HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_190506_v1.pdfPreliminary Construction Mitigation Plan For Tran Short Plat Proposed Construction Dates (begin and end dates): Based on this preliminary short plat application date, we anticipate construction permits for utilities and plat infrastructure (sidewalks, etc.) to be finalized in summer of 2019 with utility and plat infrastructure construction possibly beginning in late fall of 2019. Home construction on the lots should begin during the Late Fall of 2019 and run through at least spring of 2020 Hours and Days of Operation: Construction activities will be limited to the hours between 7:00am and 8:00pm, Monday through Friday and 9:00am and 8:00pm Saturday. In addition, haul hours are limited to the hours between 8:30am and 3:30pm on Saturdays, unless approved in writing in advance by the development services division. Proposed Hauling/Transportation Routes: The site is accessible from the 113th Ave SE & SE 168th Street Measures to be implemented to minimize dust, traffic and transportation impact, erosion, mud, noise and other noxious characteristics: Water Truck, Temporary Erosion Control Plan, BMPs, construction proposed during City of Renton permitted work hours. Any special hours proposed for construction or hauling (i.e. weekends, late nights): No special hours for construction or hauling are anticipated or proposed at this time. Preliminary Traffic Control Plan: Construction signage will place along SE 168 th Street, the construction will conduct onsite, there is no public disturb, therefore no traffic control plan is needed.