FIELD REPORT
Date Project Name Project No. Report No.
07/11/2022 Renton Elementary School 16 20180398E003 037
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Scott R. Hannah, L.G.
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Client
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sun 80’s
THE FOLLOWING WAS NOTED:
Water Line:
AESI was onsite at 1:30pm and observed Continental Dirt Contractors (CDC) finishing installation at the western end of the 10-inch
diameter, water line they installed today. CDC bedded the pipe with crushed rock (5/8-inch minus) to approximately 6 inches over the
top of the pipe followed by backfilling with onsite soil. Approximately 2-1/2 to 3 feet of soil backfill was needed to reach surrounding
grade. The onsite soil consisted of gray, silty sand with some gravel to brown, sand with some silt. Several areas were left uncovered
at water valves and where steel plates were temporarily placed over the trench for equipment access. CDC used a vibratory plate
attached to a large excavator to compact the backfill in at least two lifts. The compacted material probed only 1-2 inches with a ½
inch diameter, steel soil probe and was in a firm and unyielding condition. Test results are shown on the table below in Table 1 and
the test locations are shown on Figure 1.
Table 1: Density Test Results
Test
No. Location Depth below
existing grade (ft)
Proctor (ASTM
D1557)
Dry
Density
(pcf)
Moisture
%
Compaction
% Pass/Fail
1 Water, See Figure 1 0 133.5 131.9 7.0 99 Pass
2 Water, See Figure 1 0 133.5 131.0 6.1 98 Pass
3 Water, See Figure 1 0 126.9 122.5 8.1 97 Pass
4 Water, See Figure 1 0 126.9 125.3 8.8 99 Pass
Figure 1: Waterline trench compaction test locations in red
1 2 3 4
16
Date Project Name Project No. Report No.
07/11/2022 Renton ES 16 20180398E003 037
Page 2 of 2
FIELD REPORT
Shallow waterline and trench with bedding. Looking E. in left photo, W. in right photo