HomeMy WebLinkAboutMFP22003453.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP22003453
IVR Number: 22003453
Permit Information
Permit Name: Comcast Cable Franchise Permit JB0001050901
Address/Location:07/01/2022Application Date:1723059069Parcel Number: 625 WILLIAMS AVE S
Permit Type:08/03/2022Issue Date:Franchise
Permit Work Class:08/03/2023Expiration Date:Major Utility
Job Number: 1050901Franchise Type:Cable
Description: Comcast Cannon JB0001050901. PROOF AND PULL FIBER THROUGH (1) 4" CONTRACTOR PLACED CONDUIT.
INSTALL (1) NEW 4" RISER. PULL FIBER. PLACE (2) NEW PEDS. PROOF AND PULL FIBER THORUGH
CONTRACTOR PLACED 4" CONDUIT. PLACE NEW 36X30 VAULT. INSTALL (2) NEW 4" RISERS. PULL FIBER.
RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Applicant
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Contact
Annie Robertson
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
Electrical Contractor: CANNOCI873CL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0001050901
Andrew Parker
253-225-0596
andrew_parker2@comcast.com
625 WILLIAMS AVE S RENTON, WA 98057 WATERSHED RENTON RELOCATION
PROOF AND PULL FIBER THROUGH (1) 4" CONTRACTOR PLACED CONDUIT. INSTALL (1) NEW 4" RISER. PULL IFBER.
PLACE (2) NEW PEDS. PROOF AND PULL FIBER THROUGH CONTRACTOR PLACED 4" CONDUIT. PLACE NEW 36X30 VAULT.
INSTALL (2) NEW 4" RISERS. PULL FIBER.
1019
Cannon Construction LLC - David Standring 253-922-2787
601590363 20838
07/01/2022
MFP22003453
Scott Warlick 8/3/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
JB0001050901
625 WILLIAMS AVE S RENTON, WA 98057
Cannon
Andrew Parker 253-225-0596
410 Valley Ave NW, Suite 12, Bldg C Puyallup
PROOF AND PULL FIBER THROUGH (1) 4" CONTRACTOR PACED CONDUIT. INSTALL (1) NEW 4" RISER. PULL FIBER. PLACE (2) NEW PEDS.
PROOF AND PULL FIBER THROUGH CONTRACTOR PLACED 4" CONDUIT. PACE NEW 36X30 VAULT. INSTALL (2) NEW 4" RISERS. PULL FIBER.
MFP22003453
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 8/3/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
David Standring, Permitting Coordinator
07/01/2022
629
619618
601
605
900
540
601
617
541
615
633
621
602600
611
620
800
0
800
0 0
0
0 0
800
901BURNETT AVE SS GR
A
D
Y
W
AY
S GR
A
D
Y
W
A
Y
S 7TH STS 7TH ST
TALBOT
RD
SWILLIAMS AVE SS 6TH ST
EOPEOP EOP EOP
EOP EOPEOPEOPEOPEOPEOPEOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP EOP EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOPROWROWROWROWROW
ROW
ROW
ROW
ROW
ROW ROWROW
ROW
ROW
ROWROWROWROW
ROW
ROW ROWROWROW
ROWROWROWROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWWTXXXXWT
WT
WT LLXXXXL
X
XX
XF
A
S
OK R3-6R
OK R3-6R
SIGN TO BE PLACED AT
ADJACENT
INTERSECTION S 5TH
ST & WILLIAMS AVE S.
WT
X
R9-936" x 24"
BARRICADE LENGTH
EQUAL TO FULLWIDTH OF SIDEWALK
FLASHING LIGHT FORNIGHT TIME CLOSURE
CLOSEDSIDEWALK
FAS FASOK R3-6R
POLICEOFFICER
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCTCP FORCED RELOCATESJB0001050901000
1
1
GW
AM
6/28/2022
NTSRENTON, WA 98057625 WILLIAMS AVE SRENTON WATERSHED RELOCATIONCODE
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANEWIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conformto the specifications stated in the federal Manual on Uniform Traffic
Control Devices (M.U.T.C.D)
Cities and various municipalities may have also adopted specializedguidelines for traffic control within their jurisdiction. It is the
responsibility of the on-site traffic control personnel to verify if any
special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
-Will coordinate with any businesses that will be affectedby construction-Will have spotter on site to escort pedestrians throughwork zone
-All work will stop while pedestrians are escorted through
work zones
-Will have no more than two work areas active at a time
FLAGGERSPOTTERWT
LEGEND
Work Vehicle Work Area
Flagger Spotter
N
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTIONTRAFFIC CONTROL PLAN
R2-1
R2-1
R2-1 PEDESTRIAN ESCORT:
STOP WORK, SECURE
PASSABLE ADA COMPLIANT
PEDESTRIAN ACCESS ON
EXISTING SIDEWALK (4' MIN).
CLEAR ZONE MUST BE FREE
OF OVERHEAD HAZARDS
WHEN PEDESTRIANS ARE
MOVING THROUGH THE
WORK ZONE.
STORMWATER FACILITY, SEE CIVIL.
PROPER
T
Y
L
I
N
E
6' HT. OPAQUE WOOD FENCE ALONG
NORTH PROPERTY LINE
OVERHANG TYP., SEE ARCH.
FIRE HYDRANT, SEE CIVIL
HYDRANT, SEE CIVIL
GRASSCRETE PAVING,
TYP. SEE CIVIL.
TURF BETWEEN LINEAR PAVERS
LENG
T
H (
N
O
T I
N
CL
U
DI
N
G
D
RI
V
E
W
A
Y )
=
15
5'-
0".
P
E
R
R
M
C 4-
4-
0
70 (
F)(
2)
STR
E
E
T
T
R
E
E
S
R
E
Q
UI
R
E
D: 15
5'-
0"/
40'
S
P
A
CI
N
G
=
4.
S
T
R
E
E
T
T
R
E
E
S
PRO
VI
D
E
D:
3,
D
U
E
T
O
B
U
S
S
T
O
P
L
O
C
A
TI
O
N.LENGTH (NOT INCLUDING DRIVEWAY AND ACCOUNTING FOR CURB BULB)=140'. PER RMC 4-4-070 (F)(2) STREET TREES REQUIRED: 160'/ 40' SPACING = 4STREET TREES PROVIDED: 3, DUE TO LIGHT AND UTILIY CONFLICTS.LENGTH= 250'-6 3/8". FENCE AND ENHANCED VEGETATION APPLIE
D
P
E
R
C
I
T
Y
C
O
M
M
E
N
T
S
.
T
R
E
E
S
P
R
O
V
I
D
E
D
=
1
4
.
S
H
R
U
B
S
P
R
O
V
I
D
E
D
=
3
1
SLOPE PREVENTS CONIFER
PLACEMENT, LARGE SHRUBS
PROVIDE COVERAGE.
35'-0"
ENHANCED VEGETATION
PROVIDED PER CITY
COMMENTS
PARCEL A
PARCEL B
PARCEL C
PARCEL D
WHOLESALE FISH & PET
APN 182305-9046
EG: 31.38
EG: 31.42
EG: 31.32
EG: 30.97
EG: 30.73
EG: 30.63
EG: 30.56
UP
UP
LF1
LF2LF2 LF2
LF2
LF2
LF1LF1LF1LF1LF1LF1LF1LF1
LF1
LF1
LF1
LF1
LF1
LF1
LF1
LF1
LF1
EXISTING
LIGHT POST
BOLLARDS, TYP.
SEE ARCH.
ENLARGEMENTA
L4.0
40'-0"
LIGHT POST,
TYP.
PROPERTY LINE
BUS STOP, SEE CIVIL
CITY OF
RENTON
IN COMPLIANCE WITH CITY OF RENTON STANDARDSTED-40-4200WATERSHED APARTMENTS
CIVIL CONSTRUCTION PERMITWATERSHED APARTMENTSR-4200
Civil Engineers
Structural Engineers
Landscape Architects
Community Planners
Land Surveyors
Neighbors
T A C O M A
2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422 TEL
S E A T T L E
1200 Sixth Avenue, Suite 1620, Seattle, WA 98101 206.267.2425 TEL
Know what's below.
before you dig.Call
R C21005115 LUA21-000239PR21-000258GRAPHIC SCALE
0 20 40 FEET
1" = 20 FEET
10
NEW BUILDING WILLIAMS AVE S1.SUBGRADE TO BE SCARIFIED TO A DEPTH OF 12” AND
TOPSOIL PLACED IN LIFTS OF UP TO 6” DEPTH. FIRST
LIFT TO BE MIXED INTO SUBGRADE.
2.TOPSOIL TO BE ONE OF THE FOLLOWING:
2.1.CEDAR GROVE 3-WAY TOPSOIL MIX
2.2.STOCKPILED EXISTING TOPSOIL AMENDED
BASED ON SOIL TEST REPORT
RECOMMENDATIONS TO A SANDY LOAM
2.3.APPROVED ALTERNATE IMPORTED TOPSOIL MIX
3.ALL TOPSOIL TO BE AMENDED WITH 4” OF COMPOST.
4.FOR AREAS WITHIN 5' OF A TREE, PLACE TOPSOIL TO
A 24” DEPTH.
5.FOR OTHER LANDSCAPE AREAS, PLACE TOPSOIL TO
AN 8” DEPTH. PUBLIC
PROMENADE
LEGEND
EXISTING TREES
5/8" CRUSHED ROCK
MAINTENANCE STRIP
GRASSCRETE
PAVING, SEE CIVIL
S GR
A
D
Y
W
A
Y
8
'
-
0
"
EXISTING
BUILDING
EXISTING BUILDING
NOTES
1.STREET TREES TO BE TRIMMED UP TO A
HEIGHT OF 8' WHERE BRANCHES EXTEND OVER
PAVED AREAS.
2.SEE SHEET L0.1 FOR TREE RETENTION PLAN
3.SEE SHEETS L1.0-L1.3 FOR MATERIALS PLANS
AND DETAILS
4.SEE SHEETS L4.0 - L.4.2 FOR IRRIGATION
SOIL NOTES
TREES CODE BOTANICAL NAME COMMON NAME SIZE QTY
AC2 ACER CIRCINATUM VINE MAPLE 6` HT, MULTI TRUNK 8
KP KOELREUTERIA PANICULATA GOLDEN RAIN TREE 2" CAL 6
LR LIQUIDAMBAR STYRACIFLUA `ROTUNDILOBA` TM ROUND-LOBED SWEET GUM 2" CAL 11
SD SORBUS AMERICANA 'DWARFCROWN' TM RED CASCADE MOUNTAIN ASH 2" CAL 6
TG THUJA PLICATA `GREEN GIANT`WESTERN RED CEDAR 6` HT 10
SHRUBS CODE BOTANICAL NAME COMMON NAME CONT QTY
CP CALLICARPA BODINIERI `PROFUSION`PROFUSION BEAUTYBERRY 5 GAL 16
FJ FATSIA JAPONICA JAPANESE FATSIA 5 GAL 10
HW HYDRANGEA QUERCIFOLIA `PEE WEE`PEE WEE OAKLEAF HYDRANGEA 2 GAL 18
KJ KERRIA JAPONICA JAPANESE KERRIA 5 GAL 20
LS LAVANDULA STOECHAS `SILVER ANOUK`SPANISH LAVENDER 2 GAL 16
PA PEROVSKIA ATRIPLICIFOLIA RUSSIAN SAGE 2 GAL 6
SR SARCOCOCCA RUSCIFOLIA FRAGRANT SARCOCOCCA 3 GAL 15
SB SPIRAEA BETULIFOLIA BIRCH LEAF SPIREA 2 GAL 63
GROUND COVERS CODE BOTANICAL NAME COMMON NAME CONT SPACING QTY
GROUNDCOVER MIX 3,211 SF
AV ARCTOSTAPHYLOS UVA-URSI `VANCOUVER JADE`VANCOUVER JADE KINNIKINNICK 1 GAL 50% @ 24" o.c.418
FL FRAGARIA CHILOENSIS `LIPSTICK`BEACH STRAWBERRY 1 GAL 50% @ 24" o.c.418
CC CEANOTHUS X `CENTENNIAL`CENTENNIAL WILD LILAC 2 GAL 36" o.c.48
DT DESCHAMPSIA CESPITOSA TUFTED HAIR GRASS 1 GAL 24" o.c.197
GB GERANIUM MACRORRHIZUM BIGROOT GERANIUM 1 GAL 18" o.c.12
HX HELLEBORUS X BALLARDIAE `HGC MERLIN` TM HGC MERLIN LENTEN ROSE 1 GAL 18" o.c.164
LB LIRIOPE MUSCARI `BIG BLUE`BIG BLUE LILYTURF 1 GAL 18" o.c.330
LP2 LONICERA PILEATA PRIVET HONEYSUCKLE 2 GAL 24" o.c.148
LAWN CODE BOTANICAL NAME COMMON NAME CONT SPACING QTY
LS2 COUNTRY GREEN PERFECT BLEND TURF MIX SOD 1,383 SF
PLANT SCHEDULE GROUND LEVEL
PLANTING PLAN AT GRADE
R-420029
REPAIR AREAS DISTURBED BY
CONSTRUCTION TO EX
CONDITIONS OR BETTER, TYP.
COORDINATE WITH
PROPERTY OWNER.
CODE CALCULATIONS
RENTON MUNICIPAL CODE REGULATION TREES TO BE REMOVED REQUIRED REPLACEMENT PROVIDED REPLACEMENT
TREE REMOVAL (4-4-130 C. 9)
NO REPLACEMENT REQUIRED
FOR UP TO (6) SIGNIFICANT TREES
IN LOTS 20,001 SF OR GREATER.
1 SIGNIFICANT TREE TO
BE REMOVED.
ARBORIST REPORT (BARTLETT URBAN FORESTRY
SERVICES, JULY 1, 2020) INDICATES SIGNIFICANT TREE
TO BE REMOVED.
REPLACEMENT PROVIDED
PER RMC 4-4-130 H.1.e.i.
TREE RETENTION (4-4-130
H.1.(a)(iii))
10% MIN OF SIGNIFICANT TREES
SHALL BE RETAINED IN
COMMERCIAL ZONE
4 LANDMARK TREES TO
BE REMOVED.
ARBORIST REPORT (BARTLETT URBAN FORESTRY
SERVICES, JULY 1, 2020) INDICATES LANDMARK TREES
TO BE REMOVED.
REPLACEMENT PROVIDED
PER RMC 4-4-130 H.1.e.i.
TREE REPLACEMENT (4-4-130
H.1.e.i.)
WHEN REQUIRED TREES CANNOT
BE RETAINED, REPLACEMENT
TREES MUST BE 2" CAL MIN OR 6'
HT CONIFER AT RATE OF 12 CAL
IN. FOR EACH REMOVED. UP TO
50% OF REQUIRED TREES MAY
CONTRIBUTE TO REPLACEMENT.
6 TREES TO BE
REMOVED
5 SIGNIFICANT TREES REMOVED X 12 REPLACEMENT
CAL. INCHES PER TREE = 60 CAL. INCHES
(17) 2" CAL. TREES + (10) 6'
HT CONIFERS (ASSUMING
1.5" CAL) + (8) 6' HT
MULTI-STEMMED TREES
(ASSUMING 1.5" CAL) + ((6)
2" CAL. STREET TREES X
50% REQUIRED TREE
COUNT LIMIT) = 67 CAL.
INCHES
05/12/2022R-420031
40
New comcast
vault
New comcast
vault
Follow PSE path
to new pole
Follow PSE path
to new poles streetlight pad is
3'x7', and will abut
new sidewalk.
SHEET INDEX:
1 - COVER SHEET
2 -LEGEND
3 -GENERAL NOTES
4-6 -DESIGN
THIS IS PROPRIETARY INFORMATION AND NOT MEANT FOR GENERAL PUBLICATION. ALL RIGHTS RESERVED BY CANNON COMPANIES
96 CT FIBER: 887 FT + 20% STORAGE = 1065 FT
CONTACTS:
PROJECT MAP:
*ALL FOOTAGES AND MATERIALS ARE ESTIMATED
N
SCOPE OF WORK:
-PROOF AND PULL FIBER THROUGH (1) 4"
CONTRACTOR PLACED CONDUIT.
-INSTALL (1) NEW 4" RISER AT EACH POLE. PULL
FIBER.
-PLACE (2) NEW PEDS.
-PROOF AND PULL FIBER THORUGH CONTRACTOR
PLACED 4" CONDUIT.
-PLACE NEW 36X30 VAULT.
BILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER (3)=
TOTAL ROW FOOTAGE =
0 FT.
0 FT.
0 FT.
887 FT.
75 FT.
962 FT.
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
COMCAST
625 WILLIAMS AVE S
RENTON, WA 98057WATERSHED RENTON RELOCATION
JB0001050901
FORCED RELOCATES
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
0 FT.
0 FT.
0 FT.
0 FT.
0 FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE =962 FT.
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION = 0
DISTRIBUTION = 0
3
0
0
POC:
Taylor Galbraith
(Cell): (206) 445.9015
(Email): taylorg@sierraind.com
CANNON COMPANIES:
Chris White
(Cell): (253) 348.9733
(Email): cwhite@teamcannon.com
4
5
6
This permit is for Major construction work in the ROW and will be billed at an additional
$150/HR for inspections. After hours and weekend work will be billed at $175/HR
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001050901RENTON WATERSHED RELOCATION625 WILLIAMS AVE SRENTON, WA 98057FORCED RELOCATES17-050
6/28/2022
AM
GW
NTS
0 0 0
2
5
LEGEND
EDGE OF PAVEMENT
FOGLINE
POWER
COMMUNICATION
SEWER
DRAIN
DRAINAGE DITCH
GAS
WATER
TRAFFIC SIGNAL
TELCOM
STEAM
UNKNOWN UTILITY
RIGHT OF WAY
TRAFFIC CONES
PROPOSED NEW BORE
STRAW WATTLES
P
LT
CW
R
UTILITY POLE
VAULT - SMALL
PEDESTAL
STREET LIGHT
CROSSWALK LIGHT
UTILITY RISER
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
CATCH BASIN
CATCH BASIN WITH SOCK
GLULAM UTILITY POLECENTER LINE
LANE LINE
FENCE
HIGH VISIBILITY FENCE
S SEWER MANHOLE
D DRAIN MANHOLE
W WATER MANHOLE
V UTILITY VALVE
SHRUBBERY
BORE PIT
VAULT - LARGE
VAULT - 25TA
C COMMUNICATION MANHOLE
FIRE HYDRANT
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
X.X DISTANCE DIMENSION
ASPHALT SURFACE
CONCRETE ROADWAY PANEL
HF H-FRAME
VAULT - LARGE
CAB CABINET
LEGEND
LANE DIRECTION INDICATOR
PROPOSED
MARK-UP NOTATIONS RESTORATION TYPESEXISTING FEATURESLINE TYPES
A
7
LANDSCAPE
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION SHOWN ON PAGE
FL FL
P P
TS TS
C C
D D
DD DD DD DD DD
G G
W W
T T
ST ST
ROW
S
UK
CB
CB
P P
V V V
V VV
WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT
#PHOTO LOCATOR SYMBOL
PROPOSED NEW TRENCH
EXISTING UNDERGROUND PATHWAY
PROPOSED NEW AERIAL STRAND
EXISTING AERIAL PATHWAY
EXISTING SPLICE CASE
PROPOSED SPLICE CASE
EXISTING FIBER/COAX STORAGE
PROPOSED FIBER/COAX STORAGE
TREE
EOP
V VAULT - SMALL
444LA MANHOLE
VAULT - 25TA
VAULT - LARGE
EXISTING - CONTINUED
233LA MANHOLE
233LA MANHOLE
GRAVEL
CONCRETE SIDEWALK
PARCEL LINE
GENERAL NOTES
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE (1) 4" SCHEDULE 40 PVC, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001050901RENTON WATERSHED RELOCATION625 WILLIAMS AVE SRENTON, WA 98057FORCED RELOCATES17-050
6/28/2022
AM
GW
NTS
0 0 0
3
5
GENERAL NOTES
All new conduit in the ROW shall be schedule 80 or equivalent.
~CB900
615 ROWROWROWROWROWROWROWROWROWROWROWROWS GRA
D
Y
WA
Y
WILLIAMS AVE SEOPEOPS
S
SSSSSSSSSSSSSSSSSS
SS
DDDDDDDDD DDDDDDDDDDDDDDDDDDDDDWWWWWWWWWWFHWWM
V
V 200'R
25'
G GGGVAULTPOWERCCCCCCCCCCCCCCCBD
CB
~CB~LAND
S
C
A
P
E
SIDE
W
AL
KSIDEWALKSIDEWALKSIDEWALK
S GRA
D
Y
WA
YWILLIAMS AVE SC
CC
S
T
A
2
1
+
5
0
S
T
A
2
2
+
0
0
STA 22+11
STA 31+00
STA 31+50
STA 32+00
STA 32+50
STA 32+15
C
C
C
C
C
MH MH
MH
MH
MH
MH
UTILITY DISCLAIMER
ALL LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE.
LOCATION OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCLAIMER
PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION
DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS
STATION START
STATIONING STARTS AT 10+00, 20+00, &
30+00 AT THE INTERSECTION OF WILLIAMS
AVE S & S GRADY WAY.
CATCH BASIN WITH SOCK
CSWPP LEGEND
CB
POTHOLE DISCLAIMER
POTHOLE IN SOFT SURFACES
WHEN AVAILABLE. PATCH
POTHOLE LOCATION PER LOCAL
JURISDICTION SPECIFICATION
LOCATION
MATCH LINE SEE SHEET 5EOPEOPEOPEOPGGGGGGWWWWWTTPPPPPEOPEOPEOPEOP EOP
EOP
EOP
EOP
ROW175'1
2
CONSTRUCTION NOTES:
PROOF AND PULL FIBER THROUGH (1) 4" CONTRACTOR PLACED
CONDUIT.
INSTALL (1) NEW 4" RISER AT EACH POLE. PULL FIBER.
PLACE (1) NEW PED.
PLACE NEW 36X30 VAULT.
1
2
4
3
1
2RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF RENTON
SPECIFICATIONS.
RESTORE CONCRETE SIDEWALK PER CITY OF RENTON
SPECIFICATIONS.
1R
2R R
25'
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001050901RENTON WATERSHED RELOCATION625 WILLIAMS AVE SRENTON, WA 98057FORCED RELOCATES17-050
6/28/2022
AM
GW
1:20
0 10 20
4
5
DESIGN
N
ROWROW ROWROWEOPSS
SS
SSSSSS
SS
SS
SSSSSS S
S DDDDDDDDDDDDDDDDDDDDD DDDDDDDDDDDDDDDDDDDDDDWWWWWWWWWV
V
DCBCB
CB
D
D
D
CB~WI
L
L
IAMS
AVE
SCBSIDE
W
AL
K
LAND
S
C
A
P
E
SIDE
W
AL
K
LAND
S
C
A
P
ESIDEWALKLANDSCAPE
5'
R
25'CC
C
CC CP S
T
A
1
0
+
0
0
S
T
A
1
0
+
5
0
S
T
A
1
1
+
0
0
S
T
A
1
1
+
5
0
S
T
A
1
1
+
8
7
S
T
A
1
1
+
8
2
S
T
A
1
0
+
4
5
S
T
A
2
0
+
0
0
S
T
A
2
0
+
5
0
STA 30+00
STA 30+50
STA 30+41
STA 30+35
MH
MH
MATCH LINE SEE SHEET 4
EOP EOPEOP
EOP EOPG
G
G
G
G
G GGGGGW
W
W
W
W
W
W
W
WW
T
T
T
T
T
T
T
T TTTT
T
T
T
T
T
T
T
T
T
T
T
T
T P
P
P
P
P
P
P
P PP
P
P
P
WWP
P
P
P
P
P
P
P PPPP~
~~
~
~
~
E
O
P
NEW SIDEWALK AND
LANDSCAPE LOCATION
NEW STREETLIGHT PAD
1
2
1R
1
1R
4'
5'36X30 175'200'100'215'1
1
5'
36X30
4
R
25'
4'5'
3
P
COM
36X3
0
CONSTRUCTION NOTES:
PROOF AND PULL FIBER THROUGH (1) 4" CONTRACTOR PLACED
CONDUIT.
INSTALL (1) NEW 4" RISER AT EACH POLE. PULL FIBER.
PLACE (1) NEW PED.
PLACE NEW 36X30 VAULT.
1
2
4
3
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF RENTON
SPECIFICATIONS.
RESTORE CONCRETE SIDEWALK PER CITY OF RENTON
SPECIFICATIONS.
1R
2R
4
4
UTILITY DISCLAIMER
ALL LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE.
LOCATION OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCLAIMER
PROPOSED PATH MAY CHANGE AT TIME OF CONSTRUCTION
DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS
STATION START
STATIONING STARTS AT 10+00, 20+00, &
30+00 AT THE INTERSECTION OF WILLIAMS
AVE S & S GRADY WAY.
CATCH BASIN WITH SOCK
CSWPP LEGEND
CB
POTHOLE DISCLAIMER
POTHOLE IN SOFT SURFACES
WHEN AVAILABLE. PATCH
POTHOLE LOCATION PER LOCAL
JURISDICTION SPECIFICATION
LOCATION
N
OF
APPROVED BY:
PROJECT CODE:
DRAWN BY:
DATE:
SCALE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001050901RENTON WATERSHED RELOCATION625 WILLIAMS AVE SRENTON, WA 98057FORCED RELOCATES17-050
6/28/2022
AM
GW
1:20
0 10 20
5
5
DESIGN