MAPLEWOOD WATER TREATMENT PLANT FILTER MEDIA
REPLACEMENT
August 9, 2022
Questions and Answers
The following are responses to bidder inquiries and unless incorporated into a formal addendum to the
contract, are not part of the contract and are provided for the bidders’ convenience only. The responses
may be considered along with all other information furnished to prospective bidders for the purpose of
bidding on the project. The use of information provided in these Questions and Answers is not to be
construed in any way as a waiver of the provisions nor excuse the contractor from full compliance with
the contract requirements. Bidders are cautioned that subsequent responses or contract addenda may
affect or vary a response previously given and any such subsequent response or addenda should be
taken into consideration when submitting a bid for the project.
1. Question: Are you able to send a plan holder's list, or a list of contractors who have
expressed interest in the project?
Answer: The Current Bidders List for this project can be accessed at the following link:
http://bxwa.com/bxwa_reg/bidders.php?storefront=bxwa&project_num=2022-
002754
2. Question: It is stated that work must start on or after October 1st. When is the latest that
work would be able to start (ie can project be started in Q1 of 2023)?
Answer: The work on this project must be completed by March 31, 2023. Any negotiation
of project start date would be a discussion for after the bid is awarded. The start
date is determined by how quickly the bid can be awarded, how quickly an
agreement can be executed, and then the Notice to Proceed (NTP) is typically
worked out with the contractor to maximize working days.
3. Question: Section 46 61 15 - 3.4.C - Sampling of installed media is generally not
recommended. Once wetted, the properties will change. The referenced
standard: AWWA B604, does not advise sampling of installed media. We can
send a sample of the material that was loaded into the truck with the delivery
driver for analysis.
Answer: In-Place Sampling of the GAC media, as described in Paragraph 3.4C of Section
46 61 15, will not be required if Pre-shipment Verification is performed to the
satisfaction of the Owner and a sample of the material that was loaded into the
Page 2 of 2
delivery truck is provided separately for analysis. The Pre-shipment Verification
must include a test report that contains a statement certifying that the samples
were taken from the media to be furnished for this project and the GAC media to
be delivered complies with the applicable provisions of AWWA B604. The City
will be issuing Addendum #1 to modify Tech Spec 46 61 15 for clarification on
the In-Place Sampling requirement.
4. Question: The Centaur specs identified in the bid documents match Centaur exactly, except
for one item. Centaur is a media that is designed for removal of H2S, but the
stated H2S Capacity of 0.1 g H2S/mL GAC is not actually specification for the
media and is not something that is tested for. We would like to request that this
spec be removed.
Answer: This request to remove the H2S Capacity specification is approved. The City will
be issuing Addendum #1 to modify Tech Spec 46 61 15 to remove the H2S
Capacity specification.
End of Questions and Answers (8/9/2022)