HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_190506_v1.pdfPreliminary Construction Mitigation Plan
For Tran Short Plat
Proposed Construction Dates (begin and end dates):
Based on this preliminary short plat application date, we anticipate construction permits
for utilities and plat infrastructure (sidewalks, etc.) to be finalized in summer of 2019 with
utility and plat infrastructure construction possibly beginning in late fall of 2019. Home
construction on the lots should begin during the Late Fall of 2019 and run through at
least spring of 2020
Hours and Days of Operation:
Construction activities will be limited to the hours between 7:00am and 8:00pm, Monday
through Friday and 9:00am and 8:00pm Saturday. In addition, haul hours are limited to
the hours between 8:30am and 3:30pm on Saturdays, unless approved in writing in
advance by the development services division.
Proposed Hauling/Transportation Routes:
The site is accessible from the 113th Ave SE & SE 168th Street
Measures to be implemented to minimize dust, traffic and transportation impact,
erosion, mud, noise and other noxious characteristics:
Water Truck, Temporary Erosion Control Plan, BMPs, construction proposed during City
of Renton permitted work hours.
Any special hours proposed for construction or hauling (i.e. weekends, late
nights):
No special hours for construction or hauling are anticipated or proposed at this time.
Preliminary Traffic Control Plan:
Construction signage will place along SE 168 th Street, the construction will conduct
onsite, there is no public disturb, therefore no traffic control plan is needed.