Loading...
HomeMy WebLinkAboutC_Kenworth Styling Bridge_Responce Letter_220909_v2September 9th, 2022 Renton Planning Building Department 1055 S Grady Way Renton, WA 98057 Att: Alan Findlay, P.E. Building Plan Reviewer 425.827.2100 freiheitarch.com 777 108th Avenue NE Suite 1650 Bellevue, WA 98004 Revision 1 - Response Letter Building Permit Structural Plan Review – First Submittal 485 Houser Way N Renton Permit # B22004586 Thank you for your review of the Kenworth Styling Bridge Alteration, Please find below responses to comments received 09.31.2022 In addition to our written response below, we have updated our drawings clouding and dating them Revision 1. City Comments 1. Special Inspection Form. Due to the geotechnical work (such as the helical pile work) and concrete work, please complete and submit the City of Renton’s special inspection form. Special inspections form submitted for review. 2. The submitted drawings refer to structural drawings to clarify and define the scope or work. These structural drawings were no submitted to the City for this review cycle. Below are images from Sheet A6.00 and SP1 respectively with our redlined comments. Please submit the structural drawings for review. Additional comments may be generated based on these structural drawings. See IBC Sections 107.2.1, 1603.1, and 1604.2. See updated Plan set “P_Kenwoth Styling Bridge_Plans_220826_v2” with added structural drawings and updated SP1. Thank you for your time and effort on this project. If you have any questions, or are in need of any additional information, please do not hesitate to contact us. Sincerely, Ricky Kennedy Architectural Designer Freiheit Architecture