Loading...
HomeMy WebLinkAboutPermitDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Building Permit: B22004586 IVR Number: 22004586 Permit Information Permit Name: KENNWORTH R&D ALTERATION Address/Location:08/29/2022Application Date:7223000010Parcel Number: 485 HOUSER WAY N Permit Type:09/15/2022Issue Date:$10,200Total Valuation: BLD - BUILDING Permit Work Class:09/15/2023Expiration Date:2,910Total Square Feet: Commercial - Alteration Description: DEMOLITION AND EXPANSION OF RECESSED EQUIPMENT TO EXISTING SLAB ON GRADE. Contacts Name Address PhoneTypeBilling RICHARD KENNEDY FREIHEIT ARCHITECTURE 777 108th ave ne STE 1650, STE 1650 Belleuve, WA 98004 ContactX John Ask General Mechanical 2316 S State St TACOMA, WA 98405 Contractor Business License Number: 34380Construction Contractor: GENERM*306QF Steve Paul Howard S Wright 415 1st Ave N, 400 Seattle, WA 98109 C: (206) 794-2240Owner General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. Ÿ Call 425.430.7202 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Building Permit: B22004586 IVR Number: 22004586 Inspections -Call (425) 430-7202 or go to: https://permitting.rentonwa.gov to schedule an inspection. -Call before work is concealed or concrete poured. -Do not pour concrete until approved. -Do not cover until approved. -Do not occupy until final inspection is complete. -Final inspection is required. Number CommentsInspectorDateDescription Erosion Control Inspection105 Footing Inspection110 Foundation Inspection111 Underfloor Inspection156 Shearwall and GWB Nailing Inspection113 Roof Inspection115 Framing Inspection112 Insulation Inspection114 Ceiling Inspection116 Landscaping Inspection118 Critical Areas Inspection124 Other Building Inspection108 Final Inspection104 Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES