Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_20220720_TESC_012 www.aesgeo.com This document is considered DRAFT until reviewed and initialed by an AESI Project Manager Temporary Erosion and Sediment Control Monitoring DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO. 07/20/2022 Renton ES 16 20180398E003 012 LOCATION CITY MUNICIPALITY CSWGP 1075 Duvall Ave NE Renton Renton WAR310781 PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL 07/11/2022 Renton School District 403 Sun 70 Deg 0.00 0.01 AESI FIELD REP Samantha Parker AESI PROJECT MANAGER Bruce Guenzler Samantha Parker QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS) CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS Gravel, quarry spalls Locked chain link fences WHEEL WASH SEDIMENT TRACK OUT N/A City construction in right of way, not under this permit. ROADWAY SURFACE CATCH BASIN Crushed rock, quarry spalls Silt socks installed in catch basins LIMITS BUFFER AREA STABILIZATION Marked with chain link fences N/A SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation) Installed along site perimeter Building Footings, Stairs COVER MEARSURES OVERALL STRAW Good, no exposed slopes N/A PLASTIC SHEETING HYDROSEED N/A N/A CONVEYENCE CHANNEL CHECK DAMS N/A N/A STOCKPILE COVER PIPE SLOPE DRAINS N/A N/A LEVEL SPREADER LANDSCAPE/MULCH N/A N/A SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET N/A N/A SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION (Creek, Wetland, or Lake) (Clear, Turbid, Sheen) N/A N/A WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL N/A N/A N/A Good SAMPLE LOCATION AREAS OF CONCERN N/A N/A CORRECTIVE ACTIONS PAST CORRECTIVE ACTIONS N/A Is this site in compliance with the terms and conditions of the SWPP and NPDES discharge Permit? Yes www.aesgeo.com TESC REPORT DATE CSWGP PROJECT NO. TESC REPORT NO. 07/20/2022 WAR310781 20180398E003 012 Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance ADDITIONAL COMMENTS: No substantial precipitation. Site graded to drain to a closed depression on the north end of the project. No offsite storm water discharge. Recent water line flushing / sanitization has resulted in water in the closed depression but no offsite discharge.