A. REPORT TO THE HEARING EXAMINER
Hearing Date: July 26, 2022
Project File Number: PR22-000172
Project Name: Interim Maintenance Facility Improvements at Farwest
Land Use File Number: LUA22-000185, ECF, SA-H, CUP-H
Project Manager: Clark H. Close, Principal Planner
Owner: Nick Sidhu, Farwest Steel, 2000 Henderson Ave, Eugene, OR 97403
Applicant: Pat McLaughlin, King County Solid Waste Division, 201 S Jackson St, Ste 5701,
Seattle, WA 98104
Contact: Kinyan Lui, KCSWD, 201 S Jackson St, Ste 5701, Seattle, WA 98104
Project Location: 201 SW 34th St, Renton, WA 98057 (APN 1253800211)
Project Summary: The applicant, King County Solid Waste Division (KCSWD), is requesting Hearing
Examiner Conditional Use Permit, Site Plan Review, and Environmental (SEPA)
Review for a vehicle maintenance and storage facility at the Farwest Steel
Fabrication Facility. The Farwest facility is zoned Heavy Industrial (IH). KCSWD is
proposing to temporarily relocate locations from their vehicle maintenance and
stores operations at the Cedar Hills Regional Landfill facility to the Farwest facility
for approximately five (5) years as they redevelop the Cedar Hills location. The
facility would be repurposed as a vehicle maintenance, a combined parts stores and
general light storage, and office facility. Site plans include the addition of two (2)
temporary office and conference space modulars south and east of the existing
primary structure. These modulars would be removed as KCSWD exits the property.
No changes are proposed to the existing stormwater, detention ponds, frontage, or
landscaping. Life safety improvements, seismic restraints, sprinkler system
adjustments, and a temporary floor over one (1) loading bay would be installed
where required. Access to the site would be retained from SW 34th St. The City’s
mapping system has identified the subject property is within a high seismic hazard
area.
Site Area: 5.63 acres
East Valley Rd Lind Ave SW SW 34th St
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 2 of 16
SR_HEX_Report_KCSWD_220726_v1
B. EXHIBITS:
Exhibits 1-18: As shown in the Environmental Review Committee (ERC) Report
Exhibit 19: Staff Report to the Hearing Examiner
Exhibit 20: Environmental “SEPA” Determination and Notice
Exhibit 21: Conditional Use Permit Justification
C. GENERAL INFORMATION:
1. Owner(s) of Record: Nick Sidhu, Farwest Steel, 2000 Henderson Ave,
Eugene, OR 97403
2. Zoning Classification: Heavy Industrial (IH)
Auto Mall Area C
3. Comprehensive Plan Land Use Designation: Employment Area (EA)
4. Existing Site Use: Industrial and Fabrication
5. Critical Areas: High Seismic Hazard Area
6. Neighborhood Characteristics:
a. North: Employment Area (EA) Comprehensive Plan Land Use Designation; Heavy Industrial (IH)
zone
b. East: Employment Area (EA) Comprehensive Plan Land Use Designation; Heavy Industrial (IH)
zone
c. South: Employment Area (EA) Comprehensive Plan Land Use Designation; Medium Industrial
(IM) zone
d. West: Employment Area (EA) Comprehensive Plan Land Use Designation; Heavy Industrial (IH)
zone
7. Site Area: 5.63 acres
D. HISTORICAL/BACKGROUND:
Action Land Use File No. Ordinance No. Date
Comprehensive Plan N/A 5758 06/22/2015
Zoning N/A 5758 06/22/2015
Annexation (S 180th) N/A 1745 04/19/1959
LUA00-060 (Farwest Steel
Site Plan Modification)
LUA00-060 N/A 06/12/2000
E. PUBLIC SERVICES:
1. Existing Utilities
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 3 of 16
SR_HEX_Report_KCSWD_220726_v1
a. Water: Water service will be provided by the City of Renton. There is an existing 12” looped water line
around the existing building.
b. Sewer: Sewer service is provided by the City of Renton. There is an existing 8” private sewer main
withing a 12” protective ductile iron casing flowing north to south and underneath the primary shop
building.
c. Surface/Storm Water: The existing site contains a private storm drainage system. The existing private
storm drainage system consists of four (4) stormwater ponds/swales and associated parking lot
drainage conveyance system that is privately owned and maintained. The existing system outfalls to
the southwest via conveyance pipe that connects to the public storm system in Lind Ave SW.
2. Streets: SW 34th St is classified as a Collector Street with an existing right-of-way (ROW) width of 80’ as
measured using the King County Assessor’s Map. The existing street section contains four (4)
approximately 11’ wide travel lanes (2 west-bound and 2 east-bound) with curb, gutter, planter and 5’
sidewalks on both sides of the street.
3. Fire Protection: Renton Regional Fire Authority (RRFA)
F. APPLICABLE SECTIONS OF THE RENTON MUNICIPAL CODE:
1. Chapter 2 Land Use Districts
a. Section 4-2-020: Purpose and Intent of Zoning Districts
b. Section 4-2-060: Zoning Use Table – Uses Allowed in the Zoning Designations
c. Section 4-2-130: Industrial Development Standards
2. Chapter 3 Environmental Regulations and Overlay Districts
a. Section 4-3-050: Critical Area Regulations
3. Chapter 4 City-Wide Property Development Standards
4. Chapter 6 Streets and Utility Standards
a. Section 4-6-060: Street Standards
5. Chapter 9 Permits – Specific
a. Section 4-9-030: Conditional Use Permits
b. Section 4-9-200: Master Plan and Site Plan Review
6. Chapter 11 Definitions
G. APPLICABLE SECTIONS OF THE COMPREHENSIVE PLAN:
1. Land Use Element
H. FINDINGS OF FACT (FOF):
1. The Planning Division of the City of Renton accepted the above master application for review on May 26,
2022 and determined the application complete on June 2, 2022. The project complies with the 120-day
review period.
2. The project site is located at 201 SW 34th St, Renton, WA 98057.
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 4 of 16
SR_HEX_Report_KCSWD_220726_v1
3. The project site is currently developed as the Farwest Steel Fabrication Facility.
4. Access to the site would be provided via SW 34th St or Lind Ave SW.
5. The property is located within the Employment Area (EA) Comprehensive Plan land use designation.
6. The site is located within the Heavy Industrial (IH) zoning classification and within the Auto Mall Area C.
7. The applicant is proposing to retain all the existing trees onsite.
8. The site is mapped with high seismic hazards.
9. No fill, excavation or grading is proposed.
10. The applicant is proposing to begin tenant improvements following permit approval.
11. No public or agency comments were received.
12. Pursuant to the City of Renton's Environmental Ordinance and SEPA (RCW 43.21C, 1971 as amended), on
July 11, 2022 the Environmental Review Committee issued a Determination of Non -Significance (DNS) for
the Interim Maintenance Facility Improvements at Farwest (Exhibit 20). A 14-day appeal period
commenced on July 11, 2022 and ended on July 25, 2022. No appeals of the threshold determination were
received as of the date of this report.
13. Representatives from various city departments have reviewed the applicatio n materials to identify and
address issues raised by the proposed development. These comments are contained in the official file,
and the essence of the comments has been incorporated into the appropriate sections of this report and
the Departmental Recommendation at the end of this report.
14. Comprehensive Plan Compliance: The site is designated Employment Area (EA) on the City’s
Comprehensive Plan Map. The purpose of the EA designation is to provide a significant economic
development and employment base for the City. Maintain a variety and balance of uses through zoning
that promotes the gradual transition of uses on sites with good access and visibility to more intensive
commercial and office uses. The proposal is compliant with the following development standards if all
conditions of approval are met:
Compliance Comprehensive Plan Analysis
✓ Policy L-48: Address privacy and quality of life for existing residents by considering
scale and context in infill project design.
✓
Policy L-55: Preserve natural landforms, vegetation, distinctive stands of trees, natural
slopes, and scenic areas that contribute to the City’s identity, preserve property values,
and visually define the community and neighborhoods.
15. Zoning Development Standard Compliance: The purpose of the Heavy Industrial Zone (IH) is to provide
areas for high-intensity industrial activities involving heavy fabrication, processing of raw materials, bulk
handling and storage, construction, and heavy transportation. Uses in this zone may require large outdoor
areas in which to conduct operations. Environmental impacts may be produced that affect off -site areas,
requiring isolation of the industrial activity from more sensi tive land uses. Compatible uses that directly
serve the needs of other uses permitted within the district are also allowed. The proposal is compliant
with the following development standards, as outlined in RMC 4-2-130.A, if all conditions of approval are
met:
Compliance IH Zone Develop Standards and Analysis
✓
Use: The building and site improvements would create a vehicle maintenance facility,
a combined parts stores and general light storage, and office space.
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 5 of 16
SR_HEX_Report_KCSWD_220726_v1
Staff Comment: In accordance with the City’s adopted use table (RMC 4-2-060), other
government maintenance facilities are permitted via a Hearing Examiner Conditional
Use Permit within the IH zone.
✓
Lot Dimensions: The minimum lot size required in the IH zone is 35,000 sq. ft. There
are no minimum lot width or depth requirements.
Staff Comment: The existing site is 5.63 acres, which exceeds the minimum lot size
requirement. No subdivision of the project site is proposed.
✓
Setbacks: The minimum front yard setbacks are 20 feet along principal arterial streets
and 15 feet along other streets. The minimum secondary front yard setbacks are 20
feet along principal arterial streets and 15 feet along other streets. There are no side
or rear yard setback requirements, except 50 feet if abutting a lot zoned residential and
20 feet if a lot abuts a lot zoned CN, CV, CA, CD, CO, COR, or a lot with Public Facilities.
Staff Comment: The project site is not located near any residentially zoned properties
(Exhibit 3). As shown in the overall site plan, the existing building is setback 20’-10”
from SW 34th St, which is the project site’s front yard. The proposed temporary office
trailers would be placed no closer than approximately 57’-8” from the closest property
line (Exhibit 2). The proposed locations of the new office and conference space modulars
would comply with yard setbacks.
✓
Building Standards: There are no maximum lot coverage requirements for buildings in
the IH zone. There are no maximum building height requirements in the IH zone.
Staff Comment: The existing buildings have a combined building area of approximately
101,194 square feet and the Farwest Steel building has an overall building height of 55’-
10” (Exhibits 2, 4, and 6). The applicant is proposing to add two (2) temporary single-
story office and conference space modulars south and east of the existing primary
structure. Together the office modulars have a building area of 1,440 square feet. No
changes are proposed to the total impervious surface area (194,921 square feet) at the
site. The building coverage and maximum height proposed, with a maximum modular
height of 16’-3”, would comply with the requirements permitted in the I H zone (Exhibits
5 and 7).
Compliant if
condition of
approval is
met
Landscaping: The City’s landscape regulations (RMC 4-4-070) require a 10-foot
landscape strip along all public street frontages. Additional minimum planting strip
widths between the curb and sidewalk are established according to the street
development standards of RMC 4-6-060. Street trees and, at a minimum, groundcover,
are to be located in this area when present. Spacing standards shall be as stipulated by
the Department of Community and Economic Development, provided there shall be a
minimum of one street tree planted per address. Any additional undeveloped right-of-
way areas shall be landscaped unless otherwise determined by the Administrator.
All parking lots shall have perimeter landscaping as follows:
Such landscaping shall be at least ten feet (10') in width as measured from the street
right-of-way. Standards for planting shall be as follows:
a. Trees shall be two inches (2") in diameter at breast height (dbh) for multi-
family, commercial, and industrial uses at an average minimum rate of one
tree per thirty (30) lineal feet of street frontage.
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 6 of 16
SR_HEX_Report_KCSWD_220726_v1
b. Shrubs at the minimum rate of one per twenty (20) square feet of landscaped
area. Up to fifty percent (50%) of shrubs may be deciduous.
c. Ground cover in sufficient quantities to provide at least ninety percent (90%)
coverage of the landscaped area within three (3) years of installation.
Surface parking lots with more than fourteen (14) stalls shall be landscaped as
follows:
Surface parking lots with between 15 and 50 spaces shall provide 15 sf of landscaping
per parking space, 51 and 99 spaces shall provide 25 sf of landscaping per parking
space, and 100 or more spaces shall provide 35 sf of landscaping per parking space.
Perimeter parking lot landscaping shall be at least 10 feet in width, interior parking lot
landscaped areas shall have minimum dimensions of 8 feet (8’) by 12 feet (12’).
Staff Comment: Alterations or small additions determined by the Community and
Economic Development Administrator not to warrant improvements to the entire site
are exempt from all but the maintenance and street tree requirements. The project
frontage along SW 34th St includes four (4) street trees. No changes are proposed to
the existing landscaping. Therefore, staff is recommending as a condition of approval
that the applicant plant five (5) street trees at the designated vacant planting sites
within the center of the planting strip on SW 34th St. The landscape plan shall be
reviewed and approved by the Current Planning Project Manager prior to civil
construction permit issuance.
✓
Tree Retention: The City’s adopted Tree Retention and Land Clearing Regulations (4-4-
130) require the retention of 10 percent of trees in a commercial development.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy;
significant trees on slopes greater than twenty percent (20%); significant trees adjacent
to critical areas and their associated buffers; and significant trees over sixty feet (60')
in height or greater than eighteen inches (18") caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved;
other significant native evergreen or deciduous trees; and other significant non -native
trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have
been evaluated for retention and are not able to be retained, unless the alders and/ or
cottonwoods are used as part of an approved enhancement project within a critical
area or its buffer.
Staff Comment: No trees are proposed to be removed.
✓
Screening: All on-site surface mounted utility equipment shall be screened from public
view. Screening shall consist of equipment cabinets enclosing the utility equipment,
solid fencing or a wall of a height at least as high as the equipment it screens, or a
landscaped visual barrier allowing for reasonable access to equipment. Equipment
cabinets, fencing, and walls shall be made of materials and/or colors compatible with
building materials. All operating equipment located on the roof of any building shall be
enclosed so as to be screened from public view.
Staff Comment: The existing generator would remain at the current location behind the
existing building and screened from public view by the existing modular building. See
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 7 of 16
SR_HEX_Report_KCSWD_220726_v1
also FOF 15, Zoning Development Standard Compliance: Refuse and Recycling screening
below.
✓
Refuse and Recycling: In office, educational and institutional developments, a
minimum of two (2) square feet per every one thousand (1,000) square feet of building
gross floor area shall be provided for recyclables deposit areas and a minimum of four
(4) square feet per one thousand (1,000) square feet of building gross floor area shall
be provided for refuse deposit areas. A total minimum area of one hundred (100)
square feet shall be provided for recycling and refuse deposit areas.
Staff Comment: The applicant is proposing a six foot (6’) coated cyclone fence with
wood slat privacy inserts to screen the multi-purpose refuse and recycling area located
on the south side of the Farwest building (Exhibits 2 and 9). The combined gross building
areas would total 102,634 square feet. A total of 205 square feet of recyclables deposit
areas would be required and 410 square feet of refuse deposit areas would be required
for a total service area of 615 square feet. An approximately 3,568 square foot multi-
purpose service area or exterior support storage area is more than the 615 square foot
minimum requirement.
✓
Parking: Parking regulations require that office uses provide a minimum of 2.0 spaces
per 1,000 square feet of net floor area and a maximum of 4.5 parking spaces per 1,000
square feet of net floor area, vehicle service and repair provide a minimum and
maximum of 2.5 per 1,000 square f eet of net floor area, and indoor storage uses
provide a minimum and maximum of 1 space per 1,500 square feet of net floor area.
Standard parking stall dimensions are 9 feet by 20 feet, compact stall dimensions are 8
½ feet by 16 feet.
Staff Comment: The proposed other government maintenance facility would be
constructed with an anticipated office area of 3,405 square feet amongst the different
buildings, vehicle maintenance and service repair area of 23,057 square feet, and
indoor storage area of 17,902 square feet. Based on the proposed for 3,405 square feet
of office uses, the project site would be required to provided 7-15 parking spaces. Based
on the 23,057 square feet proposed for vehicle service and repair, the proposal would
be required to provide 58 spaces. Based on the 17,902 square feet proposed for indoor
storage, the proposal would be required to provide 12 spaces. A total of 77-85 spaces
would be required on the project site. The applicant has proposed a total of 81 spaces,
which falls within the required parking range for these three (3) uses.
Compliant if
condition of
approval is
met
Bicycle Parking: The number of bicycle parking spaces shall be equal to ten percent
(10%) of the number of required off-street vehicle parking spaces.
Staff Comment: The applicant is proposing eight (8) total bicycle parking spaces (five
(5) existing and three (3) new spaces), which complies with the required number of
bicycle parking spaces (Exhibit 2).
Per RMC 4-4-080.F.11.c bicycle parking for office use shall be provided for secure
extended use and shall protect the entire bicycle and its components and accessories
from theft and weather. Acceptable examples include bike lockers, bike check -in
systems, in-building parking, and limited access fenced areas with weather protection.
The submitted application materials do not indicate the required bicycle park ing spaces.
Therefore, staff recommends as a condition of approval that the applicant provide
bicycle parking for up to eight (8) stalls in accordance with RMC 4-4-080F.11. Bicycle
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 8 of 16
SR_HEX_Report_KCSWD_220726_v1
parking shall be reviewed and approved by the Current Planning Project Mana ger prior
to building permit issuance.
✓
Fences and Retaining Walls: A maximum of eight feet (8') anywhere on the lot provided
the fence, retaining wall or hedge does not stand in or in front of any required
landscaping or pose a traffic vision hazard.
There shall be a minimum three-foot (3') landscaped setback at the base of retaining
walls abutting public rights-of-way.
Staff Comment: No retaining walls are proposed. The project site includes existing
perimeter chain link fencing along property. In addition, see FOF 15, Zoning
Development Standard Compliance: Refuse and Recycling for proposed new internal
fencing.
16. Critical Areas: Project sites which contain critical areas are required to comply with the Critical Areas
Regulations (RMC 4-3-050). The proposal contains high seismic hazard areas. The applicant is proposing
to bring two (2) office modulars to the Farwest Facility for additional office space. A building permit would
be required to place the new office modulars. it is anticipated that the City’s currently adopted building
codes would adequately mitigate for any impacts that could result from the proposed project
improvements. No critical area conditions are proposed.
17. Site Plan Review: Pursuant to RMC 4-9-200.B, Site Plan Review is required for development in the IH
zoning classification when it is not exempt from Environmental (SEPA) Review. For Master Plan
applications compliance with the review criteria for Site Plans are analyzed at a general level of detail to
ensure nothing would preclude the development of the Site Plan. Given Site Plan applications are
evaluated for compliance with the specific requirements of the RMC 4 -9-200.E.3 the following table
contains project elements intended to comply with level of detail n eeded for Site Plan requests:
Compliance Site Plan Criteria and Analysis
Compliant if
conditions of
approval are
met
a. Comprehensive Plan Compliance and Consistency.
Staff Comment: See previous discussion under FOF 14, Comprehensive Plan Analysis.
Compliant if
conditions of
approval are
met
b. Zoning Compliance and Consistency.
Staff Comment: See discussion under FOF 15, Zoning Development Standard
Compliance.
N/A
c. Design Regulation Compliance and Consistency.
Staff Comment: Not applicable, the project site is not located within and Urban Design
District.
N/A
d. Planned action ordinance and Development agreement Compliance and
Consistency.
Compliance
not yet
demonstrated
e. Off-site Impacts.
Structures: Restricting overscale structures and overconcentration of development
on a particular portion of the site.
Staff Comment: The project proposal includes the conversion of the existing 101,194
square foot Farwest Steel Facility to a vehicle maintenance, a combined parts stores
and general light storage, and two (2) one-story office modular buildings. The proposed
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 9 of 16
SR_HEX_Report_KCSWD_220726_v1
uses would be established on a temporary basis over the 5.63-acre site and would not
be overscale for the site and would not include an overconcentration of development
on a particular portion of the project site.
Circulation: Providing desirable transitions and linkages between uses, streets,
walkways and adjacent properties.
Staff Comment: The proposal includes limited site access for pedestrians to enter or exit
the site. The proposal includes an asphalt driveway from SW 34th St and asphalt road
with an ingress/egress access easement through parcel no. 1253600062 for site access
to Lind Ave SW. The site improvements allow for linkages between uses, streets, and
adjacent properties as constructed for the desired use.
The site currently contains two (2) ADA parking stalls for the existing office buildings
and the applicant is proposing two (2) additional ADA parking stalls within another
portion of the parking area (closer to SW 34th St). An ADA compliant accessible route
of travel is required from each parking stall to accessible entrances on the building(s).
At the time of building permit application, the applicant would be required to
demonstrate that the current and proposed stalls and routes meet current ADA
requirements and if determined deficient, construct or modify improvements as
necessary.
An accessible route of travel (ART) is required from the public right -of-way to the
existing building meeting current Americans with Disabilities Act’s (ADA) requirements.
There is not currently an identified route from the public sidewalks in the right-of-way
to the building entrances. The applicant would be required to demonstrate that there
exists a route that meets current ADA requirements or if determined deficient, const ruct
or modify improvements as necessary.
Utilities, Loading and Storage Areas: Locating, designing and screening storage
areas, utilities, rooftop equipment, loading areas, and refuse and recyclables to
minimize views from surrounding properties. Locate utilities underground
consistent with RMC 4-6-090.
Staff Comment: See FOF 15, Zoning Development Standard Compliance: Screening and
Refuse and Recycling.
Views: Recognizing the public benefit and desirability of maintaining visual
accessibility to attractive natural features.
Staff Comment: The existing buildings and proposed one-story modular buildings are
not anticipated to impact views beyond what currently exists.
Landscaping: Using landscaping to provide transitions between development and
surrounding properties to reduce noise and glare, maintain privacy, and generally
enhance the appearance of the project.
Staff Comment: See discussion under FOF 15, Zoning Development Standard
Compliance: Landscaping.
Lighting: Designing and/or placing exterior lighting and glazing in order to avoid
excessive brightness or glare to adjacent properties and streets.
Staff Comment: A site lighting plan and site illumination plan were provided with the
submitted application (Exhibits 10 and 11). New lighting fixtures, mounted wall packs
on the modular buildings, are proposed. All other existing site lighting is proposed to be
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 10 of 16
SR_HEX_Report_KCSWD_220726_v1
retained. The proposed tenant improvements are not anticipated to produce any
significant additional glare or light during normal operating hours (Exhibit 16).
✓
f. On-site Impacts.
Structure Placement: Provisions for privacy and noise reduction by building
placement, spacing and orientation.
Staff Comment: The existing and proposed buildings have been or would be situated
towards the northern portion of the project site. The new office modulars are not
anticipated to create noise impacts on adjacent properties.
Structure Scale: Consideration of the scale of proposed structures in relation to
natural characteristics, views and vistas, site amenities, sunlight, prevailing winds,
and pedestrian and vehicle needs.
Staff Comment: The proposed modulars would create additional temporary office space
at the Farwest facility and would be of an appropriate scale for the 5.63-acre parcel.
Site circulation would remain adequate to meet vehicular and pedestrian needs. It is
anticipated that the scale of the overall temporary project would be appropriate and
would not have an adverse impact on natural characteristics, views and vistas, site
amenities, sunlight, prevailing winds, and pedestrian and vehicle needs.
Natural Features: Protection of the natural landscape by retaining existing
vegetation and soils, using topography to reduce undue cutt ing and filling, and
limiting impervious surfaces.
Staff Comment: The applicant is proposing to protect the site landscaping by retaining
existing vegetation and soils. No cutting or filling is proposed.
Reducing Parking Impervious Areas: Design parking areas to minimize impervious
surfaces, including but not limited to: (1) breaking up parking areas and directing
stormwater flows to multiple low impact development features such as
bioretention areas; (2) locating parking near trees to provide storm water uptake;
(3) retaining or adding vegetation to parking areas; (4) placing existing parking that
exceeds maximum parking ratios in permeable pavement designed consistent with
the Surface Water Design Manual in RMC 4-6-030; and (5) using other low impact
development techniques consistent with RMC 4-6-030
Staff Comment: No changes are proposed to the existing impervious area or parking
layout.
Landscaping: Use of landscaping to soften the appearance of parking areas, to
provide shade and privacy where needed, to define and enhance open spaces, and
generally to enhance the appearance of the project. Landscaping also includes the
design and protection of planting areas so that they are less susceptible to damage
from vehicles or pedestrian movements.
Staff Comment: See FOF 15, Zoning Development Standard Compliance: Landscaping.
Compliant if
condition of
approval is
met
g. Access and Circulation.
Location and Consolidation: Providing access points on side streets or frontage
streets rather than directly onto arterial streets and consolidation of ingress and
egress points on the site and, when feasible, with adjacent properties.
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 11 of 16
SR_HEX_Report_KCSWD_220726_v1
Staff Comment: No changes are proposed to the existing access points from SW 34th St
or Lind Ave SW.
Internal Circulation: Promoting safety and efficiency of the internal circulation
system, including the location, design and dimensions of vehicular and pedestrian
access points, drives, parking, turnarounds, walkways, bikeways, and emergency
access ways.
Staff Comment: No changes are proposed to the existing internal circulation system.
The Renton Regional Fire Authority (RRFA) has reviewed the proposal and has
determined that the proposal would meet the requirements for apparatus access
roadways and existing on-site fire lanes, provided they are maintained.
Loading and Delivery: Separating loading and delivery areas from parking and
pedestrian areas.
Staff Comment: See previous discussion above under Loading and Storage Areas.
Transit and Bicycles: Providing transit, carpools and bicycle facilities and access.
Staff Comment: Per RMC 4-4-080F.11.a bicycle parking spaces are required at 10% of
the number of required off-street parking spaces. Based on the minimum of 77 parking
spaces are required to be on the project site, a total of eight (8) bicycle spaces would be
required. Bicycle parking shall be provided for secure extended use and shall protect the
entire bicycle and its components and accessories from theft and weather. Acceptable
examples include bike lockers, bike check-in systems, in-building parking, and limited
access fenced areas with weather protection. For in-building bike parking and limited
access fenced areas, fixed structures for locking individual bikes, such as racks, must be
provided within the facility. For fenced areas, the fence shall be either six feet (6’) high,
or be floor-to-ceiling. A bicycle parking detail was not provided with the land use
application materials. Staff recommended, as a condition of approval, that bicycle
parking be provided in accordance with RMC 4 -4-080F.11. A bicycle parking detail shall
be provided at the time of building permit review to the Current Planning Project
Manager for review and approval.
Pedestrians: Providing safe and attractive pedestrian connections between parking
areas, buildings, public sidewalks and adjacent properties.
Staff Comment: See previous discussion above under Circulation.
✓
h. Open Space: Incorporating open spaces to serve as distinctive project focal points
and to provide adequate areas for passive and active recreation by the
occupants/users of the site.
Staff Comment: The proposal includes retention of the existing landscaped area
between the front of the building and SW 34th St and the landscape buffers along the
other property lines.
✓
i. Views and Public Access: When possible, providing view corridors to shorelines and
Mt. Rainier, and incorporating public access to shorelines
Staff Comment: The proposed structure would not block view corridors to shorelines or
Mt. Rainier. The public access requirement is not applicable to the proposal.
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 12 of 16
SR_HEX_Report_KCSWD_220726_v1
✓
j. Natural Systems: Arranging project elements to protect existing natural systems
where applicable.
Staff Comment: These areas are not proposed to be impacted by the proposed
improvements.
✓
k. Services and Infrastructure: Making available public services and facilities to
accommodate the proposed use:
Police and Fire.
Staff Comment: Police and Fire Prevention staff indicated that sufficient resources exist
to furnish services to the proposed improvements , subject to the condition that the
applicant provides Code required improvements and fees. Fire impact fees are
applicable and the 2022 rate is $0.26 per square foot of new office area for the modular
additions. This fire impact fee may change and is calculated and paid at time of building
permit issuance (Exhibit 18).
Water and Sewer.
Staff Comment: Water service is provided by the City of Renton. The project is within
the City of Renton’s water service area in the Valley 196 Pressure Zone. There is an
existing 12” looped water line around the existing building (Exhibits 12 and 18). Below
is a summary of the existing fire hydrants in the vicinity of the site: a) two (2) south of
the building within the parking lot of the facility; b) one (1) northwest of the building in
SW 34th St; and c) one (1) northeast of the building in SW 34th St.
There is an existing 3” domestic water service and meter serving the existing building
and outbuildings with two (2) reduced pressure backflow assemblies (RPBA) for
backflow prevention. There is an existing 2” irrigation service and meter serving the site.
There is an existing 6” fire water service serving the existing building with a double
check detector assembly (DCDA) for backflow prevention. The project is not proposing
any new additions or tenant improvements as related to water demand.
Sewer service is provided by the City of Renton. There is an existing 8” private sewer
main within a 12” protective ductile iron casing flowing north to south and underneath
the primary shop building. South of the building, there are two (2) existing 6” side sewer
connections into a private sewer manhole that is located beneath one of the portable
buildings. The project is proposing to use the existing facility in a manner consistent
with the existing use that would not increase the sewer demand.
Drainage.
Staff Comment: The existing site contains a private storm drainage system. The existing
site is primarily flat with no wetlands, steep slopes and only a seismic hazard area
(Exhibit 13). The existing private storm drainage system consists of four (4) stormwater
ponds/swales and associated parking lot drainage conveyance system that is privately
owned and maintained. The existing system outfalls to the southwest via conveyance
pipe that connects to the public storm system in Lind Ave SW.
Replaced impervious surfac e area is limited to any code required ADA upgrades, and
construction of a new 2,000 square-foot refuse, recycling and storage area over existing
impervious surface. The project is pursuing the use of an Oyster Shell Barrel Stormwater
Treatment System in keeping with the King County Energy Star Program and overall
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 13 of 16
SR_HEX_Report_KCSWD_220726_v1
commitment to sustainability. A stormwater permit with a written drainage assessment
would be required in conjunction with the building permit application.
Transportation.
Staff Comment: The applicant submitted a Transportation Impact Scoping Analysis,
prepared by KPG Psomas, dated April 1, 2022 (Exhibit 14). The new use is not
anticipated to generate any significant traffic impacts above that of the previous use
(Exhibit 1) and no traffic or transportation impacts, nor noisy or noxious situations are
anticipated by the applicant (Exhibit 17).
Access to the site is proposed via SW 34th St and the south via private parking lot and
drive aisle connection. Both existing accesses would be required to remain unblocked
and any gates have keys provided to the Renton Regional Fire Authority that maintains
the circulation pattern for parking and fire vehicles around the building.
SW 34th St is classified as a Collector Street with an existing right-of-way (ROW) width
of 80’ as measured using the King County Assessor’s Map. The existing street section
contains four (4) approximately 11-foot (11’) wide travel lanes (2 west-bound and 2
east-bound) with curb, gutter, planter, and five-foot (5’) wide sidewalks on both sides
of the street. As the project is proposing an interior remodel and no new construction
or additions valued at over $175,000 to the site outside the primary buildings, no street
frontage improvements or right of way dedication are require d, however, if during
building permit review it is determined that additional outside site and parking/lot
improvements are required, the project may become subject to further transportation
review and/or frontage improvements.
At completion of the project, the improvements would have met City of Renton
concurrency requirements (Exhibit 15), which is based upon a test of the citywide
Transportation Plan, consideration of growth levels included in the LOS -tested
Transportation Plan, site specific improvements, and future payment of Transportation
Impact Fees. Increased traffic created by the development would be mitigated by
payment of transportation impact fees. The transportation impact fee that is current at
the time of building permit application would be levied.
N/A l. Phasing: The applicant is not requesting any additional phasing.
✓
m. Stormwater: Providing optimal locations of stormwater infiltrating low impact
development facilities. Avoiding placement of buildings or impervious areas on
soils with infiltration capability to the maximum extent practicable.
Staff Comment: The project is proposing to use the existing facility in a manner
consistent with the existing use that would not result in any new impervious surface
area. No storm drainage improvements are required as no new and/or replaced
impervious surface is proposed, however, if during building permit review it is
determined that outside site and parking/lot improvements are required, the project
may become subject to further stormwater review. Tenant improvements, installation
of the new portables, and construction of the refuse, recycling and storage area would
need to follow source control and temporary erosion and sediment control best
management practices.
18. Conditional Use Analysis: The applicant is requesting a Hearing Examiner Conditional Use Permit for the
Subject property to temporarily relocate locations from their vehicle maintenance and stores operations
at the Cedar Hills Regional Landfill facility to the Farwest facility for approximately five (5) years as they
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 14 of 16
SR_HEX_Report_KCSWD_220726_v1
redevelop the Cedar Hills location (Exhibit 21). The existing facility would be repurposed as an other
government maintenance facility use for vehicle maintenance, a combined parts stores and general light
storage, and office use. The proposal is compliant with the following condi tional use criteria, pursuant to
RMC 4-9-030.D. Therefore, staff recommends approval of the requested Conditional Use Permit.
Compliance Conditional Use Criteria and Analysis
Compliant if
condition of
approval is
met
a. Consistency with Plans and Regulations: The proposed use shall be compatible
with the general goals, objectives, policies and standards of the Comprehensive
Plan, the zoning regulations and any other plans, programs, maps or ordinances of
the City of Renton.
Staff Comment: The applicant is proposing to temporarily relocate, for approximately
five (5) years, much of its vehicle maintenance and stores operations from their Cedar
Hills Regional Landfill facility to the Farwest facility. The primary function of the facility
would be servicing the KCSW road vehicle fleet. Long-term storage of vehicles and
equipment would be accommodated elsewhere in King County at the applicant’s other
facilities. Tenant improvements to the facility and site are intended to be minimal in
keeping with the temporary nature of KCSW’s occupation of the property. Facility
adaptation to KCSW’s requirements would be managed through the installation of
KCSW owned or purchased equipment which are intended to be removed and retained
by KCSW after departure from the site. The other government maintenance facility
would be consistent with the stated policies of the 2015 City of Renton Comprehensive
Plan, see FOF 14, Comprehensive Plan Compliance. The proposed temporary use would
also be compatible with the immediate area and the IH zoning district provided the
applicant limits the other government maintenance facility use to the requested five (5)
year period. If approved, staff is recommending as a condition of approval that the
conditional use permit decision expire five (5) years from the date of decision.
In addition, see FOF 15, Zoning Development Standard Compliance.
✓
b. Appropriate Location: The proposed location shall not result in the detrimental
overconcentration of a particular use within the City or within the immediate area
of the proposed use. The proposed location shall be suited for the proposed use.
Staff Comment: The former Farwest facility was a heavy industry fabrication facility
classified as an F-1 (Manufacturing) use. The proposed use of the building is temporary
vehicle maintenance and stores operations, and S-1 Vehicle Maintenance classification
with supporting office space. Large vehicle service and repair is permissible in the IH
zone when not leased by a government for maintenance facilities. Therefore, the
proposed use, at this location, would be an ideal location based on the character of the
surrounding neighborhood. The proposed project would not result in the detrimental
overconcentration of a particular use within the City or withi n the immediate area of
the proposed use, provided the conditions of approval are met.
✓
c. Effect on Adjacent Properties: The proposed use at the proposed location shall not
result in substantial or undue adverse effects on adjacent property.
Staff Comment: The surrounding properties include warehouses, steel manufacturing,
product distribution centers, and auto showrooms/lots also within the IH designation,
as well as warehouses and auto retailers within the IM zoning designation. The current
use of the site is a vacant office and warehouse, previously used as a steel distribution
center. According to the applicant, plate, beam, channel and other structural steel in
bulk quantities were delivered by rail and truck. Steel was unloaded by gantry crane or
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 15 of 16
SR_HEX_Report_KCSWD_220726_v1
forklift, cut to order on site by saw, slicer or burning machine, from 8:00 am to 5:00 pm
Monday through Friday and on weekends as needed. It is anticipated that adjacent
properties should experience a reduction in disturbance from the former activities. The
addition of modular structures and some required screening elements on the Farwest
Facility site would be compatible with these properties.
✓
d. Compatibility: The proposed use shall be compatible with the scale and chara cter
of the neighborhood.
Staff Comment: There are no proposed significant site or exterior improvements
proposed to the existing structures. The two (2) new office modulars would be similar
to the existing small office buildings in height and mass and would be painted by the
applicant to complement the existing color palette (Exhibits 5 and 8). The applicant is
proposing to place and orient the screening elements and ADA access ramps to
aesthetically unify the new and existing elements. Therefore, the proposed use would
be compatible in both scale and character with the surrounding neighborhood.
✓
e. Parking: Adequate parking is, or will be made, available.
Staff Comment: The applicant is proposing to comply with the parking requirements
based on the proposed uses and number of required parking spaces required by code
(Exhibit 2). Additional bicycle parking would be provided. See FOF 15, Zoning
Development Standard Compliance: Bicycle Parking.
✓
f. Traffic: The use shall ensure safe movement for vehicles and pedestrians and shall
mitigate potential effects on the surrounding area.
Staff Comment: According to the applicant, the existing site access points and vehicle
transportation routes at the northeast and southwest would be retained and u tilized
for the proposed change of use. No truck access is proposed from the southwest via Lind
Ave SW. No changes are proposed to the existing pedestrian paths from bus stops. It is
not anticipated that the proposed project would generate any significant traffic impacts
to the area roadways and intersections. See FOF 17, Site Plan Review: Circulation for
more information.
✓
g. Noise, Light and Glare: Potential noise, light and glare impacts from the proposed
use shall be evaluated and mitigated.
Staff Comment: According to the applicant, noise generated from the proposed facility
is anticipated to be significantly reduced from the previous occupancy, and to present
no adverse effects on the surrounding community. The applicant is not proposing to
utilize the existing railroad system to the west of the property. The existing light fixtures
are proposed to remain and the applicant is proposing to install new shrouded fixtures
to the existing lights in order to provide safe access and wayfinding to the new office
modulars (Exhibit 10). See FOF 17, Site Plan Review: Lighting for more information.
✓
h. Landscaping: Landscaping shall be provided in all areas not occupied by buildings,
paving, or critical areas. Additional landscaping may be required to buffer adjacent
properties from potentially adverse effects of the proposed use.
Staff Comment: No changes are proposed to the existing landscaping. All new structures
would be sited on existing paved and/or impervious areas located to the west or south
of the existing building. Screening would be provided by the existing building as well as
City of Renton Department of Community & Economic Development
Interim Maintenance Facility Improvements at Farwest
Staff Report to the Hearing Examiner
LUA22-000185, ECF, SA-H, CUP-H
Report of July 26, 2022 Page 16 of 16
SR_HEX_Report_KCSWD_220726_v1
6’-0” high slatted fencing. In addition, see FOF 15, Zoning Development Standard
Compliance: Refuse and Recycling for proposed new internal fencing.
I. CONCLUSIONS:
1. The subject site is located in the Employment Area (EA) Comprehensive Plan designation and complies
with the goals and policies established with this designation , see FOF 14.
2. The subject site is located in the Heavy Industrial (IH) zoning designation and complies with the zoning
and development standards established with this designation provided the applicant complies with City
Code and conditions of approval, see FOF 15.
3. The proposed interim maintenance facility improvement project complies with the Critical Areas
Regulations provided the applicant complies with City Code, see FOF 16.
4. The proposed interim maintenance facility improvement project complies with the site plan review
criteria as established by City Code and state law provided all advisory notes and conditions are complied
with, see FOF 17.
5. There are adequate public services and facilities to accommodate the proposed interim maintenance
facility improvement project, see FOF 17.
6. The proposed interim maintenance facility improvement project complies with the street and
transportation standards as established by City Code, see FOF 17.
7. The proposed interim maintenance facility improvement project complies with the conditional use criteria
as established by City Code, provided the project complies with all advisory notes and conditions of
approval contained herein, see FOF 18.
8. Key features, which are integral to this project include the addition of two (2) office modulars on the 5.63-
acre site for up to five (5) years during the KCSW occupancy and then being removed when KCSW leaves
the site.
J. RECOMMENDATION:
Staff recommends approval of the Interim Maintenance Facility Improvements at Farwest, File No. LUA22-
000185, ECF, SA-H, CUP-H, as depicted in the Overall Site Plan (Exhibit 2), subject to the following condition(s):
1. The applicant shall plant five (5) street trees at the designated vacant planting sites within the center of
the planting strip on SW 34th St. The landscape plan shall be reviewed and approved by the Current
Planning Project Manager prior to civil construction permit issuance.
2. Bicycle parking for up to eight (8) stalls shall be provided in accordance with RMC 4-4-080F.11. A bicycle
parking detail shall be provided at the time of building permit review to the Current Planning Project
Manager for review and approval prior to building permit issuance.
3. The Conditional Use Permit decision shall expire five (5) years from the date of decision.
CITY OF RENTON
DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT
STAFF REPORT TO THE HEARING EXAMINER
EXHIBITS
Project Name:
Interim Maintenance Facility Improvements at
Farwest
Land Use File Number:
LUA22-000185, ECF, SA-H, CUP-H
Date of Hearing
July 26, 2022
Staff Contact
Clark H. Close
Principal Planner
Project Contact/Applicant
Kinyan Lui, KCSWD
201 S Jackson St, Ste 5701,
Seattle, WA 98104
Project Location
201 SW 34th St, Renton,
WA 98057
The following exhibits are included with the Staff Report to the Hearing Examiner:
Exhibits 1-18: As shown in the Environmental Review Committee (ERC) Report
Exhibit 19: Staff Report to the Hearing Examiner
Exhibit 20: Environmental “SEPA” Determination and Notice
Exhibit 21: Conditional Use Permit Justification