Loading...
HomeMy WebLinkAbout2021-2022 Fee Schedule_2022 2nd QtrCity of Renton Fee Schedule 2021‐2022 Rev. July 2022 City of Renton Fee Schedule 2021‐2022 Table of Contents Page SECTION I. MISCELLANEOUS FEES 1 SECTION II. MAPLEWOOD GOLF COURSE 2 SECTION III. City CENTER PARKING FEES 2 SECTION IV. AQUATIC FEES 3 SECTION V. CARCO THEATER (REPEALED) 3 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 3 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 4 SECTION VIII. AIRPORT CHARGES 4 SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐24 SECTION X. BUSINESS LICENSES 4 SECTION XI. ADULT ENTERTAINMENT LICENSES 4 SECTION XII. DEVELOPMENT FEES 4 Building Fees:4 Land Use Review Fees:6 Public Works Fees: 8 Technology Surcharge Fee 11 Impact Fees: 11 Miscellaneous Fees: 12 SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA) 13 City of Renton Fee Schedule 2021‐2022 SECTION I. MISCELLANEOUS FEES 2021 2022 1. Maps: a. Zoning maps ‐ standard 11 x 17 $4 $4 b.  Zoning maps ‐ large 24 x 36 $12 $12 c.  Comprehensive Plan map ‐ standard 11 x 17 $4 $4 d.  Comprehensive Plan map ‐ large 24 x 36 $12 $12 e.  Precinct maps $5 $5 2. Plat: a.  First page $2 $2 b.  Each additional page $1 $1 3. Photocopies:  a.  Each 8.5" x 11" or 8.5" x 14"$0.15 $0.15 b.  Each 11" x 17"$0.20 $0.20 c.  Each 8.5" x 11" or 8.5" x 14" color $0.25 $0.25 4. Budget: a.  City's Budget $10 $10 b.  N/C N/C 5. Audio or Video Recording Copies: a.Audio recording, each copy $2 $2 b.Video recording, each copy $2 $2 6. Regulations and Plans: a.Comprehensive Plan and Map $30 $30 b.Title IV, Development Regulations: (i) Text and Zoning Map $110 $110 (ii) Text only $100 $100 c.Individual Chapters of Development Regulations $10 $10 d. Renton Municipal Code (two volumes)$400 $400 e.Code Supplements, per year: (i) Titles I ‐ III and VI ‐ X $70 $70 (ii) Title IV $70 $70 7. Miscellaneous Services: a.Certification and Notary Fees ‐ Clerk's Certification $10 $10 b.Notary Public Attestation or Acknowledgement or as $10 $10 otherwise provided for in RCW 42.28.090, per signature c.Hold Harmless Agreements and other similar documents $20 $20 not otherwise provided for d.Lamination of licenses, pictures $6 $6 e.Community Development Block Grants (CDBG) Loan Program: (i) Application Fee $200 $200 (ii) Loan Origination Fee $150 or 0.25% of loan amount,  whichever is greater $150 or 0.25% of loan amount,  whichever is greater (iii) Closing Costs (including any legal fees)50% of total actual costs 50% of total actual costs 8. Miscellaneous Charges for Police Services: a.Police Reports per page $0.15 $0.15 b.Record Checks (Written Response) $5 $5 c.Photographs ‐ Digital on CD $2 $2 d.Photographs ‐ black & white or color ‐ Cost of developing film Cost Cost e.Fingerprint Cards $5 $5 (i) Each additional card $1 $1 9. Charges for Fire Documents: a.Fire reports per page $0.15 $0.15 b.Fire investigative report on CD $2 $2 c.First copy ‐ black & white or color ‐ Cost of developing film Cost Cost d.Additional copy ‐ black & white or color ‐ Cost of developing film Cost Cost 10. Computer Listings: a.City of Renton new business list $10 $10 b.List of all business licenses $20 $20 c.Copies requested to be faxed, local number $3 $3 d.Copies requested to be faxed, long distance number (i) One (1) ‐ five (5) pages $10 $10 (ii) Six (6) or more pages (ten (10) page limit)$20 $20 11. Utility Fee: a.Special Request Water Meter Reading $30 $30 b.Utility New Account Setup $25 $25 c.Utility Billing Account Transfer (tenant billing form)$5 $5 d.Water utility outstanding balance search requested by $25 $25 fax, messenger, or letter 12. Schedule of Fines for False Alarms ‐ Security/Burglar: (effective February 1, 2019) a.One‐time Registration Fee $25 $25 b.Annual Registration Renewal N/C N/C c.First False Alarm in a registration year*N/C N/C d.Second False Alarm in a registration year*$100 $100 e.Third or more False Alarm in a registration year*$250 $250 f.Late Payment Fee $25 $25 g.Unregistered Alarm System Fee $50 $50 *A registration year shall mean January 1 thru December 31 each year. 13. NSF Check Fees $25 $25 City's Budget to other municipality or quasi‐municipal corporation or other nonprofit charitable or education organization 1 City of Renton Fee Schedule 2021‐2022 SECTION I. MISCELLANEOUS FEES (CONTINUED)2021 2022 14. Veteran Park Tile: Three lines $75 $75 15. Electronic Records: a.Photocopies or printed copies of electronic records, per page $0.15 $0.15 b.Scanning paper records, per page $0.10 $0.10 c.Electronic files or attachments uploaded for electronic delivery (email, cloud‐based data storage service, or $0.05 $0.05 other means of electronic delivery), for each four (4) files d.Transmission of records in an electronic format or for the use of agency equipment to send the records $0.10 $0.10 electronically, per gigabyte (GB) 16. Document Recording Fees: a.Actual Costs Actual Costs b.Miscellaneous charges associated with document recording, such as courier fees Actual Costs Actual Costs 17. Publication Fees:  Actual Costs Actual Costs SECTION II. MAPLEWOOD GOLF COURSE 2021 2022 1. a.Weekday: (i) 18 Hole $39 $41 (ii) 9 Hole $29 $30 (iii) 18 Hole, Senior $30 $31 (iv) 9 Hole, Senior $22 $23 (v) 18 Hole, Junior $21 $25 (vi) 9 Hole, Junior $17 $19 b.Weekend: (i) 18 Hole $46 $48 (ii) 9 Hole $29 $30 2. Club Rental*: a.Regular $25 $30 b.Premium $50 $60 3. Golf Cart Fees*: a.18 Hole $34 $36 b.18 Hole Single Rider $26 $28 c.9 Hole $22 $24 d.9 Hole Single Rider $16 $18 e.Trail Fee $15 $15 f.Half Cart, 18 Hole $18 g.Half Cart, 9 Hole $12 4. Driving Range Fees*: a.Large Bucket $11 $12 b.Small Bucket $6 $9 c.Warm‐up Bucket $4 $6 5. Lesson Fees: a.1/2 Hour Private $45 $55 b.1 Hour Private $65 $80 c.1/2 Hour Series Private $160 $200 d.1 Hour Series Private $240 $300 e.Group Series $100 $140 f.1/2 Hour Private, Junior $25 $35 g.Playing Lesson(3‐hole minimum/9‐hole maximum) per hole $15 $25 * Rates include Washington State Sales Tax (WSST) SECTION III. City CENTER PARKING FEES 2021 2022 1. City Center Parking Garage Fees: Parking rates for retail parking will be as follows: a.Zero (0) ‐ two (2) hours N/C N/C b.Two (2) ‐ four (4) hours $2 $2 c.Four (4) ‐ six (6) hours $4 $4 d.Six (6) ‐ (10) hours $6 $6 e. 10 hours or more $10 $10 *The charges identified in RCW 42.56.120(3)(b) (and referenced above) may be combined to the extent that more than one  type of charge applies to copies produced in response to a particular request. The actual cost of any digital storage media or  device provided by the agency. Alternatively, the City may charge a flat fee of up to $2 for the entire request as long as the  cost of uploading and transmitting the electronic records is reasonably estimated to equal or exceed that amount. Only one $2  flat fee per request is authorized for electronic records produced in installments. When records are provided electronically on  a CD, DVD, thumb drive, flash drive, or other electronic device, the requestor will be charged for the cost of the electronic  storage device. The City may charge an actual‐cost service charge for requests that require use of IT expertise to prepare data  comilations or provide customized electronic access services when not used by the City for other purposes. A cost estimate  and explanation will be provided to the requestor before incurring the costs. Option to waive charges.  The City may waive charges associated with fulfilling a request.  The decision will be based on  various factors, including the volume and format of the responsive documents. The decision to assess fees for fulfilling a public  records request shall be made on a consistent and equitable basis, dependent primarily upon the amount of staff time  required for copying, scanning, shipping, uploading, and/or transmitting the records associated with fulfilling a request. Certified copies.  If the requestor is seeking a certified copy of a City record, an additional charge of $1.00 per each complete  document may be applied to cover the additional expense and time required for certification. The applicant shall pay all document recording fees charged by King county and all administrative fees charged by the title company  for processing. Payment in full shall by submitted to the City before documents are sent for recording. The applicant shall pay all Publication fees charged by publication outlet used by the City (The Seattle Times or equivalent).  Payment in full shall be made to the City prior to public hearing, permit approval or issuance, whichever comes first. Note:  Should Section I fees due total less than $4.00 and no other fee is due to the City at the same time, the department  administrator may authorize to waive the entire amount due at their discretion. Green Fees*:  For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining  four days of the week. "Junior" shall mean ages 17 and under, "Senior" shall mean ages 62 and over.  Off‐season and promotional rates determined by management; posted on website. 2 City of Renton Fee Schedule 2021‐2022 f.Monthly pass‐holders, tax included $35 $35 SECTION IV. AQUATIC FEES 2021 2022 1. Admission for the Aquatic Center shall be as follows: a.Regular Session: (i) Infants ‐ under 1 year N/C N/C (ii) Youth ‐ 1 to 4 years $6 $8 (iii) Ages 5 and up $11 $16 (iv) Lap swim ‐ water walking only $5 $7 (v) Locker Rental $0.25 $0.25 b.Canopy Rental Fees*: (includes canopy and admission for one leisure swim session): (i) Henry Moses Party Tent #1  (10' x 20' for up to twenty‐five (25) guests on wave pool): (1) Resident Rate, per session $450 $600 (2) Non‐resident Rate, per session $550 $700 (ii) Henry Moses Party Tent #2  (10' x 20' for up to twenty‐five (25) guests): (1) Resident Rate $400 $500 (2) Non‐Resident Rate $500 $600 (iii) Henry Moses Party Tent #3 (10' x 10' for up to ten (10) guests): (1) Resident Rate, per session $200 $250 (2) Non‐resident Rate, per session $240 $300 c.Resident Rate all inclusive*$1,800 $3,800 d.Non‐resident Rate all inclusive*$2,300 $4,800 *Sales tax not included in the rental fee e.Swim Lesson Program: Fees and associated descriptions are published in the "What's Happening" Renton Activities Guide 2. Boat Launch Rates: a.Daily resident ‐ 7 days a week $10 $15 b.Daily Non‐resident ‐ 7 days a week $20 $25 c.Overnight resident ‐ 7 days a week $20 $25 d.Overnight Non‐resident ‐ 7 days a week $40 $45 e.Annual parking boat launch permit ‐ resident $60 $70 f.Annual parking boat launch permit ‐ non‐resident $120 $130 g. (i) $50 $75 (ii) $50 $90 SECTION V. CARCO THEATER (REPEALED)2021 2022 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 2021 2022 1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 50 people: a.Resident 10am‐7pm $140 $150 b.Non‐resident 10am‐7pm $280 $290 2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people: a.Resident 10am‐7pm $140 $150 b.Non‐resident 10am‐7pm $280 $290 e.South Shelters 1 & 2 Resident rate $300 $310 f.South Shelters 1 & 2 Non‐resident rate $600 $610 3. Gene Coulon Beach Park Shelters (North Shelter): a.Resident 10am‐7pm $160 $200 b.Non‐resident 10am‐7pm $320 $360 4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only): a.Tennis court (i) $10 $25 (ii) $10 $30 b.Park basketball court (i) $10 $25 (ii) $10 $30 c.Sand volleyball court (i) $10 $25 (ii) $10 $30 5. a.Resident rate per hour $10 $25 b.Non‐resident rate per hour $25 $30 c.Special Event Permit Fee $85 $85 6. Piazza Park Open Space Event Rental a.Full day rental  10am ‐ 7pm $500 $500 7. Photo Shoots per hour: a.Commercial Film and Photo Shoots per hour $300 $300 8. Electrical Spider Box rental: a.      Electrical spider box rental per box, per event, with special event approval $100 $100 9. Athletic Field Rental, Lights and Prep Fees: a.Sports field rental per hour ‐ resident $25 $30 b.Sports field rental per hour ‐ non‐resident $30 $36 c.Renton Area Youth Sports Agencies, per hour $6 $8 d.Field prep for softball/baseball ‐ resident per occurrence $30 $35 e.Field prep for soccer ‐ resident per occurrence $45 $50 f.Custom Field prep ‐ resident per occurrence $100 $100 g.Field prep for softball/baseball ‐ non‐resident per occurrence $35 $40 h.Field prep for soccer ‐ non‐resident per occurrence $50 $55 i.Custom Field prep ‐ non‐resident per occurrence $100 $100 Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale  Lions, Sunset, and Riverview Parks): Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at the current  rental rate) per event Resident rate Non‐resident rate Resident rate Non‐resident rate Resident rate Non‐resident rate Resident rate Non‐resident rate 3 City of Renton Fee Schedule 2021‐2022 SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2021 2022 j.Field lights all sports ‐ resident per hour $25 $30 k.Field lights all sports ‐ non‐resident per hour $30 $36 10. Banquet & Classroom Rental ‐ Community Center & Senior Activity Center: a.Friday evening 5 hour minimum ‐ resident $650 $750 b.Weekend Rates 10 hour minimum ‐ resident $1,300 $1,500 c.Extra hours ‐ per hour ‐ resident $130 $150 d.Friday 5 hour minimum ‐ non‐resident $750 $900 e.Weekend Rates 10 hour minimum ‐ non‐resident $1,500 $1,800 f.Extra hours ‐ per hour ‐ non‐resident $150 $180 g.Kitchen charge ‐ per hour $100 $100 h.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ resident/hr 3 hour min $85 $100 i.Banquet Room ‐ Mon ‐ Fri ‐ daytime ‐ non‐resident/hr 3 hour min $90 $120 j.Damage deposit $550 $550 k.Contract violation fee ‐ per hour ‐ resident $200 $300 l.Contract violation fee ‐ per hour ‐ non‐resident $200 $360 m.Cancellation Fee ‐ Less than 90 days $550 $550 11. Classroom and Gymnasium Rental ‐ Renton Community Center: a.Resident single gym athletic ‐ per hour $45 $50 b.Non‐resident single gym athletic ‐ per hour $50 $60 c.Resident double gym athletic ‐ per hour $90 $100 d.Non‐resident double gym athletic ‐ per hour $100 $120 e.Resident single gym non‐athletic $550 $1,000 f.Non‐resident single gym non‐athletic $675 $1,200 g.Resident double gym non‐athletic $1,100 $2,000 h.Non‐resident double gym non‐athletic $1,350 $2,400 i.Carpet fee single gym ‐ resident & non‐resident $325 $325 j.Carpet fee double gym ‐ resident & non‐resident $650 $650 k.Classroom resident $35 $40 l.Classroom Non‐resident $40 $48 12. Facility Rental ‐ Neighborhood Center: a.Meeting room ‐ resident $35 $40 b.Gymnasium ‐ resident $35 $40 c.Meeting room ‐ non‐resident $40 $48 d.Gymnasium ‐ non‐resident $40 $48 13. Farmer's Market a.10x10 Lot $40 $40 b.Half Lot $20 $20 c.Application fee $30 $30 d.Electrical fee $5 $5 14. Parklet Rentals  a. Parklet Rental including Installation per Occurrence1 $500 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 2021 2022 Fees and associated descriptions are published and available in the "Let's Go Renton" Recreation Guide. SECTION VIII. AIRPORT CHARGES 2021 2022 1.Airport Fuel Flow Charge:  per gallon $0.08 $0.08 2.JetA Fuel Flow Charge:  per gallon $0.10 $0.10 3.Transient airplane parking daily $8 $8 4.Hangar wait list, one time fee $100 $100 5.Tie‐down wait list, one time fee $25 $25 6.Lost gate card fee per occurrence $50 $50 7.T‐Hangar, Non‐Refundable Move‐in Fee $250 $250 8.Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence) $500 $500 9.Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $500 $500 SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐2 2021 2022 1.Altered Animal Annual License $30 $30 2.Unaltered Animal Annual License $50 $50 3.Economically Qualified Resident Special Lifetime License $0 $0 4.Duplicate Tag $10 $10 5.Late Charge $30 $30 SECTION X. BUSINESS LICENSES 2021 2022 1. General Business License: a.Registration Fee $150 $150 b.Appeal of Business License Decision $250 $250 2. Penalties: a.The penalty to reinstate an expired business license $50 $50 b.The penalty  for failure to obtain a business license $250 $250 c. SECTION XI. ADULT ENTERTAINMENT LICENSES 2021 2022 1. Every person applying for a adult entertainment license  shall pay the applicable nonrefundable application fee: a.Adult Entertainment Business License $750 $750 b.Entertainer $75 $75 c.Manager $75 $75 d.License Replacement $10 $10 2. Penalties: 1Revocable Right of Way Permit will be required if located within the City Right of Way.  See Section XII, Development Fees, of the  City of Renton Fee Schedule Brochure: Subsection j of subsection 3, Public Works Fees *Please note, impounded animals are subject to license fees, microchipping costs, and other out‐of‐pocket costs as specified in  RMC 6‐6‐2. Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of Chapter  5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license fee for the first  month of the delinquency and an additional penalty of (5%) for each succeeding month of delinquency, but not exceeding a  total penalty of (15%) of the amount of such license fee. 5%‐15%5%‐15% 4 City of Renton Fee Schedule 2021‐2022 a.Civil Penalty, per violation $1,000 $1,000 SECTION XII. DEVELOPMENT FEES 2021 2022 1. Building Fees: a.Building and Demolition Permit Fees:1 (i) Base Fee/Valuation $1.00 to $500.00 $34 $37 (ii) Valuation $501.00 to $2,000.00 $34 + $3.83 x each $100 value $37 + $4.21 x each $100 value (iii) Valuation $2001.00 to 25,000.00 $88.75 + $17.59 x each $1,000  value $97.63 + $19.35 x each $1,000  value (iv) Valuation $25,001.00 to $50,000.00 $493.26 + $12.60 x each  $1,000 value $542.59 + $13.86 x each $1,000  value (v) Valuation $50,001.00 to $100,000.00 $808.26 + $8.77 x each $1,000  value $889.09 + $9.65 x each $1,000  value (vi) Valuation $100,001.00 to $500,000.00 $1,225.76 + $7.04 x each  $1,000 value $1,348.34 + $7.74 x each  $1,000 value (vii) Valuation $500,001.00 to $1,000,000.00  $4,039.76 + $5.93 x each  $1,000 value $4,443.74 + $6.52 x each  $1,000 value (viii) Valuation $1,000,001.00 and up $7,006.01 + $4.57 x each  $1,000 value $7,706.61 + $5.03 x each  $1,000 value b.Combination Building Permit Fees*1 (i) Plumbing up to 3,000 sq ft $256 $282 (ii) Plumbing over 3,000 sq ft $282 $310 (iii) Mechanical up to 3,000 sq ft $205 $226 (iv) Mechanical over 3,000 sq ft $231 $254 (v) Electrical up to 3,000 sq ft $231 $254 (vi) Electrical over 3,000 sq ft $282 $310 * Combination Building Permit fees are required for each new single family residential structure c.Building Plan Check Fee1 (i) Initial Building Plan Check Fee*65% of permit fee 65% of permit fee (ii) Additional Building Plan Check Fee 50% of initial plan Check Fee 50% of initial plan Check Fee d.State Building Code Fee: (i) Non‐residential projects:$25 $25 (ii) Residential projects:$6.50 $6.50 (1) Each additional unit after first unit:$2 $2 e.Electrical Permit Fees: (i) Residential Fees ‐ Single ‐Family and Duplex (1) New Service ‐ Single Family and Duplex1 (a) Up to 200 AMP $217 $239 (b) Over 200  AMP $231 $254 (2) Service Changes/New Circuits ‐ Single Family and Duplex: (a) Change up to 200 AMP $169 $186 (b) Change over 200 AMP $179 $197 (c) Any new circuits added to above price is per each up to a maximum of $80.00 $21 $23 (d) Minimum fee for remodel/addition of new circuits without a service charge $169 $186 (e) Cooling system circuit for new or replaced appliance $75 $83 (ii) Multi‐Family, Commercial and Industrial Fees: (1) Value of work: $1.00 to $500.00 $66 $73 $500.01 to $1,000.00 $49 + 3.5% of  value $53.90 + 3.5% of  value $1,000.01 to 5,000.00 $86.10 + 3.05% of value $94.71 + 3.05% of value $5,000.01 to $50,000.00 $245.70 + 1.8% of value $270.27 + 1.8% of value $50,000.01 to $250,000.00 $1,183.35 + 1.05% of value $1,301.69 + 1.05% of value $250,000.01 to $1,000,000.00 $3,939.60 + 0.85% of value $4,333.56 + 0.85% of value $1,000,000.01 and up $12,759.60 + 0.47% of value $14,035.56 + 0.47% of value (iii) Temporary Electrical Services $169 $186 (iv) Miscellaneous Electrical Fees (1) Job Trailers $169 $186 (2) Signs per each $169 $186 (3) Mobile Homes $169 $186 (4)50% of commercial fees  Minimum $169 50% of commercial fees  Minimum $186 f.House Moving* ‐ minimum per hour Inspection Fee:$154 $169 * Building Plan Check Fee is in addition to the building permit fees, demolition permit fees, and combination building  permit fees.  The plan check fee is equal to 65% of the building permit fee, or the demolition permit fee, or the  combination building permit fee.  Includes three (3) review cycles. Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable  television, etc.) Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations  are exempt from fees *This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged  by the Public Works Department to cover the actual house move permit. A building permit is also required in order to site  the structure on the new site. 5 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 1. Building Fees: (continued) g.Inspection Fee For Condominium Conversions $154 on 1st unit / $21 each  add'l unit $169 on 1st unit /  $23 each add'l unit h.Manufactured/Mobile Home Installation Fees*: (i) Within a manufactured home park $154 $169 (ii) Outside of a manufactured home park Building Permit Fees Building Permit Fees i.Mechanical Permit Fees:1 (i) Residential ‐ Mechanical Permit base fee plus itemized fees below: $53 $58 (1)$21 $23 (2) Boiler or Compressor $21 $23 (3)$21 $23 (4) Ventilation/exhaust fan $21 $23 (5) Fuel Gas Piping (each gas piping system up to 6 outlets) $21 $23 (ii) Commercial or Multi‐Family ‐ Mechanical Permit base fee plus itemized fees below: $77 $85 (1)$36 $40 (2) Boiler or Compressor $77 $85 (3) Refrigeration System $77 $85 (4)$77 $85 (5) Incinerator: Installation or relocation of each  $103 $113 (6)$36 $40 (7) Fuel Gas Piping (each gas piping system up to 6 outlets) $36 $40 j.Plumbing Permit Fees:1 (i) Residential ‐ Plumbing Permit base fee plus itemized fees below: $53 $58 (1)$10 $11 (2) Water Service: For meter to house $10 $11 (3) Per fixture for repair or alteration of drainage or vent piping $10 $11 (4) Per drain for rainwater systems   $10 $11 (5) Per lawn sprinkler system, includes backflow prevention $10 $11 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc. $10 $11 (7) Per interceptor for industrial waste pretreatment $10 $11 (8) Fuel Gas Piping: (each gas piping system up to 6 outlets) $21 $23 (ii) Commercial or Multi‐Family: Plumbing Permit base fee plus itemized fees below: $77 $85 (1) Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $15 $17 (2) Water Service: For meter to building $15 $17 (3) Per fixture for repair or alteration of drainage or vent piping $15 $17 (4) Per drain for rainwater systems   $15 $17 (5) Per lawn sprinkler system, includes backflow prevention $15 $17 (6) Per vacuum breaker or backflow protection device on tanks, vats, etc. $15 $17 (7) Per interceptor for industrial waste pretreatment $15 $17 (8) Fuel Gas Piping: (each gas piping system up to 6 outlets) $26 $29 (9) Medical Gas Piping: (each gas piping system up to 6 outlets) $77 $85 k.Sign Permit Fees: (i) Permanent Signs: (1) Roof, projecting, awning, canopy, marquee, and wall signs $256 $282 (2) Freestanding ground and pole signs  $256 $282 (ii) Temporary and Portable Signs: (1) Real Estate Directional Signs, pursuant to RMC 4‐4‐100J2, permit valid for a 12‐months period $77 $85 (2) Grand Opening Event Signs, pursuant to RMC 4‐4‐100J6d(i) $77 $85 (3) Event Signs, pursuant to RMC 4‐4‐100J6d(ii) and (iii) per sign, per promotion $51 $56 (4)$128 $141 (5) Commercial Property Real Estate Banner each sign permit is valid for 12 months. $77 $85 (6) Decorative Flags fee is per entrance and valid until flag(s) are removed $77 $85 l.Miscellaneous Fees: (i) Inspection Fees: (1) Minimum Housing Inspection $128 $141 (2) WABO ‐ Adult Family Home; Misc building inspection $128 $141 (3) Reinspection Fee; Misc building inspection $128 $141 (ii) Plan Review Fees: (1) Electrical, Plumbing, or Mechanical Permits (percentage of permit fee) 40% 40% (2) Additional Plan Review Fees: Over three review cycles (percentage of plan review fee) 50% 50% (3) Miscellaneous Plan Review: hourly fee.$128/hr $141/hr (iii)2 X Permit Fee 2 X Permit Fee 2. Land Use Review Fees: a.General Land Use Review: (i) Additional Animals Permit $50 $50 (ii) Address Change $105 $105 (iii) Annexation: (1) Less than 10 acres $5,250 $5,250 (2) 10 acres or more $5,250 $5,250 *  Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water  connection fees are in addition to the below amounts). Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.).  A/C system (air  conditioner, chiller or Air Handling Unit (VAV) including ducts and vents) Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for  which no other fee is listed in this code Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.).  A/C system (air  conditioner, chiller or Air Handling Unit (VAV) including ducts and vents) Commercial Hood: Installation of each served by a mechanical exhaust, including the ducts for such hood each  Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for  which no other fee is listed in this code Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap A‐Frame Signs, pursuant to RMC 4‐4‐100J5 Charge is for the first sign, all subsequent signs are $50.00 Work commencing before permit Issuance:  Where work for which the permit is required is started prior to  obtaining the permit, a special investigation fee in an amount equal to twice the permit fee shall be charged. The  special investigation fee shall be paid in addition to the required permit fees. 1 Per Res. 4422, fees for an Accessory Dwelling Unit (ADU) will be waived as of the adoption date of Res. 4422, through December 31, 2022.  6 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 2. Land Use Review Fees: (Continued) (iv) Appeal of: (1) Hearing Examiner's Decision $500 $500 (2) Administrative Decision $500 $500 (3) Environmental Decision $500 $500 (v) Binding Site Plan (total fee for both preliminary and final phases) $5,280 $5,280 (vi)5% of Building Permit Fee (vii)0.5% of Construction Cost (viii) Code Text Amendment N/C N/C (ix) Comprehensive Plan Map or Text Amendment (each)$5,250 $5,250 Conditional Use Permit: (x) (1) HEX $3,300 $3,300 (2) Administrative $1,600 $1,600 (3) Revision (minor, administrative) 50% of Application Fee 50% of Application Fee (4) Revision (major)Application Fee Application Fee (xi) Critical Areas Exemption N/C N/C (xii) Critical Areas Permit $1,250 $1,250 (xiii)100% of 100% of  contract cost contract cost (xiv) Development Agreement $10,000 $10,000 (xv)100% of cost 100% of cost (xvi) Environmental Checklist Review $1,600 $1,600 (xvii) Environmental (SEPA) Addendum $1,600 $1,600 (xviii) Fence Permit (special)$160 $160 (xix) Grading and Filling Permit (Hearing Examiner)$5,410 $5,410 (xx) Landscape Review Fee $160 $160 (xxi) Legal Lot Segregation N/C N/C (xxii) Lot Consolidation $510 $510 (xxiii) Lot Line Adjustment $1,090 $1,090 (xxiv) Manufactured/Mobile Home Park: (1) Tentative $1,090 $1,090 (2) Preliminary $3,250 $3,250 (3) Final $1,600 $1,600 (xxv) Open Space Classification Request $155 $155 (xxvi) Plats: (1) Preliminary Short Plat $5,410 $5,410 (2) Final Short Plat $2,705 $2,705 (3) Preliminary Plat $10,830 $10,830 (4) Final Plat $5,410 $5,410 (5) Minor Plat Amendment 50% of Application Fee 50% of Application Fee (6) Major Plat Amendment Application Fee Application Fee (xxvii) Planned Urban Development: (1) Preliminary Plan $5,410 $5,410 (2) Final Plan $2,700 $2,700 (xxviii) Reasonable Use Exception: (a) In conjunction with land use permit $510 $510 (b) Stand alone $1,540 $1,540 (xxix) Public Arts Exemption N/C N/C (xxx) Rezone  $5,250 $5,250 (xxxi) Routine Vegetation Management Permit without Critical Areas  $105 $105 (xxxii) Shoreline‐Related Permits: (1) Shoreline Permit Exemption N/C N/C (2) Substantial Development Permit $2,700 $2,700 (3) Conditional Use Permit $3,250 $3,250 (4) Variance $3,250 $3,250 (xxxiii) Site Development Plan (Site Plan or Master Plan  which includes design review fee for projects subject to RMC 4‐3‐100): (1) Hearing Examiner Review $3,800 $3,800 (2) Administrative Review  $2,700 $2,700 (3) Modification (minor, administrative)  50% of current site  plan review fee 50% of current site  plan review fee (4)Application Application  Fees Fees (xxxiv) Small Cell Permit, per site3 $510 $510  (xxxv) Special Permit (Hearing Examiner) $2,700 $2,700 (xxxvi) Street Naming (Honorary) (1) Application $250 $250 (2) Installation $250 $250 (xxxvii) Temporary Use Permits: (1) Tier 1 $105 $105 (2) Tier 2 $205 $205 (xxxviii) Variance (per each variance requested) Administrative or Hearing Examiner $1,330 $1,330 (xxxix) Waiver or Modification of Code Requirements cost is per request $260 $260 (xxxx) Zoning Compliance Letter $480 $480 b.Miscellaneous Fees: (i) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed $175/hr 175/hr on Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the  hours of  city staff regular work schedule) c. Modification (major) required new application and repayment of fee required Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development  regulations of King County, the King County Land Use Review Fee Schedule shall apply, and is hereby adopted by reference. A  copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for public review. Critical Areas Review Fee:  for those projects that propose impacts to critical areas and will be billed at the cost of  contract biologist’s review.1 Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final2 Building Permit ‐ Site Plan/Zoning Review and Inspection Fee  Civil Construction Permit ‐ Site Plan/Zoning Review and Inspection Fee4 7 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 3. Public Works Fees: a.Franchise Application Fee1 $5,000 $5,000 b.Franchise Permit Fees: 1,2 (i) (1) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $600 $600 $600 $600 (3) Other public agencies constructing utilities within City right‐of‐way $600 $600 (ii) Small Cell Master Lease Agreement including Site License Addendum and Small Cell Permits (1) Master Lease Agreement Administrative Costs, $100 per staff hour Actual cost Actual cost (2) Pole Reservation, per pole $120 $120 (3) Administrative Fee, $100 per staff hour and/or cost of materials $760 deposit + $760 deposit + time and materials time and materials    (i) (a) Tier 1, Daily peak kWh <20 $715.38 $715.38 (b) Tier 2, Daily peak kWh 21 ‐ 40 $1,430.76 $1,430.76 (c) Tier 3, Daily peak kWh 41 ‐ 60 $2,146.14 $2,146.14 (d) Tier 4, Daily peak kWh 61 ‐ 80 $2,861.51 $2,861.51 (e) Tier 5, Daily peak kWh >81 $3,576.89 $3,576.89 (ii)Actual cost Actual cost (5)$270.00 $270.00 (6) All other fees, $100 per staff hour and/or cost of materials3 Actual cost Actual cost (iii) (1)$10.00 $10.00 (2)$20.00 $20.00 (3)$30.00 $30.00 1Bond required pursuant to RMC 9‐10‐5 c.Latecomers' Agreement Application Fees: (i) Processing fee1 (Nonrefundable)  (1) If amount covered by latecomers’ is $50,000 or less $1,000 $1,000 (2) If amount covered by latecomers' is between $50,000 and $200,000 $2,000 $2,000 (3) If amount covered by latecomers' is greater than $200,000 $4,000 $4,000 (ii) Latecomers' Agreement – Administration and collection fee  (1) if amount covered by latecomers' is $50,000 or less 15% of total 15% of total (2) If amount covered by latecomers' is between $50,000 and $200,000 10% of total 10% of total (3) If amount covered by latecomers' is greater than $200,000 5% of total 5% of total (iii) Segregation processing fee, if applicable $750 $750 d.System Development Charge Tables: (i) Water and Wastewater System Development Charges: (1) 5/8 x 3/4 inch and 1 inch: (a) Water service fee3 $4,450 $4,500 (b) Fire service fee 1,2 $594 $601 (c) Wastewater fee3 $3,450 $3,500 (2) 1‐1/2 inch: (a) Water service fee3 $22,250 $22,500 (b) Fire service fee 1,2 $2,971 $3,005 (c) Wastewater fee3 $17,250 $17,500 (3) 2 inch: (a) Water service fee3 $35,600 $36,000 (b) Fire service fee 1,2 $4,754 $4,807 (c) Wastewater fee3 $27,600 $28,000 (4) 3 inch: (a) Water service fee3 $71,200 $72,000 (b) Fire service fee 1,2 $9,508 $9,615 (c) Wastewater fee3 $55,200 $56,000 1The fixed application fee established herein is intended to cover the City’s internal administrative costs in processing and administering the franchise.  In addition to the fixed application fee,  the City may require applicants to either directly pay or reimburse the City for external costs reasonably incurred to process the application and/or administer the franchise agreement.  The  City may require applicants to deposit funds in advance to cover legal and/or other professional services fees as they are incurred. 2The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. 1The administration and collection fee is deducted from each individual latecomer fee payment and the balance forwarded to the holder of the latecomer’s agreement pursuant to RMC 9‐5,  Tender of Fee. 1Per RMC 4‐3‐050F7, the City may charge and collect fees from any applicant to cover costs incurred by the City in review of plans, studies, monitoring reports and other documents related to  evaluation of impacts to or hazards from critical areas and subsequent code‐required monitoring. 2When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall be prepared, the  City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of the projected costs for the EIS prior  to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will contract directly with a consultant for preparation of an  EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be selected by mutual agreement of the City and applicant after a call for proposals.  If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees collected under this subsection which remain after incurred costs are paid. The City may collect a  reasonable fee from an applicant to cover the cost of meeting the public notice requirements of this Title relating to the applicant’s proposal. The City shall not collect a fee for performing its duties  as a consulted agency. The City may charge any person for copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter 42.17 RCW. 3Prior to issuance of a small cell permit, the applicant shall pay the actual administrative expenses incurred by the City that are directly related to the City's review of the application, including plan  inspection, and approval, as authorized by RCW 35.21.860(1)(b), as may be amended. If a franchise agreement does not specify the fee amount, the generic fee, as identified in the following table, shall be collected:  (2) All other work, permit fee plus $150 per hour of inspection applied during regular inspection hours, overtime  inspection rates apply thereafter (4) Public Reimbursement (any costs incurred by the City on behalf of the permit applicant for installation or  operation of site equipment) Electrical service (annual fee)  All other reimbursement  Conduit Lease Rates per Lineal Foot (annual fee): Tier 1, conduit in existing planter strips Tier 2, conduit outside of planter strips excluding signalized intersection crossings, bridges and train tracks Tier 3, conduit within signalized intersection crossings, bridges and train tracks Site License Addendum Rent 4Construction costs as defined in the following Subsection g of Subsection 3, Public Works Fees; and Section XIII. 3Standard after hour and overtime fees apply. 8 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 3. Public Works Fees: (continued) (5) 4 inch: (a) Water service fee3 $111,250 $112,500 (b) Fire service fee 1,2 $14,856 $15,023 (c) Wastewater fee3 $86,250 $87,500 (6) 6 inch: (a) Water service fee3 $222,500 $225,000 (b) Fire service fee 1,2 $29,712 $30,046 (c) Wastewater fee3 $172,500 $175,000 (7) 8 inch: (a) Water service fee3 $356,000 $360,000 (b) Fire service fee 1,2 $47,539 $48,073 (c) Wastewater fee3 $276,000 $280,000 (ii) Storm Water System Development Charges: (1) New single family residence (including mobile/manufactured homes)3 $2,000 $2,100 (2) (3)$0.800 $0.840 per sq foot per sq foot e.Administrative Fees for SDC Segregation Request1  $750 + administrative costs  $750 + administrative costs  f. (i) Water Construction Permit Fees: (1) Water meter tests for 3/4” to 2" meter1 $50 $50 (a) Water meter tests on meters 2" or larger $60 deposit + time and  materials $60 deposit + time and  materials (b) Open and close fire hydrants for fire flow tests conducted by others. Time and materials Time and materials (c) Water service disconnection (cut at main)$275 $275 (d) Meter resets $95 $95 (e) Repair of damage to service $250 $250 (f) Water main connections $560 $560 (g) Water main cut and cap $1,025 $1,025 (h) Water quality/inspection/purity tests $80 $80 (i) Specialty water tests (lead, copper, etc) Cost of test + $70 processing  fee Cost of test + $70 processing  fee (j) Water turn ons/offs after hours $185 $185 (k) Installation of isolation valve. $2,000 deposit + time and  materials $2,000 deposit + time and  materials (l)$250 + $0.15 $250 + $0.15  per lineal per lineal  foot foot (m) Miscellaneous water installation fees. Time and materials Time and materials (n) Service size reductions $50 $50  (o) Installation fees for ring and cover castings $200 $200  (2) Water meter installation fees – City installed:2 (a) 3/4” meter installed by City within City limits. Installation of stub service and meter setter only. $2,875 $2,875 (i) 3/4" meter drop in only $400 $400 (b) 3/4” meter installed by City outside City limits. Installation of stub service and meter setter only. $2,935 $2,935 (i) 3/4" meter drop in only $400 $400 (c) 1” meter installed by the City.  Installation of stub service and meter setter only. $2,875 $2,875 (i) 1" meter drop in only $460 $460 (d) 1‐1/2" meter installed by the City. Installation of stub service and meter setter only. $4,605 $4,605 (i) 1‐1/2” meter drop in only $750 $750 (e) 2” meter installed by the City. Installation of stub service and meter setter only. $4,735 $4,735 (i) 2" meter drop in only $950 $950 (3)$220 $220 (4) Hydrant Meter fees:1 (a) Hydrant meter permit fee $50 $50 (b) Deposits: (i) 3/4” meter and backflow prevention assembly. $500 $500 (ii) 3” meter and backflow prevention assembly. $2,000 $2,000 (iii) Deposit processing charge, nonrefundable.$25 $25 (c) Meter rental (begins on day of pickup): (i) 3/4” meter and backflow prevention assembly. Per month. $50 $50 (ii) 3” meter and backflow prevention assembly. Per month. $250 $250 (ii) Wastewater and Surface Water Construction Permit Fees:1 (1) Residential: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (2) Commercial: (a) Wastewater permit fee $375 $375 All other uses charge per square foot of new impervious surface, but not less than $2,000 (2021) or $2,100  (2022) 1 Based upon the size of the fire service (NOT detector bypass meter) 2 Unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not be charged. 3Per Res. 4422, utility system development charges (hookup fees) for an Accessory Dwelling Unit (ADU) will be reduced by 50% as of the adoption date of Res. 4422, through December 31,  2022.  Public Works Construction Permit Fees:   1The applicant shall pay the City’s administrative costs for the preparation, processing and recording of the partial payment of the fee(s). If the same segregation is used for more than one  utility’s special assessment district, and/or latecomer’s charge, then only one administrative fee is collected. Addition to existing single family residence greater than 500 square feet (including mobile/manufactured  homes) Fee not to exceed $2,000 (2021) or $2,100 (2022) $0.800 per sq foot $0.840 per sq foot New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after the first two hundred fifty (250) lineal feet Water meter processing fees – Applicant installed: For meters larger than 2”, the applicant must provide materials  and installs.1 9 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 3. Public Works Fees: (continued) (b) Surface water permit fee $375 $375 (3) Industrial: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (4) Repair of any of the above (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (5) Cut and cap/Demolition permit: (a) Wastewater permit fee $375 $375 (b) Surface water permit fee $375 $375 (6)$375 $375 (7)$375 $375 plus King County plus King County sewer rate sewer rate on discharged on discharged amount amount (iii) Right‐of‐way Permit Fees: (1) Single family residence $325 $325 (2) All other uses, excluding those listed $625 $625 (3) Wastewater or storm water service $375 $375 (4) King County ROW Permits/Inspections: (a) Service Installation Only $1,025 $1,025 (b) Utility Extension per 100' of Length (Min 200' Length)$1,025 $1,025 (5) (iv)$525 $525 (v) (1) Standard locate $500 $500 (2) Large project locate $1,000 $1,000 g. (i) (1) $150,000.00 or less 6% of cost 6% of cost (2) Over $150,000.00 but less than $300,000.00. $9,000 + 5% over $150,000 $9,000 + 5% over $150,000 (3) $300,000.00 and over. $16,500 + 4% over $300,000 $16,500 + 4% over $300,000 (ii) Standard or minor drainage adjustment review $550 $550  (iii)$3,000  h. Grade and Fill License Fees: Fees shall be based on the highest tier triggered. Grade and Fill Quantity New or Replaced Hard Surface Tier < 50 cy < 2,000 sf 0 50 cy ‐ 499 cy 2,000 sf ‐ 4,999 sf 1 500 cy ‐ 4,999 cy 5,000 sf ‐ < 1 ac 2 5,000 cy ‐ 49,999 cy 1 ac ‐ < 2.5 ac 3 50,000 cy ‐ 99,999 cy 2.5 ac ‐ < 5 ac 4 100,000 cy and larger 5 ac and larger 5 (i) Review/Intake Fee: (1) Tier 0 (no permit required)N/A N/A (2) Tier 1 $466 $466 (3) Tier 2 $621 $621 (4) Tier 3 $932 $932 (5) Tier 4 $1,242 $1,242 (6) Tier 5 $1,553 $1,553 (ii) Inspection/Issuance Fee: (1) Tier 0 (no permit required)N/A N/A (2) Tier 1 $444 $444 (3) Tier 2 $887 $887 Work in right‐of‐way – construction permit: Utility and street/sidewalk improvements, excluding utilities from other  public agencies which shall be considered under a franchise permit. A bond is required, as stipulated in RMC 9‐10‐5,  Street Excavation Bond. Street light system fee, per new connection to power system  1Per Res. 4422, fees for an Accessory Dwelling Unit (ADU) will be waived as of the adoption date of Res. 4422, through December 31, 2022.  Utility Locate Refresh Fee (Fee is due each time excavator calls in for locate refresh during 45‐day locate ticket) Civil construction permit plan review and inspection fees1,3: All developers, municipal or quasi‐municipal entities, or utility  corporations or companies, except those specifically exempted, shall pay fees under this Section. Exempted entities include  City‐franchised cable TV, cable modem, natural gas, telecommunications, and electrical power. The fee will be based upon  percentages of the estimated cost of improvements using the following formula.  Exception: No permit fee shall be charged for individual homeowners for work in street rights‐of‐way for street  tree or parking strip irrigation systems or work associated with City of Renton capital improvement projects or  City funded projects. No permit fee shall be charged for moving pods or moving trucks in the right‐of‐way  provided that they are in the right‐of‐way for no more than three (3) days. No permit fee shall be charged for  use of the right‐of‐way in the CD zone, provided ground disturbing activity is not proposed.  2Per Res. 4422, water meter installation fees for an Accessory Dwelling Unit (ADU) will be reduced by 50% as of the adoption date of Res. 4422, through December 31, 2022. Reinspection for Wastewater or Surface Water Permits Ground water discharge (temporary connection to wastewater system for discharge of contaminated ground  water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on discharged  amount (meter provided by property owner) 7,000 sf ‐ < 3/4 acre 3/4 ac ‐ < 1 ac 1 ac ‐ < 2.5 ac 2.5 ac ‐ < 5 ac 5 ac and larger Street and utility plan review and inspection fees; estimated construction cost2: The applicant must submit separate,  itemized cost estimates for each item of improvement subject to the approval by the Public Works Plan Review  Section. 1Includes three (3) review cycles. Additional reviews will be charged $1,500 each. 2Construction cost shall be based on the City's bond quantity worksheet and shall include all project related improvements outside of the building envelopes, including, but not limited to, all  costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water management facilities; temporary erosion and sedimentation  control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public water main improvements; required off‐site street, bike and pedestrian  improvements; street lighting improvements; required landscaping and street tree improvements; and site grading and mobilization costs. 3If deemed necessary by the City in its sole discretion, the City will contract with one or more consultants to provide plan reviews and/or inspections with the related costs and expenses  payable by the applicant. Cleared or Disturbed  Area < 7,000 sf Wet weather (annual fee) 10 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 3. Public Works Fees: (continued) (4) Tier 3 $1,183 $1,183 (5) Tier 4 $2,366 $2,366 (6) Tier 5 $3,550 $3,550 (iii) Solid Waste Fills:1.5 x plan 1.5 x plan  check fee check fee (iv) Annual Licenses of Solid Waste Fills:  1.5 x plan 1.5 x plan  check fee check fee i. (i) Filing fee $250 $250 (ii) Processing fee $250 $250 j. (i) Single family and two family uses3, fee assessed annually plus leasehold excise tax1 if applicable $10.00 + LET1 $10.00 + LET1 (ii)0.5% x Value2 + LET1 0.5% x Value2 + LET1 (iii) (iv) Insurance Required:   (v) Exception for Public Agencies:  2Right‐of‐way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor 3Except those single family and two family uses that utilize right of way along the waterfront.  They shall be considered uses without public benefit. k. (i) Filing fee $500 $500 (ii) Appraised Value of Vacated right‐of‐way: (1) Less than $25,000 $750 $750 (2) $25,000 to $75,000 $1,250 $1,250 (3) Over $75,000 $2,000 $2,000 l. (i) (ii) (iii) m.Water or Sewer ‐ Redevelopment: (i) Fee(s) based upon meter(s) proposed for final project minus fee(s) based upon meter existing on site. n.5% of Building Permit Fee  o.Miscellaneous Fees: (i) Re‐inspection Fee $128 $128 (ii) Plan Revision following Permit Issuance: (1)$250 $250 (2)$1,500 $1,500 (iii) Street Frontage Improvements Fee‐In‐Lieu: (1) Street with existing storm drainage main line $113/LF $113/LF (2) Street with existing conveyance ditch $128/LF $128/LF (3) (iv)$125/hr $175/hr (v)$175/hr $175/hr The plan check fee for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking fees listed above.  The fee for a grading license authorizing additional work to that under a valid license shall be the difference between  the fee paid for the original license and the fee shown for the entire project.  Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in  chapter 9‐14 RMC, Vacations. 30% of system development  charge 30% of system development  charge The fee for annual licenses for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking fees listed  above. The fee for a grading license authorizing additional work to that under a valid license shall be the difference  between the fee paid for the original license and the fee shown for the entire project. Any unused fee may be  carried forward to the next year. If any work is done before the license is issued, the grading license fee shall be  doubled. Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in  chapter 9‐1 RMC, Easements. Revocable Right‐of‐way Permit Fees: All uses without public benefit fee is a per month charge assessed annually based on property value2 of land to be  utilized, plus leasehold excise tax1, if applicable.  Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold excise tax1,  if applicable. In no case less than $10.00.  30% of system development  charge 30% of system development  charge Water Fee; Annual fee equal to thirty percent (30%) of the current system development charge applicable to the size  of the temporary water meter(s).1 30% of system development  charge 30% of system development  charge Wastewater Fee; Annual fee equal to thirty percent (30%) of the current system development charge applicable to  the size of the temporary domestic water meter(s).1 Major (Results in a change of greater than 10% of the cost of construction based on the City's bond quantity  worksheet.) After hours inspection (applies to inspections performed on Saturdays, Sundays, observed City of Renton holidays,  and non‐holiday Monday‐Fridays outside the hours of 7:00am to 3:30pm) Permit review staff overtime (applies only if permit review is requested by the applicant to be performed on  Saturdays, Sundays, observed City of Renton holidays, and non‐holiday Monday‐Fridays outside of the hours of  city  staff regular work schedule) 1Fee shall be paid annually (non‐prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the system  development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and a boundary line of the proposed  development service area for use in the fee determination. Credit for existing water or sewer service: Any parcel that currently has water and or sewer service is eligible for a prorated  system development charge. Minor (Results in a change 10% or less than the cost of construction based on the City's bond quantity  worksheet. Excludes minor adjustments that are approved by the City to be shown on record drawings.) Building Permit ‐ Engineering Review Exception: No fee‐in‐lieu shall be charged to accessory dwelling units  Processing and completion fee, payable upon Council approval of the vacation and upon administrative  determination of appraised value of vacated right‐of‐way. Temporary connections to a City utility system may be granted for a one‐time, temporary, short‐term use of a portion of the  property for a period not to exceed three (3) consecutive years: Storm Water Fee; Fee equal to thirty percent (30%) of the current system development charge applicable to that  portion of the property.1 0.5% x Value2 + LET1 0.5% x Value2 + LET1 Public Liability and property damage insurance is also required pursuant to RMC 9‐2‐5B, Minimum Permit  Requirements for Excess Right‐of‐Way Use. a no‐fee permit may be issued only when the applicant is a public agency  and when the proposed use of the right‐of‐ way provides a direct service to the public (e.g., Metro applications for right‐of‐way for bus shelters). 1There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a leasehold interest at the rate  established by the State of Washington 11 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 3. Public Works Fees: (continued) (vi)Actual cost Actual cost 4. Technology Surcharge Fee 5.0% 5.0% 5. Impact Fees: a. School Impact Fees: (i) Issaquah School District (1) Single Family Fee $18,213 $20,291 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $12,043 $8,353 (ii) Kent School District (1) Single Family Fee $5,692.85 $5,818.09 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $2,404.63 $2,457.53 (iii) Renton School District1 (1) Single Family Fee $7,681 $2,659 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU) $4,989 $4,737 (iv) School Impact Fee Administration 5% x School Impact Fee 5% x School Impact Fee b. Transportation Impact Fees:1 (i) Light Industrial, per sq foot $9.50 $9.50 (ii) Apartment, per dwelling & Accessory Dwelling Unit (ADU) $6,717.10 $6,717.10 (iii) Church, per sq foot $5.36 $5.36 (iv) Coffee/Donut Shop, no drive up, per sq foot $221.09 $221.09 (v) Coffee/Donut Shop, with drive up, per sq foot $232.24 $232.24 (vi) Condominium & Duplexes per dwelling $5,645.22 $5,645.22 (vii) Convenience market ‐ 24 hour, per sq foot $221.81 $221.81 (viii) Daycare, per sq foot $48.88 $48.88 (ix) Drinking Place, per sq foot $61.53 $61.53 (x) Drive‐in bank, per sq foot $139.77 $139.77 (xi) Fast food, no drive‐up, per sq foot $141.85 $141.85 (xii) Fast food, with drive‐up, per sq foot $180.72 $180.72 (xiii) Gas station with convenience store, per pump $65,313.08 $65,313.08 (xiv) Gas station, per pump $87,322.30 $87,322.30 (xv) General office, per sq foot $14.58 $14.58 (xvi) Health/fitness club, per sq foot $36.02 $36.02 (xvii) Hospital, per sq foot $7.79 $7.79 (xviii) Hotel, per room $4,287.51 $4,287.51 (xix) Manufacturing, per sq foot $7.15 $7.15 (xx) Marina, per boat berth $2,286.67 $2,286.67 (xxi) Medical office, per sq foot $32.94 $32.94 (xxii) Mini‐warehouse, per sq foot $2.57 $2.57 (xxiii) Mobile home, per dwelling $6,431.27 $6,431.27 (xxiv) Motel, per room $3,930.22 $3,930.22 (xxv) Movie theater, per seat $643.13 $643.13 (xxvi) Nursing home, per bed $1,786.46 $1,786.46 (xxvii) Restaurant: sit‐down, per sq foot $60.95 $60.95 (xxviii) Senior housing ‐ detached, per dwelling $2,929.80 $2,929.80 (xxix) Shopping center, per sq foot $26.58 $26.58 (xxx) Single family house, per dwelling $10,861.69 $10,861.69 (xxxi) Supermarket, per sq foot $65.81 $65.81 (xxxii) Net New PM Peak Hour Person Vehicle Trip (Proposed ‐ Existing), per PM Peak Hour Person Vehicle Trip $7,145.85 $7,145.85 c.Park Impact Fees:1    (i) Single family $2,914.99 $2,914.99 (ii) Multi‐family: 2 units, Duplexes, & Accessory Swelling Unit (ADU) $2,366.28 $2,366.28 (iii) Multi‐family: 3 or 4 units $2,251.97 $2,251.97 (iv) Multi‐family: 5 or more units $1,977.62 $1,977.62 (v) Mobile home $2,069.07 $2,069.07 d.Fire Impact Fees1: (i) Residential ‐ single family (detached dwellings & duplexes), per dwelling unit $829.77 $829.77 (ii) Residential ‐ multi family & Accessory Dwelling Unit (ADU), per dwelling unit $964.53 $964.53 (iii) Hotel/motel/resort, per sq foot $1.29 $1.29 (iv) Medical care hook $3.92 $3.92 (v) Office, per sq foot $0.26 $0.26 (vi) Medical/dental office, per sq foot $1.99 $1.99 (vii) Retail, per sq foot $1.25 $1.25 (viii) Leisure facilities, per sq foot $2.36 $2.36 (ix) Restaurant/lounge, per sq foot $5.92 $5.92 (x) Industrial/manufacturing, per sq foot $0.15 $0.15 (xi) Church, per sq foot $0.56 $0.56 (xii) Education, per sq foot $0.72 $0.72 (xiii) Special public facilities, per sq foot $4.48 $4.48 *(i)‐(ii) is per unit *(iii)‐(xiii) is per square foot e.Independent Fee Calculation Review (or unless otherwise established by School District or Renton Regional Fire Authority) $500 $500 f.Impact Fee Deferral Administration: (i) Each Lot, Single Family Dwelling, or Condominium $85 $85 (ii) Each Multi‐family Building $85 $85 Public Works Reimbursement (any work performed by City forces or under City contract on behalf of a permit  applicant to repair damage to the City infrastructure caused by the permit applicant or contractor under its control,  or any and all roadway or right‐of‐way cleanup efforts performed by City forces or under City contract that resulted  from the work performed by the permit applicant or contractors under its control. An additional technology surcharge shall be required for all fees included in the  following Subsections of Section XII, Development  Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection 2, Land Use Review Fees, except for  appeals, critical areas review fee, and direct EIS costs; Subsections b, e, f, g, h and n of subsection 3, Public Works Fees; and Section  XIII, Fire Department Fire Marshall Fees 12 City of Renton Fee Schedule 2021‐2022 SECTION XII. DEVELOPMENT FEES (CONTINUED)2021 2022 5. Impact Fees: (continued) 6. Miscellaneous Fees a.Multifamily Tax Exemption Application $1,000.00 $1,000.00 b.Tree Fee in lieu  (i) Per diameter inch measured at 4.5 feet above grade $225.00 $225.00 (ii) Labor cost for each 2" caliper (or 6ft tall) tree to be planted $500.00 SECTION XIII. FIRE DEPARMENT FIRE MARSHAL FEES (RFA)2021 2022 a.Fire plan review and inspection fees: (i) $0 to $249.99 $35 $35 (ii) $250.00 to $999.99 $35 + 2%  of the cost $35 + 2%  of the cost (iii) $1,000.00 to $4,999.99 $60 + 2%  of the cost $60 + 2%  of the cost (iv) $5,000.00 to $49,999.99 $175 + 1.5%  of the cost $175 + 1.5%  of the cost (v) $50,000.00 to $99,999.99 $400 + 1.2%  of the cost $400 + 1.2%  of the cost (vi) $100,000.00 and above $900 + .75%  of the cost $900 + .75%  of the cost (vii)$125 $125 (viii) (ix) (x) Preventable Fire alarm fee: (1) First, second, and third preventable alarms N/C N/C (2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm. $75 $75 (3)$150 $150 (xi) Late Payment Penalty $35 $35 b.Fire Permit type: (i)$100 $125 (ii) Permits for Mobile food facilities that have passed a fire and life safety inspection in another jurisdiction that $50 $75 has reciprocity with Renton RFA (iii) Hazardous materials and HPM facilities yearly $175 $200 (iv) Construction permit:  (v) Replacement for lost permit, per each $35 ‐ (vi) (vii) Underground tank removal permit (commercial) See Fire plan review and  construction permit fees See Fire plan review and  construction permit fees (viii) Underground tank removal or abandonment‐in‐ place permit (residential) $84 $109 (ix)$125 $125  (x) NSF check fees $25 $25  (xi)3% 3%RFA technology surcharge fee applied to Fire Department Fire Marshal Fees, subsection a. (i, ii, iii, iv, v, vi) and  subsection b. (iii) 20% of plan review fee ‐ Min.  $52 20% of plan review fee ‐ Min.  $52 Hazardous production materials permit (for businesses storing, handling, or using hazardous production materials as  regulated in the fire code) permit is yearly $175 $200 Other requested inspection when not required by the fire code.  Fee is per hour with a minimum 1 hr when  approved by the Fire Marshal, such as home daycares Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each alarm. Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly (includes items such as  fire special events, covered stages, mobile food facilities, hot works, etc.) Third Re‐Inspection/Pre‐Citation Follow‐Up Inspection when re‐inspections are required beyond the first and second  re‐inspections $250 $250 1 Per Res. 4422, fees for an Accessory Dwelling Unit (ADU) will be waived as of the adoption date of Res. 4422, through December 31, 2022.  Construction Re‐inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if the requested  inspection does not meet the approval of the inspector. Violation/Second Re‐Inspection after 30‐day period (whenever 30 days or more have passed since Fire Department  notification of a violation, which required a first re‐inspection, and such violation has not been remedied or granted  an extension) $150 $150 13