Loading...
HomeMy WebLinkAboutPN_Southport_West_Project_Narrative_220712_v1 1133 LAKE WASHINGTON BLVD. N  SUITE 90  RENTON  WASHINGTON  98056 TEL: 425/282-5833  FAX: 425/282-5838 Southport West – Project Narrative “Southport West” is the completion of the southerly portion of the Southport Development. This expansion will be the first impression of this important northern gateway to Renton, and to Southport, and will contribute to the high- quality campus offering architecturally attractive buildings serving the Renton Community, companies, and visitors. This next phase creates a vibrant work, shop, and recreational hub. Visually attractive offices, retail space, and curated landscaping will call attention to a quality development. Southport West will bring in new and diverse job opportunities to the Renton area by attracting global high tech and bio-tech companies, in an already established development served by state-of-the-art infrastructure. The development will add five high mid-rise buildings, with careful attention to the “Gateway” location, with the architecture responding to its surroundings. The density will remain similar to what was built in Southport thus far. It will be built as approximately 1,250,000 GSF of development over 7.75 acres, as compared to the density in Bellevue or Seattle which would be 250,000 SF in ¼ acre, or roughly eight times the density. The Expansion will be built at the same height and scale as the existing offices, for aesthetic cohesion, thereby adding to the Campus feel. SECO has engaged the renowned architecture firm ZGF to create high quality, architecturally attractive, and distinct class A office buildings with pedestrian friendly retail at the base. The materials utilized are a combination of curtain wall, stone, concrete, and steel that creates a high-quality timeless palette. SECO has also hired the original Southport landscaping designers to continue the same spacious landscaping style implemented on the southerly phase of the existing offices, allowing light and air between buildings, and weaving the offices with carefully designed northwest gardens and pathways. It is our belief that the open space, circulation, and special landscaping will be a strong attraction for this location for tenants. Southport West’s Park Avenue extension will greatly enhance the access leading to I-405, while giving visibility to the complete development from I-405. We will add a third lane, named “Center Road” between the phase-one offices and phase-two offices, which will greatly improve visitor circulation and provide a strong purposeful axis. SECO will also add the new “Frontage Road” to the South, north of the railroad tracks, which will create a strong east west connection to visitors, as well as adding and enhancing pedestrian and vehicular access to the Landing and the Park, an entrance that faces challenges as it exists today. From the beginning, Southport was designed to create a unique, walkable community with housing, offices, retail, hospitality, and entertainment, all easily accessed from within the Renton Community, as well as by its visitors. This next phase will expand on that vision as well as create greater accessibility to the Lake Washington waterfront for the community and visitors. The site is immediately south of first phase of Southport and is bounded on the north by the offices and residential buildings at Southport, on the south by the BNSF Railroad right-of-way, on the west by Boeing Renton, and on the east by Coulon Park. The site is devoid of trees and vegetation for the construction footprint. Existing vegetation is limited to the extreme edges of the project area. This includes prior mitigation plantings immediately adjacent to the recently installed Johns Creek culvert under the Southport Access Road. South of this area, the immediate Johns Creek stream corridor is vegetated primarily with invasive Himalayan blackberry, while the northern project area boundary is vegetated with a row of closely planted conifer trees. Trees are limited to the conifers. There are no landmark trees rooted within the project area. Washington State Department of Fish and Wildlife Priority Habitat and Species List does not list any threatened or endangered species within the project area. The proposed Southport West Expansion will encompass site improvements of the entire site including landscape, civil site improvements, roads, and infrastructure to support both the new and existing Southport developments – with sustainability strategies on the forefront. SECO and its Neighbors – SECO and PSE have constructively worked together for nearly 2 decades, since SECO first purchased 17.5 acres from PSE in 1999. Since then, SECO has bought an additional 8.5 acres in 2020. We remain on good terms with them, housing their operations from 2020-2022, and are in the process of buying additional land for the building of a center lane on their northerly border, which is adjacent to our existing parking garage. We are also hiring PSE to do the analysis of the relocation of the powerlines and switchgear as warranted by the development. SECO will work closely with PSE for the engineering and capacity needs of the development, and the utility switchgear adjacent to Johns’ Creek. We have included an executed version of an Engineering agreement (Addendum A dated 06.20.2022) with PSE which witnesses their knowledge of this upcoming development. SECO has been in constant communication with PSE and will continue to partner with PSE on design and construction. Boeing and SECO have coexisted without friction for more than 2 decades concurrently. SECO has provided Boeing with housing, hospitality, meeting rooms, restaurants, pedestrian access to the waterfront, and the access to its workers along our waterfront to reach Gene Coulon Park in the easement we granted the public in 2000. We are not asking for any exceptions to the code and are building assets that will be a benefit to all our neighbors. The new development is a win-win in terms of current and future needs, while placing City of Renton as a commercial hub with more sure-footedness than ever before. SECO and the City of Renton have envisioned this last phase and completion of the Southport and PSE redevelopment for 20 years. This shared vision will create a cohesive live, work, play and stay community, that helps to diversify the job opportunities in Renton for the residents, builds tax and revenue opportunities for the city, is open and accessible to the public and exemplifies the best architecture, environmental sensitivity, and high-quality open spaces to showcase this special north Renton “Urban Center” neighborhood. An example of which is the work by the City of Renton and SECO to connect Park Avenue to Southport to the important access corridor from 1-405 and locations to the South the further enhance the circulation. GSF and Parking – SECO would like to submit with a GSF range in mind to avoid rectifying the metric down the road. Accordingly, we would like to submit for a range of 1.25M to 1.6M GSF, although 1.25M is stipulated for now, and as the design team works through warranted efficiencies on floor plates and core design. SECO will update the city on changes as they surface. A development of this magnitude needs a thoughtful approach on Parking. The design team is aware of the Parking ratios per RMC. Current Parking layout suggests about 2,260 stalls approximately for the 5-Tower development, inclusive of on-street parking spaces. We anticipate working though a Parking Modification for an amicable solution for Southport West - A parking plan will be in place for the entire Southport site to utilize shared parking opportunities and shifts as well as shuttles, ride- shares, Uber, etc. Please note: Project Narrative Metrics per MSPR submittal requirements follow on ZGF Letterhead PORTLAND SEATTLE LOS ANGELES WASHINGTON DC NEW YORK VANCOUVER BC ______ PARTNERS Braulio Baptista AIA Kathy Shaloo Berg AIA, LEED AP BD+C Patrick Cotter ARCHITECT AIBC, AAA, OAA, SAA, INT’L ASSOC. AIA Mark Foster AIA Toby Hasselgren AIA Ted Hyman FAIA, LEED AP BD+C R. Doss Mabe FAIA Mitra Memari AIA, LEED AP BD+C Solvei Neiger AIA, ACHA Victoria Nichols AIA, LEED AP Robert Packard III ASSOCIATE AIA Vladimir Pajkic AIA, LEED AP Eugene Sandoval AIA Karl Sonnenberg AIA, ACHA Allyn Stellmacher AIA, LEED AP Todd Stine AIA, DBIA, LEED AP BD+C Sharron van der Meulen Jan Carl Willemse FAIA, DBIA, LEED AP Tim Williams AIA, LEED AP BD+C James Woolum AIA, IIDA PRINCIPALS Barbara Anderson RN, BSN, MSN Heidi Bullinga AIA, LEED AP Josie Briggs Ryan Cheng Mahon Clements AIA, LEED AP Marc Davies Kate Freels AIA, LEED GA Mark Gesinger LEED AP Patrick Gordon AIA Elizabeth Grace AIA James Harman AIA Sara Howell AIA Corinne Kerr AIA Eddie Kung AIA, LEED AP BD+C Bertha Martinez RA Leslie Morison ASSOC. AIA, NAIOP Craig Rizzo Eric Ritchey AIA Haruka Saito AIA Monica Schaffer Kim Scott NCIDQ, IIDA Dan Simpson Taka Soga Mike Steinberg Tobin Thompson Kari Thorsen NCIDQ, LEED AP Jerome Unterreiner Rebecca Vargas AIA Erin Ward AIA, NCARB Camilla Watson NCIDQ Hans Woestenborg AIA, CDT, LEED AP BD+C ZGF ARCHITECTS LLP 925 Fourth Avenue Suite 2400 Seattle, WA 98104 T 206 623 9414 www.zgf.com June 24, 2022 To whom it may concern: Please find below narrative to describe the proposed development for SECO Southport West Project. Project Narrative: The project size is expected to encompass parcels · #0823059191, at 336,992 square feet and, · Current Utility PSE Location - #0823059178, at 102,578 square feet. Address = 1095 Lake Washington BLVD, N 98056 · Total parcel areas = 439,570 square feet. Zoning Designation: · UC-2, Urban Center 2 Current Site Use: · Utility function / Vacant Site Features: · John’s Creek at Southeast portion of the site area has a wetland designation. Please refer to submitted Wetland Assessment and Critical Areas Report. · For soil type and drainage conditions, please refer to civil documents, and Geotech report. Further refer to letter of understanding – Geological Risk. Proposed Use: · 1,250,000 square feet of gross building area over (5) high-rise buildings, developed to include primarily office function with retail and landscape improvements. · Additionally, an allotment for 130,000 square feet of gross building area for office and retail at the SW corner of the development (Tower #6) Height Limitations: · Towers will not exceed the height established by neighboring Southport Office Towers to the direct north, and conform to RMC 4-2-120A for no greater than 10 stories. The buildings will comply with RMC 4-3-020.F airport influence map, safety compatibility zone sector 6 for “Traffic Pattern Zone” and further RMC 4-3-020.G, Federal aviation regulation part 77 Objects Affections Navigable Airspace. Lot Coverage: · Building coverage = 251,420 square feet · Total Road coverage = 64,540 square feet · Lot coverage for buildings = 251,420 / 439,570 = 57%, which is below 100% as allowed by RMC 4-2-120A when parking is provided through a parking garage. · Each future Site plan permit will submit in relation to lot coverage as the phasing of the project is further defined. Parking: · Parking will be provided through an on-site parking garage and an off-site allotment as approved by the City of Renton through compliance to RNC 4-4-080.E. · All parking to be compliant with Renton Municipal Code Section 4-4-808 Parking, Loading and Driveway Regulations. · Parking stalls sizes and types will conform to RMC 4-4-080-F.8 · Parking stalls required per RMC 4-4-080-F.10 are estimated using ratios of 2 stalls /1,000 square feet minimum at office spaces and 10 stalls / 1,000 square feet minimum at retail spaces. · Office stalls required are estimated to be 2,400 stalls minimum · Retails stalls required are estimated to be 500 stalls minimum. · Total stalls required to be at least 2,900 stalls. · Accessible Stalls – stall counts over 1,000 in total shall provide 20 spaces plus 1 for every 100 or fraction thereof. This is 20+(2,900-1000)/100 = 20+19 = 39 accessible stalls minimum. · Bicycle parking per RMC 4-4-080-F.11, bicycle parking at a minimum of 10 percent of total vehicular parking stalls = 2,900 * 10% = 290 bicycle parking stalls minimum. · Alternative compliance path to provide parking required will be employed per RMC 4-4-080-F.10.b, a joint parking agreement will be utilized to provide compliance to parking requirements. · Compact stalls will not exceed 50% of total parking stalls. Sincerely, Michael Tetzloff Project Architect ZGF Architects LLP