Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-07-11_FR_037 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 07/11/2022 Renton Elementary School 16 20180398E003 037 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Scott R. Hannah, L.G. Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Client Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sun 80’s THE FOLLOWING WAS NOTED: Water Line: AESI was onsite at 1:30pm and observed Continental Dirt Contractors (CDC) finishing installation at the western end of the 10-inch diameter, water line they installed today. CDC bedded the pipe with crushed rock (5/8-inch minus) to approximately 6 inches over the top of the pipe followed by backfilling with onsite soil. Approximately 2-1/2 to 3 feet of soil backfill was needed to reach surrounding grade. The onsite soil consisted of gray, silty sand with some gravel to brown, sand with some silt. Several areas were left uncovered at water valves and where steel plates were temporarily placed over the trench for equipment access. CDC used a vibratory plate attached to a large excavator to compact the backfill in at least two lifts. The compacted material probed only 1-2 inches with a ½ inch diameter, steel soil probe and was in a firm and unyielding condition. Test results are shown on the table below in Table 1 and the test locations are shown on Figure 1. Table 1: Density Test Results Test No. Location Depth below existing grade (ft) Proctor (ASTM D1557) Dry Density (pcf) Moisture % Compaction % Pass/Fail 1 Water, See Figure 1 0 133.5 131.9 7.0 99 Pass 2 Water, See Figure 1 0 133.5 131.0 6.1 98 Pass 3 Water, See Figure 1 0 126.9 122.5 8.1 97 Pass 4 Water, See Figure 1 0 126.9 125.3 8.8 99 Pass Figure 1: Waterline trench compaction test locations in red 1 2 3 4 16 Date Project Name Project No. Report No. 07/11/2022 Renton ES 16 20180398E003 037 Page 2 of 2 FIELD REPORT Shallow waterline and trench with bedding. Looking E. in left photo, W. in right photo