HomeMy WebLinkAboutMFP22004410.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22004410
IVR Number: 22004410
Permit Information
Permit Name: Comcast Cable Franchise Permit-- JB0001088695
Address/Location:08/18/2022Application Date:0423059155Parcel Number: 3123 NE SUNSET BLVD
Permit Type:09/06/2022Issue Date:Franchise
Permit Work Class:09/06/2023Expiration Date:Minor Utility
Job Number: JB0001088695Franchise Type:Cable
Description: Comcast JB0001088695 TIE IN TO EXISTING COAX. INSTALL (1) 2" RISER PER DETAIL #S 1 & 2 ON SHEET 4.
PULL (1) 0.625 COAX CABLE THROUGH. TRENCH (1) 4" CONDUIT PER DETAIL #S 3 & 4 ON SHEET 4. PULL (1)
0.625 COAX CABLE THROUGH. SET UP (1) BORE PIT. BORE (1) 4" CONDUIT. PULL (1) 0.625 COAX CABLE
THROUGH. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
ApplicantX
Corrie Lamb
Comcast
2525 Beaufort Dr.
Modesto, CA 95355
Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
Contact
Andrew Parker
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (253) 225-0596Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
Electrical Contractor: CANNOCI873CL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0001088695
Corrie Lamb
209-985-3769
Corrie_lamb@comcast.com
3123 Sunset Blvd NE, Renton, WA 98056 Kiddies Adventures
Tie in to existing splice case, Install new riser, trench 4" conduit into roadway (NE 12th St),
Set-up bore pits & bore 4" conduit & pull new 0.625 coax cable through
23' TRENCH 122' BORE
Cannon Construction LLC 253-922-2787
601590363 20838
08/18/2022
Scott Warlick 9/6/2022
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP22004410
DEPARTMENT OF PUBLIC WORKS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 1 of 2 | Published: 11/25/2019
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN (TCP) APPLICATION
Published: 11/25/2019
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL NO LATER THAN FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a TCP and
obtain City of Renton's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
TO THE APPLICANT: Submit the TCP application form and required submittal documents to
TCP@rentonwa.gov with the subject line “TCP Application – [Project Name]” or the above address.
The following items, electronic copies preferred, are all required for submittal of the TCP Application:
1.☐ A copy of the Traffic Control Plan (TCP) Application form.
2.☐ A copy of the required TCP layout, preferred 11” X 17” paper size format, which shall:
☐Include map(s) showing the location of the project and work area.
☐Be legible lettering and clear, contrasting, symbols of viewing or printing.
☐Must indicate street names, and north arrow and scale.
☐All signs and detour routes shall conform to the MUTCD, WSDOT TCPs, and the Washington State
Traffic Control Flagger Certification handbook, by the Evergreen Safety Council.
☐Types of plans required:
☐Work hour plan – show all mobility impacts during construction hours.
☐Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
☐Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
☐Pedestrian access/detour plan, if applicable.
Project Name: ______________________________________________ Permit #: _____________________
Project Address: ____________________________________________________________________________
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Description of Work, Work Schedule, Equipment Used: _____________________________________________
___________________________________________________________________________________________
___________________________________________________________________________________________
Construction Company: ________________________________________ Phone/Cell: (_____) _____-________
Applicant Name: _________________________________ Email: ______________________________________
Business Address: _________________________________ City/State: __________________ Zip: __________
Approved By: _______________________________________________ Date: ________________________
Transportation Operations Engineering
Kiddies Adventures
3123 Sunset Blvd NE, Renton, WA 98056
6:00 am 4:00 pm
Tie in to existing splice
case, Install new riser, trench 4" conduit into roadway
Set-up bore pits & bore 4" conduit & pull new 0.625 coax
Cannon Construction LLC 253 922 2787
Corrie Lamb corrie_lamb@comcast.com
410 Valley Ave NW, Puyallup WA 98371
MFP22004410
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 9/6/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 2 | Published: 11/25/2019
APPLICANT AGREES TO ALL THE FOLLOWING:
•TCP must be approved prior to commencing the work, and all permit conditions shall be met.
•Existing pedestrian access shall be maintained. The work on pedestrian facilities shall be limited to one corner
at a time, with the least possible inconvenience or delay to pedestrians.
•Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or
slippery road conditions during work and non-work hours.
•The start of Work Time begins when any street or travel lane is fully/partially closed or impacts the follow of
traffic. This includes set up within the traveled way or immediately adjacent to the roadway.
•Emergency services (253-852-2121) shall be notified twenty-four (24) hours before any street or lane closures.
•Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including
public transit, to be affected by a temporary lane or road closure.
•TCP for all street and/or lane closures shall be implemented and performed in compliance with the Manual on
Uniform Traffic Control Devices (MUTCD) and/or State of Washington Department of Transportation (WSDOT)
and all traffic regulations of the City of Renton and Revised Code of Washington (RCW).
•Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of RCW 47.36.200 Signs or
Flaggers at thoroughfare work sites and RCW 9A.36.050 Reckless Endangerment, and other applicable State
and City codes.
•Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles
and the acts of the Applicant’s agents and employees.
•The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and
in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s
reasonable attorney’s fees and litigation costs incurred resulting from such claim.
•In the event any claim or suit is brought against the City within the scope of this Agreement, Applicant will pay
for legal counsel chosen by the City to defend against same.
•Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
•Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
•Approved Temporary TCP must be at the work site during work hours.
•Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
•Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
•Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations
for vacate parking or curb lane usage.
•Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
•The cover sheet of this TCP form must be attached to each Temporary No Parking Sign on the project site.
•Temporary traffic control devices must be removed immediately when work is done or no construction
activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance
shop (3555 NE 2nd Street; 425-430-7423).
_______________________________ _______________________________ _______________________
Applicant’s Signature Print Name Date
David Standring 08/18/2022
3233
3155
3224
3002
3218
3011
3123
3116
NE 12TH ST
NE 12TH ST
NE SUNSET BLVDLYNNWOOD AVE NENE 12TH ST
EOPEOPEOPEOPEOPEOPEOPEOPEO
PEOP EOP
EOP EOPEOP EOPEOP EOP
EOP
EOP EOPEOP
EOP EOPEOP EOPEOP EOPEOP EOPEOP
EOP EOP EOP EOP EOP EOP EOP EOP
E
O
P
EOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
EOP EOP EOP EOP EOP EOP
EOP EOPEOP EOPEOPEOP EOPEOP EOPEOP EOPS/W S/W S/W S/W S/W S/W S/W
S/WS/W S/W
S/W S/W
S/WS/W
S/WS/W
EOPEO
P
EOPEOPEOP
EOPEOP
EOP EOPEOP EOPS/W S/W S/W
S/W S/W
S/W S/W S/WS/
W
S/WS/WS/W
S/WS/WS/WS/WS/WS/WS/WS/WS/W S/W
S/W S/W
S/W
S/WS/WS/W
S/W
S/W
S/W
FL
FL FL FL FL FL
S/W S/W S/W S/W S/W S/W S/W S/W
S/WS/WS/WS/WS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOPEOP EOP EOP EOP EOP EOP
S/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/W S/W S/W S/W S/W S/WNE SUNSET BLVDROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW
ROW
ROW
ROW
ROW
ROW ROW ROW ROW ROW ROWROW
ROW
ROW
ROW
ROWROW
ROW
ROW
ROWROW
ROW
ROWROW
ROWROWROW
ROW ROW ROW ROW ROW ROW
RO
W
ROWROWROW
ROW
ROW
ROW
ROW ROW ROW ROW
ROW
ROW
ROW ROW ROW
ROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROW ROW ROW ROW ROW
R25'S/W
DWY
DWY
DWY DWY
PEDESTRIANSPOTTER
WT XXXX
XXXWORK AREA MAINTAIN ACCESS
TO CROSSWALK
R2-1
R2-1
R2-1
R2-1
R2-1
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
/
PM CONTACT INFORMATION:
DRAWN BY:
PROJECT MANAGER:
N
S
EW
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCChristopher White
(P): (253) 348-9733
(E): cwhite@teamcannon.comJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
TRAFFIC CONTROL
1 1
TRAFFIC CONTROL PLAN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform to the
specifications stated in the federal Manual on Uniform Traffic Control Devices
(M.U.T.C.D)
Cities and various municipalities may have also adopted specialized guidelines
for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
- Will coordinate with any businesses that will be affected by construction
- Temporary "NO PARKING" signs to be placed at least 72 hours prior to work
- Driveway access will be maintained unless otherwise noted
- Sidewalk of 4' width will be maintained for pedestrian access unless
otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective
FLAGGERSPOTTERLEGEND
Work Vehicle Truck Mounted Attenuator
Flagger Spotter
WT
Work Area Traffic Safety Cone/Drum
WT
WORK TYPE:
CONTROL TYPE:
UNDERGROUND WORK
SINGLE LANE CLOSURE
2 - LANE ROAD
CONTACT TRANSIT AUTHORITY 72
HOURS PRIOR TO START OF WORK
FOR TEMPORARY RELOCATION OF
BUS STOP
PLACE ON BOTH SIDES
OF WORK AREA
CANNON CONSTRUCTION LLC
CONTRO
L
S
U
P
E
R
V
I
S
O
R
C E R T I F I E D T R A F F IC
TREVOR
H
O
U
S
D
E
N
#012734 EX
P
.
3
/
3
1
/
2
0
2
5
CANNON CONSTRUCTION LLC
CONTRO
L
S
U
P
E
R
V
I
S
O
R
C E R T IF IE D T R A F F IC
TREVOR
H
O
U
S
D
E
N
#012734 E
X
P
.
3
/
3
1
/
2
0
2
5
MFP22004410
5
PROJECT MAP:
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION =
DISTRIBUTION =
1
0
0
0
1
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
SITE ADDRESS:
3123 Sunset Blvd NE
Renton, WA 98056
CONTACTS:
CANNON COMPANIES
Christopher White - (253) 348-9733 - cwhite@teamcannon.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
BUSINESS/JOB CONTACT
POC: Yvonne Yeager - (253) 218-2288
EMAIL: yvonne@oakhillsbuilds.com
SCOPE OF WORK:
JB0001088695
Kiddie Adventures
SMB
SHEET INDEX
1 -COVER
2 -GENERAL NOTES
3 -LEGEND
4 -DETAILS
5 -CONSTRUCTION PLAN
6 -RESTORATION PLAN
7 -TRENCH/BORE PROFILE
- TIE IN TO EXISTING COAX
- INSTALL (1) 2" RISER PER DETAIL #S 1 & 2 ON SHEET 4. PULL (1) 0.625 COAX CABLE THROUGH
- TRENCH (1) 4" CONDUIT PER DETAIL #S 3 & 4 ON SHEET 4. PULL (1) 0.625 COAX CABLE THROUGH
- SET-UP (1) BORE PIT
- BORE (1) 4" CONDUIT. PULL (1) 0.625 COAX CABLE THROUGH
N
S
EW
*ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER =
TOTAL ROW FOOTAGE =
FT.
FT.
FT.
FT.
FT.
FT.
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
FT.
FT.
FT.
FT.
FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE = FT.
0
0
145
0
(1)25
170
0
0
0
0
0
170
FT.625 COAX 170
MFP22004410
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO
CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS
NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT
THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE
NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD.
THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND
IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE
IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH
MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL,
ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE
OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES
TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES
AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO
DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO
PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY
OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY
AND NOT BE LIMITED TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR
WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT
PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS
OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL
MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE
ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A
SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING
NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES
AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE
EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE
MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL
BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX
351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN
TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36"
WITH A MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED,
PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP
CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL
ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE
SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL
ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD
SPECIFICATIONS OF EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT
CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN
ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED
PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED
AND WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED
PRIOR TO CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF
WASHINGTON'S WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING
UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE
REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO
POWER MAIN WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND
REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS
IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
GENERAL NOTES
2 7
SCALE:
NO
SCALE
MFP22004410
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
LEGEND
3 7
SCALE:
NO
SCALE
MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS
LANE LINE
CENTER LINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT
RIGHT OF WAY
SIDEWALK
FENCE
GUARD RAIL
POWER
TRAFFIC SIGNAL
COMMUNICATION
TELECOMMUNICATION
SEWER MAIN
SIDE SEWER
DRAIN MAIN
DRAINAGE DITCH
GAS
OIL
STEAM
WATER
UNKNOWN UTILITY
STRAW WATTLES
TRAFFIC CONES
PROPOSED NEW CONDUIT
PROPOSED NEW STRUCTURE
PROPOSED NEW AERIAL STRAND
FL FL
EOP EOP
ROW ROW
S/W S/W
U U U U
P P
TS TS
C C
T T
S S
SS SS
D D
DD DD
G G
OIL OIL
ST ST
W W
UNK UNK
EXISTING CONDUIT/INFRASTRUCTURE
EXISTING AERIAL
UTILITY POLE (EXIST / NEW)
STREET LIGHT
CROSS WALK SIGNAL
SHRUBBERY
TREE
CATCH BASIN
CATCH BASIN W/ SOCK
MANHOLE
UTILITY VALVE
WATER METER
UTILITY RISER (EXIST / NEW)
CB
CB
V
M
CW
SL
R
FIRE HYDRANTFH
MH
17X30 VAULT
24X36 VAULT
36X48 VAULT
4X4 VAULT
25-TA VAULT
233-LA
444-LA
253-TA VAULT
35-TA VAULT
UNK VAULT (SIZE MAY VARY)
DH
DH
DOG HOUSE
TIGER HOUSE
P PEDESTAL
EXISTING SPLICE CASE
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
DISTANCE DIMENSION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION PAGE
WORK BEING DONE1LOCATION
PHOTO NOTE CALLOUT
PHOTO LOCATOR/ORIENTATION
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPE
LIMITS OF RESTORATION
#
NEW SPLICE CASE
NEW STORAGE
FOOTAGE NOTE
FOOTAGE NOTE OVER(339')
339'
MULTIPLE SHEETS
CALLOUT
GRAVEL
BRICK/COBBLE
200'
PARCEL LINES
BOREPIT
BOREPIT (SIZE MAY VARY)
N
S
EW
BUILDING OUTLINE
UTILITY POTHOLE
STREET SIGN
NORTH ARROW
LANE DIRECTION INDICATOR
#
POLE ANCHOR/GUY PROPOSED
CROSSWALK
R
POLE # CALLOUT#
MFP22004410
TRENCH - SOFT SURFACE
STANDARD DETAIL
PROPOSED CONDUIT6"-12"
18"
18"
36"
EXISTING SOFT
SURFACE MAGNETIC LOCATOR TAPE
(ENTIRE TRENCH LENGTH)
BACKFILL COMPACTED TO
95% OF MAXIMUM
RELATIVE DENSITY OR
STONEWAY MIX 1004.
SURFACE RESTORATION
CONTRACTOR TO VERIFY
SPECIFICATION WITH LOCAL
JURISDICTION
3UTILITY POLE RISER -
STANDARD DETAIL
(1) 10' PVC CONDUIT
SECTIONS
15" HDG POLE BRACKET W/
PIPE CLAMP (B2017 BY
POWER-STRUT OR EQUAL) 4"
MIN OFFSET FROM POLE.22' (TYP)(1) 10' PVC CONDUIT
SECTIONS
EXISTING SURFACE24' (TYP)PROPOSED CABLE
EXISTING AERIAL
POWER
EXISTING UTILITY POLEVARIES
1#
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
DETAILS
4 7
SCALE:
NO
SCALE
RISER PLACEMENT
STANDARD DETAIL
LOCATION
1
CONDUIT
UP TO 2 CONDUITS
STANDOFF BRACKET
15" MIN LENGTH
℄
℄
DIRECTION OF VEHICULAR TRAFFIC
PLAN VIEW
LOCATION
2
LOCATION
4
LOCATION
3
CONDUIT CLAMP
5" MIN
2
6"CONCRETE TRENCH DETAIL
STANDARD DETAIL
8" MIN CONCRETE (MATCH
EX IF GREATER
PANEL WIDTH PER PLAN
12" MIN.12" MIN
6" MIN COMPACT
MINERAL AGGREGATE
TYPE 2
COMPACTED
BACKFILL3' MIN.24"
12"
EX CONCRETE
SURFACE
REPLACE EX CURB PER
STD PLAN 410C
ZONE OF INFLUENCE
4 POTHOLE REPAIR DETAIL
STANDARD DETAIL
AC (4"MIN) WITH 0.5"
MAX AGGREGATE PER
CITY STANDARD
12" MIN.
12"Ø POTHOLE
36"
NATIVE BACKFILL
MATERIAL
CFD PER CITY
STANDARD
12" MIN.
TYP.
TYP.
SAW CUTEXISTING AC
12" MIN.36"
UTILITY
5
MFP22004410
SSSSSSSSSSSSSSSSSSSSSSS
S
SSSSSSSSS
SSSSSSSSSSSSSSDDDDDDDDDDDDDDDDDDDDDDDDDDFH
W
W W W
WWWWWWWWW
WWWWWWWWW
W W W W W W
WM
M
M
M
V
V
VV
32183123
LYNNWOOD AVE NENE 12TH ST
EOPEOPEOPEOPEOPEOPEOPEOPE
O
PEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP
EOP
EOPEOPS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/W
S/WS/W
S/W S/W S/W S/W S/W S/W S/W S/W
S/WS/WNE SUNSET BLVDROWROWROWROWROWROWROWROWROWROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWCB
CB
CBCBTSTSR25'S/W
SL
PPPPP
PPPPPPPP
PPPPPPCWTSCBP
PV
DWY
DWY
GGGGGGGGGGGG
GGGCCBOREPIT
BOREPIT
122'
14'
9'STA 10+50STA 11+00STA 11+50STA 12+00STA 12+50STA 12+36STA 11+14TRAFFIC LOOPS TRAFFIC LOOPS
1
2
3
4
5
4
5
5'
4'
2'
5'
3'
1
CONSTRUCTION NOTES:
TIE IN TO EXISTING COAX
INSTALL (1) 2" RISER PER DETAIL #S 1 & 2 ON
SHEET 4. PULL (1) 0.625 COAX CABLE THROUGH
TRENCH (1) 4" CONDUIT PER DETAIL #S 3 & 4 ON
SHEET 4. PULL (1) 0.625 COAX CABLE THROUGH
SET-UP (1) BORE PIT
BORE (1) 4" CONDUIT. PULL (1) 0.625 COAX
CABLE THROUGH
2
3
4
5
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
CONSTRUCTION PLAN
5 7
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
LOCATION
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SUNSET BLVD NE & NE 12TH ST
SCALE:
0'10'20'
N
S
EW
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP22004410
SSSSSSSSSSSSSSSSSSSSSSS
S
SSSSSSSSS
SSSSSSSSSSSSSSDDDDDDDDDDDDDDDDDDDDDDDDDDFH
W
W W W
WWWWWWWWW
WWWWWWWWW
W W W W W W
WM
M
M
M
V
V
VV
32183123
LYNNWOOD AVE NENE 12TH ST
EOPEOPEOPEOPEOPEOPEOPEOPE
O
PEOP EOPEOP EOP EOP EOP EOP EOP EOP EOP
EOP
EOPEOPS/WS/WS/WS/WS/WS/WS/WS/WS/WS/WS/W
S/WS/W
S/W S/W S/W S/W S/W S/W S/W S/W
S/WS/WNE SUNSET BLVDROWROWROWROWROWROWROWROWROWROW
ROW ROW ROW ROW ROW ROW ROW ROW
ROWROWCB
CB
CBCBTSTSR25'S/W
SL
PPPPP
PPPPPPPP
PPPPPPCWTSCBP
PV
DWY
DWY
GGGGGGGGGGGG
GGGCCBOREPIT
BOREPIT
122'
14'
9'STA 10+50STA 11+00STA 11+50STA 12+00STA 12+50STA 12+36STA 11+14TRAFFIC LOOPS TRAFFIC LOOPS
1R
2R
2R
2'
4'4'3R
3R
4'4'
1R
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF RENTON'S
SPECIFICATIONS.
RESTORE ASPHALT CONCRETE ROADWAY PER
CITY OF RENTON'S SPECIFICATIONS.
RESTORE POTHOLE LOCATIONS PER CITY OF
RENTON'S SPECIFICATIONS
2R
3R
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
RESTORATION PLAN
6 7
SCALE:
0'10'20'
N
S
EW
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
LOCATION
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SUNSET BLVD NE & NE 12TH ST
MFP22004410
0
5
10
15
20
25
30
5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150STA 11+50STA 12+00STA 12+36STA 11+14ROWEXIT R.O.W.
3'
UNK Ø POWER
CONDUITS
@ UNK DEPTHSUNK Ø WATER
@ UNK DEPTHS
1'
MIN
1'
MIN
EXISTING POLE
NEW 2" RISER
BOREPIT
CONDUIT PIVOT
BOREPIT
CONDUIT PIVOT
SCALE:
HORIZONTAL:
VERTICAL:
1" = 10'
1" = 10'
N
S
EW
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001088695Kiddie Adventures3123 Sunset Blvd NERenton, WA 98056SMB17-050
08/18/2022
C.White
T.Housden
TRENCH/BORE PROFILE
7 7UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
136TH PL NE & NE 20TH ST
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SUNSET BLVD NE & NE 12TH ST
MFP22004410
Pothole all existing
utilities