRCUITS EXISTING CIRCUITS
TO PILOT
HOUSE CLAM
LIGHT OUTLET
50/2
(E) IVAR'S
BUILDING CLAM
LIGHT OUTLET
40,42 40,42
ENCLOSED (GFCI)
CIRCUIT BREAKER;
WALL MOUNTED
SINGLE LINE WIRING DIAGRAM
E1.00
E N G I N E E R S ,I N
1736 Fourth Avenue S., Suite A
Seattle, Washington 98134
P: 206.624.1387
www.pndengineers.comC.
100% REVIEW SUBMITTAL
GENE COULON MEMORIAL PARK
NORTH WATER WALK IMPROVEMENTS
SINGLE LINE WIRING DIAGRAM (PARTIAL)SINGLE LINE WIRING DIAGRAM (PARTIAL)
PAVILLION BUILDING IVARS BUILDING
PHOTO - EXT. NW CORNER IVARS BUILDING
1 2
3
04/26/2022 APRIL 2022
ISSUED FOR BID
ELECTRICAL SITE PLAN (WEST)
E2.00
E N G I N E E R S ,I N
1736 Fourth Avenue S., Suite A
Seattle, Washington 98134
P: 206.624.1387
www.pndengineers.comC.
100% REVIEW SUBMITTAL
GENE COULON MEMORIAL PARK
NORTH WATER WALK IMPROVEMENTS
ELECTRICAL SITE PLAN (WEST)1
04/26/2022 APRIL 2022
ISSUED FOR BID
ELECTRICAL SITE PLAN (EAST)
E2.01
E N G I N E E R S ,I N
1736 Fourth Avenue S., Suite A
Seattle, Washington 98134
P: 206.624.1387
www.pndengineers.comC.
100% REVIEW SUBMITTAL
GENE COULON MEMORIAL PARK
NORTH WATER WALK IMPROVEMENTS
ELECTRICAL SITE PLAN (EAST)
ENLARGED PILOT HOUSE PLAN PHOTO - EAST PAV. BLDG TO WEST PHOTO - WEST PAV. BLDG TO EAST
1
PHOTO - PILOT HOUSE HANDRAIL
04/26/2022 APRIL 2022
ISSUED FOR BID