Loading...
HomeMy WebLinkAboutCO 09C.O.# 9 SUMMARY OF PROPOSED CHANGE: ITEM Unit Qty. Unit Price Total Price A11 LS 1.00 $4,465.44 $4,465.44 Sub Total (Schedule A) Sales Tax (10.1%)$451.01 $4,916.45 Additional cost (delta) for overhead to cover late change in scope of the last batch of overlay work. Total (Schedule A) CITY OF RENTON Additional Quantities Under This Change Order Public Works Department CONTRACT CHANGE ORDER AGREEMENT CONTRACT: CONTRACTOR: Downtown Utility Improvement Project CAG-21-001 SCI Infrastructure, LLC Provide all labor, equipment, subcontracting, bonding, insurance for the complete work required for the extra work as outlined below: NEW ITEM: $4,465.44 https://cityofrentonwa.sharepoint.com/sites/PW-DUIP/Shared Documents/General/WWP-27-03949 DUIP/10 Construction/10.04 Change Orders/Change Order 9 Rainier Pave/Backup/Backup/CO#9 - DUIP 1 of 2                CAG-21-001, CO #9-22 APPROVAL SIGNATURES: Approved By: Date: Approved By: Date: Approved By: Date: Ronald Straka, Utility Systems Director Approved By: Date: Martin Pastucha, PW Administrator Approved By: Date: Shane Moloney, Renton City Attorney $10,555,986.64 Michael Benoit, Project Manager SCI Infrastructure, LLC, Title ESTIMATED NET CHANGE THIS ORDER $4,916.45 ORIGINAL CONTRACT AMOUNT CURRENT CONTRACT AMOUNT $13,662,947.13 $13,667,863.58 ESTIMATED CONTRACT TOTAL AFTER CHANGE https://cityofrentonwa.sharepoint.com/sites/PW-DUIP/Shared Documents/General/WWP-27-03949 DUIP/10 Construction/10.04 Change Orders/Change Order 9 Rainier Pave/Backup/Backup/CO#9 - DUIP 2 of 2                                7/19/2022Approved by Cheryl Beyer via 7/19/2022 email