HomeMy WebLinkAboutMFP22002859.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22002859
IVR Number: 22002859
Permit Information
Permit Name: Comcast Cable Franchise Permit - JB0000584661
Address/Location:06/01/2022Application Date:1923059043Parcel Number: 401 S GRADY WAY
Permit Type:06/08/2022Issue Date:Franchise
Permit Work Class:06/08/2023Expiration Date:Minor Utility
Job Number: JB0000584661Franchise Type:Cable
Description: REVISION: DIRECTIONAL BORE AND PLACE (2) 2" CONDUITS & PULL (1) HARDLINE COAX THROUGH. PLACE
FLUSH MOUNT VAULT.
Comcast Cannon JB0000584661 Rev 1 TIE INTO EXISTING COAX WITH HARDLINE. UPGRADE EXISTING
PEDESTAL TO DOGHOUSE. PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT. POTHOLE ALL
EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Andrew Parker
comcast
410 Valley Ave NW
Puyallup, WA 98371
B: (253) 864-4249Contact
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Contact
Michael Cannon
Cannon Constructors Inc
406 Porter Way
Milton, WA 98354
B: (253) 922-2787Contractor
Business License Number: 41539Construction Contractor: CANNOCL791JK
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0000584661
Andrew Parker
253-225-0596
andrew_parker2@comcast.com
401 S GRADY WAY, RENTON, WA 98057 DSR - MCDONALDS
TIE INTO EXISTING COAX WITH HARDLINE. UPGRADE EXISING PEDESTAL TO DOGHOUSE.
PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT. DIRECTIONAL BORE.
PLACE (2)-2" CONDUITS & PULL (1) HARDLINE COAX THROUGH. PLACE FLUSH MOUNT VAULT
605
Cannon Construction LLC - David Standring 253-922-2787
601590363 20838
07/18/2022
MFP22002859
Scott Warlick 7/28/2022 POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
DSR MCDONALDS
401 S GRADY WAY RENTON, WA 98057
CANNON CONSTRUCION LLC
Cody Kainoa 253-922-2787 (Ext. 256)
406 PORTER WAY MILTON, WA 98354-9638
TIE INTO EXISTING COAX WITH HARDLINE. UPGRADE EXISTING PEDESTAL TO
DOGHOUSE. PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT
MFP22002859
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 7/28/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
SIDEWALK
ROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROWROWROW ROW ROW ROW ROW ROW ROW ROWROW
311
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPS GRADY
W
A
Y
SIDEWALK
301EOPEOPEOPEOPEOP
EOP
EOP
EOP
DRIVEWAY
SIDEWALK
SIDEWALK
DRIVEWAY
SIDEWALK
SIDEWALK
W20-1
W4-2R
W20-5R
WT
W20-1R2-1
FASSIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform
to the specifications stated in the federal Manual on Uniform Traffic
Control Devices (M.U.T.C.D)
Cities and various municipalities may have also adopted specialized
guidelines for traffic control within their jurisdiction. It is the
responsibility of the on-site traffic control personnel to verify if any
special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
-For aerial work, there will be a moving traffic control setup
-Will coordinate with businesses that will be affected by
construction
-Will have spotter on site to escort pedestrians through
work zone
-All work will stop while pedestrians are escorted through
work zones
-Will have no more than two work areas active at a time
SITE NOTES
-Maintain driveway access at all times
-Place temporary "NO PARKING" signs at least
72 hours prior to work
-Sidewalks to remain open during road work
unless noted otherwiseFLAGGER SPOTTERWT
LEGEND
Work Vehicle Work Area
Flagger Spotter
N
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBCKREV2WKREDESIGN: BORE7/18/22JBREV1WKREDESIGN6/1/22JB0000584661000
2
1
JB
WK
5/9/2022
NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN
MFP22002859
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP375
355
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
EOPEOPEOPEOPEOPEOPEOPEOP
EOPEOPEOPEOPEOPEOP EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPS GRAD
Y
W
A
Y
S GRADY
W
A
Y
S GRADY
W
A
Y LAKE AVE SDRIVEWAYSIDEWALK
SIDEWALK
SIDEWAL
K
SIDEWALK
SIDEWALK
W20-1
W4-2R
W20-5R
W20-1
R2-1
FASWT
401
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform
to the specifications stated in the federal Manual on Uniform Traffic
Control Devices (M.U.T.C.D)
Cities and various municipalities may have also adopted specialized
guidelines for traffic control within their jurisdiction. It is the
responsibility of the on-site traffic control personnel to verify if any
special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
-For aerial work, there will be a moving traffic control setup
-Will coordinate with businesses that will be affected by
construction
-Will have spotter on site to escort pedestrians through
work zone
-All work will stop while pedestrians are escorted through
work zones
-Will have no more than two work areas active at a time
SITE NOTES
-Maintain driveway access at all times
-Place temporary "NO PARKING" signs at least
72 hours prior to work
-Sidewalks to remain open during road work
unless noted otherwiseFLAGGER SPOTTERWT
LEGEND
Work Vehicle Work Area
Flagger Spotter
N
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP SMBCKREV2WKREDESIGN: BORE7/18/22JBREV1WKREDESIGN6/1/22JB0000584661000
2
2
JB
WK
5/9/2022
NTSRENTON, WA 98057401 S GRADY WAY DSR - MCDONALDS17-050
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTIONCONTROL TYPE:[UNDERGROUND WORK]SINGLE CLOSURE 6-LANE ROADSITE SPECIFIC TRAFFIC CONTROL PLAN
MFP22002859
SHEET INDEX:
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4-5 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES
HARDLINE COAX: 605 FT + 20% STORAGE = 726 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
- TIE INTO EXISTING COAX WITH HARDLINE
- UPGRADE EXISTING PEDESTAL TO DOGHOUSE
- PROOF & PULL (1) HARDLINE COAX THROUGH EXISTING CONDUIT
- DIRECTIONAL BORE. PLACE (2) 2" CONDUITS & PULL (1) HARDLINE
COAX THROUGH
- PLACE NEW FLUSH MOUNT VAULT
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (0)=
TOTAL ROW FOOTAGE =
0 FT.
0 FT.
180 FT.
425 FT.
0 FT.
605 FT.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
401 S GRADY WAY
RENTON, WA 98057DSR - MCDONALDS
JB0000584661
SMB
CANNON COMPANIES
Cody Kainoa - (253)-922-2787 - ckainoa@teamcannon.com
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE =605 FT.
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION = 0
DISTRIBUTION = 0
0
0
0
PAGE 4 PAGE 5
MFP22002859
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKJBNTS00025REV1 6/1/22 REDESIGN WK JB
REV2 7/18/22 REDESIGN: BORE WK CK
LEGENDEDGE OF PAVEMENTFOGLINEPOWERCOMMUNICATIONSEWERDRAINDRAINAGE DITCHGASWATERTRAFFIC SIGNALTELCOMSTEAMUNKNOWN UTILITYRIGHT OF WAYTRAFFIC CONESPROPOSED NEW BORESTRAW WATTLESPLTCWRUTILITY POLEVAULT - SMALLPEDESTALSTREET LIGHTCROSSWALK LIGHTUTILITY RISERVVAULT - SMALL444LA MANHOLEVAULT - 25TACATCH BASINCATCH BASIN WITH SOCKGLULAM UTILITY POLECENTER LINELANE LINEFENCEHIGH VISIBILITY FENCE SSEWER MANHOLEDDRAIN MANHOLEWWATER MANHOLEVUTILITY VALVESHRUBBERYBORE PITVAULT - LARGEVAULT - 25TACCOMMUNICATION MANHOLEFIRE HYDRANTDISTANCE STATIONSTA 0+00CONSTRUCTION NOTE CALLOUT#X.XDISTANCE DIMENSIONASPHALTCONCRETEHFH-FRAMEVAULT - LARGECABCABINETLEGENDLANE DIRECTION INDICATORPROPOSEDMARK-UP NOTATIONSRESTORATION TYPESEXISTING FEATURESLINE TYPESA7GRASSCROSS SECTION SYMBOLCROSS SECTION IDCROSS SECTION PAGEFLFLPPTSTSCCDDDDDDDDDDDDGGWWTTSTSTROWROWSUKCBCBPPVVVVVVPROPOSED WORK1LOCATIONPHOTO NOTE CALLOUT#PHOTO LOCATOR SYMBOLPROPOSED NEW TRENCHEXISTING UNDERGROUND PATHWAYPROPOSED NEW AERIAL STRANDEXISTING AERIAL PATHWAYEXISTING SPLICE CASEPROPOSED SPLICE CASEEXISTING FIBER/COAX STORAGEPROPOSED FIBER/COAX STORAGETREEEOPVVAULT - SMALL444LA MANHOLEVAULT - 25TAVAULT - LARGEEXISTING - CONTINUED233LA MANHOLE233LA MANHOLELANDSCAPEMFP22002859
OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKJBNTS00035REV1 6/1/22 REDESIGN WK JB
REV2 7/18/22 REDESIGN: BORE WK CKGENERAL NOTESMFP22002859All new conduit in the ROW shallbe schedule 80 or equivalent
SIDEWALKEOPEOPEOPEOPEOPEOP355311ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWEOP
EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOPS GRADY WAYS GRADY WAYL
A
K
E
A
V
E
SDRIVEWAY
SIDEWALKSIDEWALK
SIDEWALKSIDEWALK 200301V425'32DRIVEWAY SIDEWALKSIDEWALKGRASSLANDSCAPING15'5'1R1CONSTRUCTION NOTES:TIE INTO EXISTING COAX WITH HARDLINEUPGRADE EXISTING PEDESTAL TO DOGHOUSEPROOF & PULL (1) HARDLINE COAX THROUGHEXISTING CONDUITMATCH LINESEE SHEET 531RESTORATION NOTES:RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONS2RESTORATION LEGEND:= ASPHALT= CONCRETE= GRASS=LANDSCAPEOFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKJB1" = 30'015'30'45REV1 6/1/22 REDESIGN WK JB
REV2 7/18/22 REDESIGN: BORE WK CK
DESIGNNMFP22002859
SIDEWALKSTA 10+00EOPEOPEOPEOPEOP
EOP EOPEOPEOPEOPEOPEOPEOP375401S GRADY WAYROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWP
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PP
P
P
P
PP
P
P
P
P
PP
P
P
P
P
P
PPP
P
P
P
P
PP
P
P
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
PPP
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
PPP
P
P
P
P
PP
P
P
P
P
P
PP
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
P
PP
P
P
P
P
PPP
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
P
P
P
PP
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
PPP
P
P
P
P
P
PPP
P
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
P
P
P
PPP
P
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
P
P
P
P
PP
P
P
P
P
P
PPP
P
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
P
P
P
PPP
P
P
P
P
P
PP
P
P
PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP EOPEOPEOPEOPEOPEOPEOPEOPS GRADY WAYVSIDEWALK SIDEWALK
DRIVEWAYCBCBCB
D
D
D
D
D
D
D
D
D
D
D
DD
D
DD
D
D
D
D
D
D
D
D
D
D
D
D
D
D
DD
D
DD
D
D
D
D
D
D
D
D
D
D
DDD
D
D
D
D
DD
D
D
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
DD
CBW
WW
W
WW
W
WW
W
WW
W
W
W
W
DDDDDDDDDDDDDDDDDDDDDDDD PPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPPP
P
P
P
P
P
P
P
P
P
PP
P
P
PP
P
P
P
P
P
P
P
P
P
PP
P
P
PP
P
P
PP
P
P
P
P
P
PP
P
P
PP
P
P
P
P
P
P
P
PP
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
P
PP
P
P
P
P
P
PP
P
P
P
P
P
PPP
P
P
P
P
P
P
P
P
WPPPPPP
PP P P
PP P PPV1'5'4'5'BOREPITBOREPIT180' BORE4'5'1'1'1R1R21R1RESTORATION LEGEND:= ASPHALT= CONCRETE= GRASS=LANDSCAPEMATCH LINE SEE SHEET 4 STATION STARTSTATIONING STARTS AT 10+00 AT THEINTERSECTION OF SHATTUCK AVE S & S GRADY WAYPROPOSED PATH DISCLAIMERS1.PROPOSED PATH MAY CHANGE AT TIME OFCONSTRUCTION DUE TO UTILITY LOCATIONSAND INSPECTOR REQUIREMENTS2.UNKNOWN UTILITY DEPTHS TO BE VERIFIED INFIELD DURING TIME OF CONSTRUCTIONUTILITY DISCLAIMERALL LOCATIONS OF UTILITIES SHOWN AREAPPROXIMATE. LOCATION OF ALL UTILITIES TO BEVERIFIED PRIOR TO CONSTRUCTION. CALL UTILITYUNDERGROUND LOCATION CENTER AT1-800-424-555521CSWPP LEGENDNATIVE TRENCH MATERIAL SHALL BE COVER WITHPROTECTIVE TARP AND SECURED WITH SANDBAGSTO PREVENT RAIN WATER ABSORPTION.CATCH BASIN WITH SOCKCBCONSTRUCTION NOTES:DIRECTIONAL BORE. PLACE (2) 2" CONDUITS & PULL (1)HARDLINE COAX THROUGHPLACE NEW FLUSH MOUNT VAULTDRAINAGE SYSTEM DISCLAIMEREXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THECONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM AREIMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BERESTORED TO THE ORIGINAL CONDITIONS.1RRESTORATION NOTES:RESTORE LANDSCAPE PER CITY OF RENTONSPECIFICATIONSSTA 10+50STA 11+00STA 11+50STA 12+00STA 12+50STA 13+00STA 11+57STA 12+87STA 13+38OFAPPROVED BY:PROJECT CODE:DRAWN BY:DATE:SCALE:PROJECT REVISIONS
REV DESCRIPTION OF CHANGEDATE BY QC JB0000584661
DSR MCDONALDS
401 S GRADY WAY
RENTON, WA 98057
SMB17-0505/9/2022WKJB1" = 30'015'30'55REV1 6/1/22 REDESIGN WK JB
REV2 7/18/22 REDESIGN: BORE WK CK
DESIGNNMFP22002859