AGREEMENTFORCONSTRUCTIONMANAGEMENTSERVICES
FORBRONSONWAYBRIDGE–SEISMICRETROFITAND
PAINTINGPROJECTCAGͲ22Ͳ255
THISAGREEMENT,datedforreferencepurposesonlyasSeptember15,2022,isbyandbetween
theCityofRenton(the“City”),aWashingtonmunicipalcorporation,andTranTechEngineering,
LLC(“Consultant”),aWashingtoncorporation.TheCityandtheConsultantarereferredto
collectivelyinthisAgreementasthe“Parties.”OncefullyexecutedbytheParties,thisAgreement
iseffectiveasofthelastdatesignedbybothparties.
1.ScopeofWork:Consultantagreestoprovideconstructionmanagementservicesas
specifiedinExhibitA,whichisattachedandincorporatedhereinandmayhereinafterbe
referredtoasthe“Work.”
2.ChangesinScopeofWork:TheCity,withoutinvalidatingthisAgreement,mayorder
changestotheWorkconsistingofadditions,deletionsormodifications.Anysuchchanges
totheWorkshallbeorderedbytheCityinwritingandtheCompensationshallbe
equitablyadjustedconsistentwiththeratessetforthinExhibitsDandE1orasotherwise
mutuallyagreedbytheParties.
3.TimeofPerformance:ConsultantshallcommenceperformanceoftheAgreement
pursuanttotheschedule(s)setforthinExhibitA.AllWorkshallbeperformedbynolater
thanDecember31,2027.
4.Compensation:
A.Amount.TotalcompensationtoConsultantforWorkprovidedpursuanttothis
Agreementshallnotexceed$34,900,plusanyapplicablestateandlocalsalestaxes.
CompensationshallbepaidbaseduponWorkactuallyperformedaccordingtothe
rate(s)oramountsspecifiedinExhibitsDandE1.TheConsultantagreesthatany
hourlyorflatratechargedbyitforitsWorkshallremainlockedatthenegotiated
rate(s)unlessotherwiseagreedtoinwritingorprovidedinExhibitsDandE1.Except
asspecificallyprovidedherein,theConsultantshallbesolelyresponsibleforpayment
ofanytaxesimposedasaresultoftheperformanceandpaymentofthisAgreement.
B.MethodofPayment.Onamonthlyornolessthanquarterlybasisduringanyquarter
inwhichWorkisperformed,theConsultantshallsubmitavoucherorinvoiceinaform
CAG-22-255
PAGE2OF10
specifiedbytheCity,includingadescriptionofwhatWorkhasbeenperformed,the
nameofthepersonnelperformingsuchWork,andanyhourlylaborchargeratefor
suchpersonnel.TheConsultantshallalsosubmitafinalbilluponcompletionofall
Work.PaymentshallbemadebytheCityforWorkperformedwithinthirty(30)
calendardaysafterreceiptandapprovalbytheappropriateCityrepresentativeofthe
voucherorinvoice.IftheConsultant’sperformancedoesnotmeettherequirements
ofthisAgreement,theConsultantwillcorrectormodifyitsperformancetocomply
withtheAgreement.TheCitymaywithholdpaymentforworkthatdoesnotmeetthe
requirementsofthisAgreement.
C.EffectofPayment.PaymentforanypartoftheWorkshallnotconstituteawaiverby
theCityofanyremediesitmayhaveagainsttheConsultantforfailureofthe
ConsultanttoperformtheWorkorforanybreachofthisAgreementbythe
Consultant.
D.NonͲAppropriationofFunds.Ifsufficientfundsarenotappropriatedorallocatedfor
paymentunderthisAgreementforanyfuturefiscalperiod,theCityshallnotbe
obligatedtomakepaymentsforWorkoramountsincurredaftertheendofthe
currentfiscalperiod,andthisAgreementwillterminateuponthecompletionofall
remainingWorkforwhichfundsareallocated.Nopenaltyorexpenseshallaccrueto
theCityintheeventthisprovisionapplies.
5.Termination:
A.TheCityreservestherighttoterminatethisAgreementatanytime,withorwithout
causebygivingten(10)calendardays’noticetotheConsultantinwriting.Intheevent
ofsuchterminationorsuspension,allfinishedorunfinisheddocuments,data,studies,
worksheets,modelsandreports,orothermaterialpreparedbytheConsultant
pursuanttothisAgreementshallbesubmittedtotheCity,ifanyarerequiredaspart
oftheWork.
B.IntheeventthisAgreementisterminatedbytheCity,theConsultantshallbeentitled
topaymentforallhoursworkedtotheeffectivedateoftermination,lessallpayments
previouslymade.IftheAgreementisterminatedbytheCityafterpartialperformance
ofWorkforwhichtheagreedcompensationisafixedfee,theCityshallpaythe
Consultantanequitableshareofthefixedfee.Thisprovisionshallnotpreventthe
Cityfromseekinganylegalremediesitmayhavefortheviolationornonperformance
ofanyoftheprovisionsofthisAgreementandsuchchargesduetotheCityshallbe
deductedfromthefinalpaymentduetheConsultant.Nopaymentshallbemadeby
theCityforanyexpensesincurredorworkdonefollowingtheeffectivedateof
terminationunlessauthorizedinadvanceinwritingbytheCity.
PAGE3OF10
6.WarrantiesAndRightToUseWorkProduct:Consultantrepresentsandwarrantsthat
ConsultantwillperformallWorkidentifiedinthisAgreementinaprofessionaland
workmanlikemannerandinaccordancewithallreasonableandprofessionalstandards
andlaws.Compliancewithprofessionalstandardsincludes,asapplicable,performingthe
WorkincompliancewithapplicableCitystandardsorguidelines(e.g.designcriteriaand
StandardPlansforRoad,BridgeandMunicipalConstruction).Professionalengineersshall
certifyengineeringplans,specifications,plats,andreports,asapplicable,pursuantto
RCW18.43.070.Consultantfurtherrepresentsandwarrantsthatallfinalworkproduct
createdforanddeliveredtotheCitypursuanttothisAgreementshallbetheoriginalwork
oftheConsultantandfreefromanyintellectualpropertyencumbrancewhichwould
restricttheCityfromusingtheworkproduct.ConsultantgrantstotheCityanonͲ
exclusive,perpetualrightandlicensetouse,reproduce,distribute,adapt,modify,and
displayallfinalworkproductproducedpursuanttothisAgreement.TheCity’sorother’s
adaptation,modificationoruseofthefinalworkproductsotherthanforthepurposesof
thisAgreementshallbewithoutliabilitytotheConsultant.Theprovisionsofthissection
shallsurvivetheexpirationorterminationofthisAgreement.
7.RecordMaintenance:TheConsultantshallmaintainaccountsandrecords,which
properlyreflectalldirectandindirectcostsexpendedandWorkprovidedinthe
performanceofthisAgreementandretainsuchrecordsforaslongasmayberequiredby
applicableWashingtonStaterecordsretentionlaws,butinanyeventnolessthansix
yearsaftertheterminationofthisAgreement.TheConsultantagreestoprovideaccess
toandcopiesofanyrecordsrelatedtothisAgreementasrequiredbytheCitytoaudit
expendituresandchargesand/ortocomplywiththeWashingtonStatePublicRecordsAct
(Chapter42.56RCW).Theprovisionsofthissectionshallsurvivetheexpirationor
terminationofthisAgreement.
8.PublicRecordsCompliance:TothefullextenttheCitydeterminesnecessarytocomply
withtheWashingtonStatePublicRecordsAct,Consultantshallmakeaduediligentsearch
ofallrecordsinitspossessionorcontrolrelatingtothisAgreementandtheWork,
including,butnotlimitedto,eͲmail,correspondence,notes,savedtelephonemessages,
recordings,photos,ordrawingsandprovidethemtotheCityforproduction.Intheevent
Consultantbelievessaidrecordsneedtobeprotectedfromdisclosure,itmay,at
Consultant’sownexpense,seekjudicialprotection.Consultantshallindemnify,defend,
andholdharmlesstheCityforallcosts,includingattorneys’fees,attendanttoanyclaim
orlitigationrelatedtoaPublicRecordsActrequestforwhichConsultanthasresponsive
recordsandforwhichConsultanthaswithheldrecordsorinformationcontainedtherein,
ornotprovidedthemtotheCityinatimelymanner.Consultantshallproducefor
distributionanyandallrecordsresponsivetothePublicRecordsActrequestinatimely
manner,unlessthoserecordsareprotectedbycourtorder.Theprovisionsofthissection
shallsurvivetheexpirationorterminationofthisAgreement.
PAGE4OF10
9.IndependentContractorRelationship:
A.TheConsultantisretainedbytheCityonlyforthepurposesandtotheextentsetforth
inthisAgreement.ThenatureoftherelationshipbetweentheConsultantandtheCity
duringtheperiodoftheWorkshallbethatofanindependentcontractor,not
employee.TheConsultant,nottheCity,shallhavethepowertocontrolanddirectthe
details,mannerormeansofWork.Specifically,butnotbymeansoflimitation,the
Consultantshallhavenoobligationtoworkanyparticularhoursorparticular
schedule,unlessotherwiseindicatedintheScopeofWorkorwhereschedulingof
attendanceorperformanceismutuallyarrangedduetothenatureoftheWork.
ConsultantshallretaintherighttodesignatethemeansofperformingtheWork
coveredbythisagreement,andtheConsultantshallbeentitledtoemployother
workersatsuchcompensationandsuchotherconditionsasitmaydeemproper,
provided,however,thatanycontractsomadebytheConsultantistobepaidbyit
alone,andthatemployingsuchworkers,itisactingindividuallyandnotasanagent
fortheCity.
B.TheCityshallnotberesponsibleforwithholdingorotherwisedeductingfederal
incometaxorSocialSecurityorcontributingtotheStateIndustrialInsurance
Program,orotherwiseassumingthedutiesofanemployerwithrespecttoConsultant
oranyemployeeoftheConsultant.
C.IftheConsultantisasoleproprietorshiporifthisAgreementiswithanindividual,the
ConsultantagreestonotifytheCityandcompleteanyrequiredformiftheConsultant
retiredunderaStateofWashingtonretirementsystemandagreestoindemnifyany
lossestheCitymaysustainthroughtheConsultant’sfailuretodoso.
10.HoldHarmless:TheConsultantagreestorelease,indemnify,defend,andholdharmless
theCity,electedofficials,employees,officers,representatives,andvolunteersfromany
andallclaims,demands,actions,suits,causesofaction,arbitrations,mediations,
proceedings,judgments,awards,injuries,damages,liabilities,taxes,losses,fines,fees,
penalties,expenses,attorney’sorattorneys’fees,costs,and/orlitigationexpensestoor
byanyandallpersonsorentities,arisingfrom,resultingfrom,orrelatedtothenegligent
acts,errorsoromissionsoftheConsultantinitsperformanceofthisAgreementora
breachofthisAgreementbyConsultant,exceptforthatportionoftheclaimscausedby
theCity’ssolenegligence.
ShouldacourtofcompetentjurisdictiondeterminethatthisagreementissubjecttoRCW
4.24.115,(Validityofagreementtoindemnifyagainstliabilityfornegligencerelativeto
construction,alteration,improvement,etc.,ofstructureorimprovementattachedtoreal
estate…)then,intheeventofliabilityfordamagesarisingoutofbodilyinjurytopersons
ordamagestopropertycausedbyorresultingfromtheconcurrentnegligenceofthe
PAGE5OF10
ConsultantandtheCity,itsofficers,officials,employeesandvolunteers,Consultant’s
liabilityshallbeonlytotheextentofConsultant’snegligence.
Itisfurtherspecificallyandexpresslyunderstoodthattheindemnificationprovidedin
thisAgreementconstituteConsultant’swaiverofimmunityundertheIndustrial
InsuranceAct,RCWTitle51,solelyforthepurposesofthisindemnification.TheParties
havemutuallynegotiatedandagreedtothiswaiver.Theprovisionsofthissectionshall
survivetheexpirationorterminationofthisAgreement.
11. GiftsandConflicts:TheCity’sCodeofEthicsandWashingtonStatelawprohibitCity
employeesfromsoliciting,accepting,orreceivinganygift,gratuityorfavorfromany
person,firmorcorporationinvolvedinacontractortransaction.Toensurecompliance
withtheCity’sCodeofEthicsandstatelaw,theConsultantshallnotgiveagiftofanykind
toCityemployeesorofficials.ConsultantalsoconfirmsthatConsultantdoesnothavea
businessinterestoraclosefamilyrelationshipwithanyCityofficeroremployeewhowas,
is,orwillbeinvolvedinselectingtheConsultant,negotiatingoradministeringthis
Agreement,orevaluatingtheConsultant’sperformanceoftheWork.
12. CityofRentonBusinessLicense:UnlessexemptedbytheRentonMunicipalCode,t
ConsultantshallobtainaCityofRentonBusinessLicensepriortoperforminganyWork
andmaintainthebusinesslicenseingoodstandingthroughoutthetermofthis
agreementwiththeCity.
Informationregardingacquiringacitybusinesslicensecanbefoundat:
https://www.rentonwa.gov/Tax
InformationregardingStatebusinesslicensingrequirementscanbefoundat:
https://dor.wa.gov/doingͲbusiness/registerͲmyͲbusiness
13. Insurance:Consultantshallsecureandmaintain:
A. Commercialgeneralliabilityinsuranceintheminimumamountsof$1,000,000for
eachoccurrence/$2,000,000aggregatefortheTermofthisAgreement.
B. IntheeventthatWorkdeliveredpursuanttothisAgreementeitherdirectlyor
indirectlyinvolveorrequireProfessionalServices,ProfessionalLiability,Errorsand
Omissionscoverageshallbeprovidedwithminimumlimitsof$1,000,000per
occurrence."ProfessionalServices",forthepurposeofthissection,shallmeanany
WorkprovidedbyalicensedprofessionalorWorkthatrequiresaprofessional
standardofcare.
C. Workers’compensationcoverage,asrequiredbytheIndustrialInsurancelawsofthe
StateofWashington,shallalsobesecured.
PAGE6OF10
D. CommercialAutomobileLiabilityforowned,leased,hiredornonͲowned,leased,hired
ornonͲowned,withminimumlimitsof$1,000,000peroccurrencecombinedsingle
limit,iftherewillbeanyuseofConsultant’svehiclesontheCity’sPremisesbyoron
behalfoftheCity,beyondnormalcommutes.
E. ConsultantshallnametheCityasanAdditionalInsuredonitscommercialgeneral
liabilitypolicyonanonͲcontributoryprimarybasis.TheCity’sinsurancepoliciesshall
notbeasourceforpaymentofanyConsultantliability,norshallthemaintenanceof
anyinsurancerequiredbythisAgreementbeconstruedtolimittheliabilityof
ConsultanttothecoverageprovidedbysuchinsuranceorotherwiselimittheCity’s
recoursetoanyremedyavailableatlaworinequity.
F. SubjecttotheCity’sreviewandacceptance,acertificateofinsuranceshowingthe
properendorsements,shallbedeliveredtotheCitybeforeperformingtheWork.
G. ConsultantshallprovidetheCitywithwrittennoticeofanypolicycancellation,within
two(2)businessdaysoftheirreceiptofsuchnotice.
14. Delays:Consultantisnotresponsiblefordelayscausedbyfactorsbeyondthe
Consultant’sreasonablecontrol.WhensuchdelaysbeyondtheConsultant’sreasonable
controloccur,theCityagreestheConsultantisnotresponsiblefordamages,norshallthe
ConsultantbedeemedtobeindefaultoftheAgreement.
15. SuccessorsandAssigns:NeithertheCitynortheConsultantshallassign,transferor
encumberanyrights,dutiesorinterestsaccruingfromthisAgreementwithoutthe
writtenconsentoftheother.
16. Notices:AnynoticerequiredunderthisAgreementwillbeinwriting,addressedtothe
appropriatepartyattheaddresswhichappearsbelow(asmodifiedinwritingfromtime
totimebysuchparty),andgivenpersonally,byregisteredorcertifiedmail,returnreceipt
requested,byfacsimileorbynationallyrecognizedovernightcourierservice.Timeperiod
fornoticesshallbedeemedtohavecommenceduponthedateofreceipt,EXCEPT
facsimiledeliverywillbedeemedtohavecommencedonthefirstbusinessdayfollowing
transmission.Emailandtelephonemaybeusedforpurposesofadministeringthe
Agreement,butshouldnotbeusedtogiveanyformalnoticerequiredbytheAgreement.
CITYOFRENTON
DerekAkesson,ProjectManager
RentonCityHall–5thFloor
1055SouthGradyWay
Renton,WA98057
CONSULTANT
MoSheikhizadeh
TranTechEngineering,LLC
365118thAveSESTE100
Bellevue,WA98005
PAGE7OF10
Phone:(425)430Ͳ7337
dakesson@rentonwa.gov
Fax:N/A
Phone:(360)888Ͳ7551
msheikhizadeh@trantecheng.com
Fax:N/A
17. DiscriminationProhibited:Excepttotheextentpermittedbyabonafideoccupational
qualification,theConsultantagreesasfollows:
A. Consultant,andConsultant’sagents,employees,representatives,andvolunteers
withregardtotheWorkperformedortobeperformedunderthisAgreement,shall
notdiscriminateonthebasisofrace,color,sex,religion,nationality,creed,marital
status,sexualorientationorpreference,age(exceptminimumageandretirement
provisions),honorablydischargedveteranormilitarystatus,orthepresenceofany
sensory,mentalorphysicalhandicap,unlessbaseduponabonafideoccupational
qualificationinrelationshiptohiringandemployment,inemploymentorapplication
foremployment,theadministrationofthedeliveryofWorkoranyotherbenefits
underthisAgreement,orprocurementofmaterialsorsupplies.
B. TheConsultantwilltakeaffirmativeactiontoinsurethatapplicantsareemployedand
thatemployeesaretreatedduringemploymentwithoutregardtotheirrace,creed,
color,nationalorigin,sex,age,sexualorientation,physical,sensoryormental
handicaps,ormaritalstatus.Suchactionshallinclude,butnotbelimitedtothe
followingemployment,upgrading,demotionortransfer,recruitmentorrecruitment
advertising,layoffortermination,ratesofpayorotherformsofcompensationand
selectionfortraining.
C. IftheConsultantfailstocomplywithanyofthisAgreement’snonͲdiscrimination
provisions,theCityshallhavetheright,atitsoption,tocanceltheAgreementin
wholeorinpart.
D. TheConsultantisresponsibletobeawareofandincompliancewithallfederal,state
andlocallawsandregulationsthatmayaffectthesatisfactorycompletionofthe
project,whichincludesbutisnotlimitedtofairlaborlaws,worker'scompensation,
andTitleVIoftheFederalCivilRightsActof1964,andwillcomplywithCityofRenton
CouncilResolutionNumber4085.
18. Miscellaneous:Thepartiesherebyacknowledge:
A. TheCityisnotresponsibletotrainorprovidetrainingforConsultant.
B. Consultantwillnotbereimbursedforjobrelatedexpensesexcepttotheextent
specificallyagreedwithintheattachedexhibits.
C. Consultantshallfurnishalltoolsand/ormaterialsnecessarytoperformtheWork
excepttotheextentspecificallyagreedwithintheattachedexhibits.
PAGE8OF10
D. Intheeventspecialtraining,licensing,orcertificationisrequiredforConsultantto
provideWorkhe/shewillacquireormaintainsuchathis/herownexpenseand,if
Consultantemploys,subͲcontracts,orotherwiseassignstheresponsibilitytoperform
theWork,saidemployee/subͲcontractor/assigneewillacquireandormaintainsuch
training,licensing,orcertification.
E. ThisisanonͲexclusiveagreementandConsultantisfreetoprovidehis/herWorkto
otherentities,solongasthereisnointerruptionorinterferencewiththeprovisionof
WorkcalledforinthisAgreement.
F. Consultantisresponsibleforhis/herowninsurance,including,butnotlimitedto
healthinsurance.
G. Consultantisresponsibleforhis/herownWorker’sCompensationcoverageaswellas
thatforanypersonsemployedbytheConsultant.
19. OtherProvisions:
A. ApprovalAuthority.EachindividualexecutingthisAgreementonbehalfoftheCity
andConsultantrepresentsandwarrantsthatsuchindividualsaredulyauthorizedto
executeanddeliverthisAgreementonbehalfoftheCityorConsultant.
B. GeneralAdministrationandManagement.TheCity’sprojectmanagerisDerek
Akesson.InprovidingWork,ConsultantshallcoordinatewiththeCity’scontract
managerorhis/herdesignee.
C. AmendmentandModification.ThisAgreementmaybeamendedonlybyan
instrumentinwriting,dulyexecutedbybothParties.
D. Conflicts.IntheeventofanyinconsistenciesbetweenConsultantproposalsandthis
Agreement,thetermsofthisAgreementshallprevail.Anyexhibits/attachmentsto
thisAgreementareincorporatedbyreferenceonlytotheextentofthepurposefor
whichtheyarereferencedwithinthisAgreement.TotheextentaConsultant
preparedexhibitconflictswiththetermsinthebodyofthisAgreementorcontains
termsthatareextraneoustothepurposeforwhichitisreferenced,thetermsinthe
bodyofthisAgreementshallprevailandtheextraneoustermsshallnotbe
incorporatedherein.
E. GoverningLaw.ThisAgreementshallbemadeinandshallbegovernedbyand
interpretedinaccordancewiththelawsoftheStateofWashingtonandtheCityof
Renton.ConsultantandalloftheConsultant’semployeesshallperformtheWorkin
accordancewithallapplicablefederal,state,countyandcitylaws,codesand
ordinances.
PAGE9OF10
F. JointDraftingEffort.ThisAgreementshallbeconsideredforallpurposesasprepared
bythejointeffortsofthePartiesandshallnotbeconstruedagainstonepartyorthe
otherasaresultofthepreparation,substitution,submissionorothereventof
negotiation,draftingorexecution.
G. JurisdictionandVenue.Anylawsuitorlegalactionbroughtbyanypartytoenforceor
interpretthisAgreementoranyofitstermsorcovenantsshallbebroughtintheKing
CountySuperiorCourtfortheStateofWashingtonattheMalengRegionalJustice
CenterinKent,KingCounty,Washington,oritsreplacementorsuccessor.Consultant
herebyexpresslyconsentstothepersonalandexclusivejurisdictionandvenueof
suchcourtevenifConsultantisaforeigncorporationnotregisteredwiththeStateof
Washington.
H. Severability.Acourtofcompetentjurisdiction’sdeterminationthatanyprovisionor
partofthisAgreementisillegalorunenforceableshallnotcancelorinvalidatethe
remainderofthisAgreement,whichshallremaininfullforceandeffect.
I. SoleandEntireAgreement.ThisAgreementcontainstheentireagreementofthe
Partiesandanyrepresentationsorunderstandings,whetheroralorwritten,not
incorporatedareexcluded.
J. TimeisoftheEssence.TimeisoftheessenceofthisAgreementandeachandallof
itsprovisionsinwhichperformanceisafactor.Adherencetocompletiondatesset
forthinthedescriptionoftheWorkisessentialtotheConsultant’sperformanceof
thisAgreement.
K. ThirdͲPartyBeneficiaries.NothinginthisAgreementisintendedto,norshallbe
construedtogiveanyrightsorbenefitsintheAgreementtoanyoneotherthanthe
Parties,andalldutiesandresponsibilitiesundertakenpursuanttothisAgreementwill
beforthesoleandexclusivebenefitofthePartiesandnooneelse.
L. BindingEffect.ThePartieseachbindthemselves,theirpartners,successors,assigns,
andlegalrepresentativestotheotherpartytothisAgreement,andtothepartners,
successors,assigns,andlegalrepresentativesofsuchotherpartywithrespecttoall
covenantsoftheAgreement.
M. Waivers.Allwaiversshallbeinwritingandsignedbythewaivingparty.Eitherparty’s
failuretoenforceanyprovisionofthisAgreementshallnotbeawaiverandshallnot
preventeithertheCityorConsultantfromenforcingthatprovisionoranyother
provisionofthisAgreementinthefuture.Waiverofbreachofanyprovisionofthis
PAGE 10 OF 10
Agreement shall not be deemed to be a waiver of any prior or subsequent breach
unless it is expressly waived in writing.
N. Counterparts. The Parties may execute this Agreement in any number of
counterparts, each of which shall constitute an original, and all of which will together
constitute this one Agreement.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Martin Pastucha
PWD Administrator
Mo Sheikhizadeh
Project Manager
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Shane Moloney
City Attorney
Contract Template Updated 5/21/2021
ϵͬϭϯͬϮϬϮϮ
By:_______________________________________________________________
N/A
Approved by Cheryl Beyer via 9/13/2022 email
Page1of37
EXHIBITA
SCOPEOFWORK
CONTRACT:CAGͲ 22Ͳ 255
PROJECT:BRONSONWAYBRIDGE–SEISMICRETROFITANDPAINTING
CONSULTANT:TRANTECHENGINEERING,LLC
A.PROJECTDESCRIPTION:
TheCityofRenton(AGENCY)isplanningtoperformpaintingandseismicretrofitworkontheBronson
WayBridge(StructureID:0002504A,BridgeNumber:RentonͲ42).
B.PURPOSE:
TheCityofRenton(AGENCY)isrequestingConstructionManagement(CM)servicesfromTranTech
Engineering,LLC(CONSULTANT)fortheconstructionoftheBronsonWayBridge–SeismicRetrofit
andPainting(PROJECT).Sincetheconstructioncontracthasbeenawardedandexecutedand
constructionisanticipatedtostartsoon,thisCONTRACTwillbeimplementedandsubsequently
supplementedtoaccommodatethefollowingconstructionphases.
ConstructionPhase1–Preliminaryactivitiesandstartup
ThisphaseisincludedinthisCONTRACTScopeofWorkandinvolvesthefollowing:
x Setupconstructionfiles
x PreͲConMeeting
x Submittalreviews
x Materialsubmittalreviews
BudgetforthisphaseisincludedinthisCONTRACT.
ConstructionPhase2–Construction
ThisphaseisincludedinthisCONTRACTScopeofWorkandinvolvesthefollowing:
x Inspection
x Documentation
x MaterialsTesting
x PublicOutreach
BudgetforthisphasewillbeincludedinafuturesupplementtothisCONTRACT.
ConstructionPhase3–Postconstructionactivities
ThisphaseisincludedinthisCONTRACTScopeofWorkandinvolvesthefollowing:
x Projectcloseoutandacceptance
x CompletionofredͲlinemarkups(AsͲbuilts)
BudgetforthisphasewillbeincludedinafuturesupplementtothisCONTRACT.
C.STANDARDSANDPROCEDURES:
Theconstructionmanagement,inspection,documentationandmaterialstestingservicesperformed
forthisPROJECTshallbeinaccordancewiththefollowing:
x ConstructionContractCAGͲ22Ͳ062
Page2of37
x WSDOT/APWAStandardSpecifications,2022
x WSDOTConstructionManual,May2022
x WSDOTMaterialsManual,April2022(asapplicable)
x WSDOTLocalAgencyGuidelines,June2022(asapplicable)
D.GENERALASSUMPTIONS:
ThefollowingCONTRACTScopeofWorkandassociatedexpensesarebasedontheassumptions
outlinedbelow:
1. WSDOTfundsarebeingutilizedforCMservicesincludedinthisCONTRACT.Therefore,this
CONTRACTissubjecttoallrulesandregulationsassociatedwiththisfundingsource.
2. ThisCONTRACTScopeofWorkisintendedtobethecompleteCMservicesrequiredfromthe
CONSULTANTforallconstructionphasesofthePROJECT(SectionB).However,theBudgetis
estimatedforConstructionPhase1only.ThetotalexpensesforCONSULTANTshallnotexceed
themaximumamountpayableofthisCONTRACT.Themaximumamountpayableofthis
CONTRACTwillbeincreasedforConstructionPhases2and3whenthefollowingoccurs:
x TheCONSULTANTprovidesadraftsupplementalagreementtotheAGENCYforreviewand
negotiation.Thesupplementalagreementshallbecomplete,includingthescopeof
additionalwork(ifany),estimatedhoursandassociateddirectsalarycostsbytask,and
adjustmentinthetotalamountauthorizedfortheCONTRACT.TheAGENCYwillreviewthe
supplementalagreement.Oncecomplete,furthernegotiationsmayoccurbetweenthe
parties.Onceadraftisagreedto,onecompletesignedoriginalwillbedeliveredtothe
AGENCY,bytheCONSULTANT,forexecutionbytheAGENCY.Onceexecuted,theAGENCY
willissueaNoticetoProceedinwriting.
3. TheAGENCYisresponsibleforthefollowing,asnecessary:
x Reserveandarrangeconferenceroom(s)asnecessary,formeetingsheldatRentonCityHall.
x Mailpublicnoticesasrequired.
x ServeasmediaspokespersonforthePROJECT.
x Leadcommunicationswithelectedofficials.
x Publishallpublicnotices,newslettersandnewsreleases.
x Initiateallcoordinationwithfranchiseandpublicutilitiesasnecessary.
x ProvideCONSULTANTwiththree(3)hardcopiesandone(1)electroniccopyofconstruction
contract.
x ProvideCONSULTANTwithallAGENCYstandardcontractdocumentsforadministrationof
constructioncontract.Thisincludes,butisnotlimitedto,progresspaymentform,change
orderform,etc.
x Enteringintoaseparatecontractforengineeringsupportduringconstructionserviceswith
EngineerofRecord.
x Enteringintoaseparatecontractforenvironmentalsupportduringconstructionservices
withthePermitandEnvironmentalComplianceManager.
4.UnlessotherwiseprovidedforbytheAGENCYoridentifiedinthisCONTRACT,WSDOTformsare
tobeusedfortheconstructiondocumentationonthisPROJECT.
E.INVOICING:
1. TheCONSULTANTshallprepareandsubmitmonthlyinvoicestotheAGENCYforpaymentof
workperformed.
Page3of37
2. Theinvoiceperiodshallbefromthebeginningtoendofeachmonththatworkisperformed.
3. Eachinvoiceshallincludeaprogressreportwiththefollowinginformation:
x Summaryofbudget,expensestodateandexpensesforinvoiceperiod,assignedtoeachtask.
x Summaryofworkaccomplishedfortheinvoiceperiod.
x SummaryofoutstandingissuestoberesolvedbytheAGENCY.
x Backupdetailthatincludesthename,directsalaryrateandhourschanged,foreach
individualchargingtimetothisCONTRACT,fortheinvoiceperiod.
x BackupdetailthatliststheIndirectCostRate(ICR)andresultantamount,whenappliedto
thedirectsalaryamountforeachindividualortothesumtotalofallindividualscharging
timetothisCONTRACT,fortheinvoiceperiod.
x BackupdetailthatliststheFee(Profit)andresultantamount,whenappliedtothedirect
salaryamountforeachindividualortothesumtotalofallindividualschargingtimetothis
CONTRACT,fortheinvoiceperiod.
x BackupdetailofallnonͲsalarycostsincludedintheinvoicefortheworkperiod.
4. EachSUBCONSULTANTlistedtheCONTRACTScopeofWorkshallprepareinvoicesinthesame
mannerandfrequencyaslistedabovefortheCONSULTANT.
5. TheSUBCONSULTANTinvoicesshallbesubmittedtotheCONSULTANTforpaymentand
incorporationintoCONSULTANTinvoices.
6. TheCONSULTANTshallensurethateachSUBCONSULTANTcomplieswithItems1thru5,above.
7. ThebudgetassignedtoSUBCONSULTANT(s)Task(s)isfortheSUBCONSULTANT(s)exclusivelyand
anyincreaseordecreaseinassignedSUBCONSULTANT(s)budgetshallbebySupplemental
AgreementtothisCONTRACT.
F.SCHEDULE:
Theconstructioncontractisfullyexecutedandprovidesfor60workingdays.However,the
constructioncontractalsoprovidesforsuspensionofworkingdaysforprocurementofvirtuallyall
materialtobepermanentlyincorporatedintotheproject.Giventhechallengesfacedoverthepast
yearwithdeliveryofmaterialsduetosupplychainissues,itisassumedthattheprocurementofone
ormoreitemsmayrequireasuspensionofwork.
G.SCOPEOFWORK:
TASK1–CMSERVICES
ThefollowingitemsaretobeperformedbytheCONSULTANTunderthistask.
Assumption(s)
ThebudgetshowninExhibitDisforConstructionPhase1–Preliminaryactivitiesandprojectstartup.
1.1GENERAL
1.1.1ConstructionManagement
TheCONSULTANTshallmanagethePROJECTConstructionassetforthinthedocuments
listedinSECTIONC(above);exceptasmaybemodifiedbelow.
1.1.2CONSULTANT’sResponsibilities
x TheCONSULTANTstaffconsistsof:
Page4of37
9 ConstructionManager
9 ResidentEngineer
9 ConstructionObserver(Inspector),ifemployedbytheConsultant
9 DocumentationSpecialist
9 MaterialsTestingLaboratory(SUBCONSULTANT)
9 PublicOutreach(SUBCONSULTANT)
x TheCONSULTANT’sresponsibilitiesarethetask(s)assignedtoCONSULTANTstaffas
describedwithinthetaskdescriptionsbelow.
x TheCONSULTANT’stask(s),assignedbelow,maybereassignedbytheCONSULTANT.
TheCONSULTANTmustnotifytheProjectManager(AGENCY)ofsuchreassignment.
TheConstructionManagershallremainresponsibleforcompleteness,accuracy,and
timelinessoftheCONSULTANT’swork.
1.1.3AGENCY’sResponsibilities.
x TheAGENCYstaffconsistsof:
9 ProjectManager(AGENCY)
9 Engineer(AGENCY)
9 ConstructionObserver(Inspector)(AGENCY),ifemployedbytheAGENCY
x TheAGENCY’sresponsibilitiesarethetasksassignedtoAGENCYstaffasdescribed
withinthetaskdescriptionsbelow.
1.1.4ResponsibilitiesofOtherConsultantsandAGENCYPersonnel
x EngineerofRecord,PermitandEnvironmentalComplianceManagerandPublicWorks
Departmentshallbeindependentlyresponsiblefortasksassignedasdescribedwithin
thetaskdescriptionsbelow.
1.1.5DirectingtheContractor
x TheContractorisresponsibletogetdirectionfromtheconstructioncontract
documents.
x Requestsforclarificationshallbemadeinwritingintheformofarequestsfor
information(RFI’s).
x RepresentativesoftheEngineer(AGENCY)arenotauthorizedtoacceptWork,to
acceptmaterials,toissueinstructions,ortogiveadvicethatiscontrarytothe
constructioncontract.Workdoneormaterialfurnishedwhichdoesnotmeetthe
constructioncontractrequirementsshallbeattheContractor’sriskandshallnotbea
basisforaclaimeveniftherepresentativespurporttochangetheconstruction
contract(Spec.Sect.1Ͳ05.2).IntheeventAGENCYofCONSULTANTstafffindsit
necessarytogivedirectiontotheContractor,theentitygivingdirectionmaybefound
responsiblefortheworksodirected.Awrittenrecordofthedirectivemustbemade.
1.1.6DutyofCONSULTANT
ThepresenceoftheAGENCY’sProjectManager(AGENCY)and/orEngineer(AGENCY)
duringconstructionordiscussionswiththeContractordoesnotchangethedutiesand
responsibilitiesoftheCONSULTANT,AGENCYorContractor.
1.1.7Deliverables
Page5of37
Therequireddeliverables,ifany,aredefinedinthisCONTRACTScopeofWork.
1.2RESPONSIBILITIES
1.2.1ConstructionManager
x Administration,Supervision,CoordinationandOversite
9 InitiateprojectsetͲupincludingestablishmentoftimesheets(chargecodes),
creationofprojectfiles(electronicandphysical,asapplicable)andscheduling
CONSULTANTpersonnelworkactivities.
9 SupervisionofCONSULTANTpersonnelandactivitiestoensurecompliancewith
CONTRACTscopeandscheduleandproperchargingoftimeagainstthis
CONTRACT.
9 CoordinationofSUBCONSULTANT(s)activities(TasksS1andS2)foralignmentwith
PROJECTconstructionactivities.
9 OversiteofSUBCONSULTANT(s)activities(TasksS1andS2)toensurecompliance
withCONTRACTscopeandbudget.
x Invoicing(SectionE)
x PreͲConstructionMeeting(subtask1.3.24)
x WeeklyConstructionMeetings(subtask1.3.31)
x SerialLetters(subtask1.3.50)
x Protests(subtask1.3.57)
1.2.2 ResidentEngineer
x RecordofMaterials(ROM)(subtask1.3.7)
x NonͲMaterialsSubmittalList(subtask1.3.8)
x BidAnalysis(subtask1.3.9)
x PreͲAwardMeeting(subtask1.3.11)
x RecordKeeping(subtask1.3.15)
x NonͲMaterialsSubmittalSchedule(subtask1.3.16)
x Materials(subtask1.3.17)
x BuyAmerica(subtask1.3.18)
x Subcontractors(subtask1.3.19)
x DisadvantagedBusinessEnterprise(DBE)Subcontractors(subtask1.3.20)
x EqualEmploymentOpportunity(subtask1.3.21)
x Training(subtask1.3.22)
x ProgressSchedule(subtask1.3.23)
x PreͲConstructionMeeting(subtask1.3.24)
x Labor(subtask1.3.25)
x ProjectLaborList(subtask1.3.26)
x Contractor’sEquipmentRateList(subtask1.3.27)
x ConstructionObserverandDocumentationSpecialistOversight(subtask1.3.28)
x WeeklyConstructionMeetings(subtask1.3.31)
x Safety(subtask1.3.32)
x WeeklyStatementsofWorkingDays(subtask1.3.34)
x Contractor’sWeeklyLookͲAheadSchedule(subtask1.3.35)
x ConformityWithandDeviationsFromPlansandStakes(subtask1.3.36)
Page6of37
x Testing(subtask1.3.37)
x PermanentMonuments(subtask1.3.38)
x CorrectionNotices(subtask1.3.39)
x Environmental(subtask1.3.40)
x WorkSuspension(subtask1.3.41)
x Diary(subtask1.3.43)
x InspectorDailyReports(IDR’s)(subtask1.3.45)
x PayNotes(FieldNote)(subtask1.3.46)
x RedLineMarkups(subtask1.3.47)
x RequestsForInformation(RFI’s)(subtask1.3.48)
x Training(subtask1.3.49)
x SerialLetters(subtask1.3.50)
x ProgressPaymentForms(subtask1.3.51)
x ForceAccount(subtask1.3.52)
x ProgressPayments(subtask1.3.53)
x FieldDirectives(subtask1.3.55)
x ChangeOrders(subtask1.3.56)
x Protests(subtask1.3.57)
x Notices(subtask1.3.58)
x ChangeTracking(subtask1.5)
x ProgressSchedule(subtask1.5)
x PostingNotices(subtask1.5)
x CMConstructionOffice(subtask1.5)
1.2.3ConstructionObserver(Inspector)
x RecordofMaterials(ROM)(subtask1.3.7)
x NonͲMaterialsSubmittalList(subtask1.3.8)
x PreͲAwardMeeting(subtask1.3.11)
x RecordKeeping(subtask1.3.15)
x NonͲMaterialsSubmittalSchedule(subtask1.3.16)
x Materials(subtask1.3.17)
x Subcontractors(subtask1.3.19)
x DisadvantagedBusinessEnterprise(DBE)Subcontractors(subtask1.3.20)
x EqualEmploymentOpportunity(subtask1.3.21)
x Training(subtask1.3.22)
x PreͲConstructionMeeting(subtask1.3.24)
x Labor(subtask1.3.25)
x WeeklyConstructionMeetings(subtask1.3.31)
x Safety(subtask1.3.32)
x Contractor’sWeeklyLookͲAheadSchedule(subtask1.3.35)
x ConformityWithandDeviationsFromPlansandStakes(subtask1.3.36)
x Testing(subtask1.3.37)
x PermanentMonuments(subtask1.3.38)
x CorrectionNotices(subtask1.3.39)
x Environmental(subtask1.3.40)
Page7of37
x WorkSuspension(subtask1.3.41)
x Photographs(subtask1.3.42)
x Diary(subtask1.3.43)
x FieldNotebooks(subtask1.3.44)
x InspectorDailyReports(IDR’s)(subtask1.3.45)
x PayNotes(FieldNotes)(subtask1.3.46)
x RedLineMarkups(subtask1.3.47)
x ForceAccount(subtask1.3.52)
x ProgressPayments(subtask1.3.53)
x FieldDirectives(subtask1.3.55)
x PublicWorksDepartmentNotification(subtask1.3.59)
x ChangeTracking(subtask1.5)
1.2.4DocumentationSpecialist
x RecordofMaterials(ROM)(subtask1.3.7)
x NonͲMaterialsSubmittalList(subtask1.3.8)
x PreͲAwardMeeting(subtask1.3.11)
x RecordKeeping(subtask1.3.15)
x NonͲMaterialsSubmittalSchedule(subtask1.3.16)
x Materials(subtask1.3.17)
x BuyAmerica(subtask1.3.18)
x Subcontractors(subtask1.3.19)
x DisadvantagedBusinessEnterprise(DBE)Subcontractors(subtask1.3.20)
x EqualEmploymentOpportunity(subtask1.3.21)
x Training(subtask1.3.22)
x PreͲConstructionMeeting(subtask1.3.24)
x Labor(subtask1.3.25)
x WeeklyConstructionMeetings(subtask1.3.31)
x MeetingMinutes(subtask1.3.33)
x Testing(subtask1.3.37)
x Diary(subtask1.3.43)
x InspectorDailyReports(IDR’s)(subtask1.3.45)
x PayNotes(FieldNote)(subtask1.3.46)
x RequestsForInformation(RFI’s)(subtask1.3.48)
x Training(subtask1.3.49)
x SerialLetters(subtask1.3.50)
x ProgressPaymentForms(subtask1.3.51)
x ForceAccount(subtask1.3.52)
x ProgressPayments(subtask1.3.53)
x ChangeOrders(subtask1.3.56)
1.2.5MaterialsTestingLaboratory(SERVICE)
x RecordofMaterials(ROM)(subtask1.3.7)
x Testingforacceptanceofmaterials(subtask1.3.17)
Page8of37
1.2.6PublicOutreach(SUBCONSULTANT)
x PublicOutreach(TaskS1)
1.2.7ProjectManager(AGENCY)
x Advertisement(subtask1.3.1)
x ConstructionContractAddenda(subtask1.3.2)
x BidderQuestions(subtask1.3.3)
x BidDeadlineandOpening(subtasks1.3.4,1.3.5)
x ConformedConstructionDocuments(subtask1.3.6)
x RecordOfMaterials(ROM)(subtask1.3.7)
x NonͲMaterialsSubmittalList(subtask1.3.8)
x BidAnalysis(subtask1.3.9)
x DeterminationofBidResponsivenessandBidderResponsibility(subtask1.3.10)
x PreͲAwardMeeting(subtask1.3.11)
x PreparationofConstructionContractDocumentsforExecution(subtask1.3.12)
x Award(subtask1.3.13)
x Execution(subtask1.3.14)
x RecordKeeping(subtask1.3.15)
x Materials(subtask1.3.17)
x Subcontractors(subtask1.3.19)
x PreͲConstructionMeeting(subtask1.3.24)
x NoticetoProceed(subtask1.3.29)
x WeeklyConstructionMeetings(subtask1.3.31)
x PermanentMonuments(subtask1.3.38)
x Environmental(subtask1.3.40)
x WorkSuspension(subtask1.3.41)
x InspectorDailyReports(IDR’s)(subtask1.3.45)
x SerialLetters(subtask1.3.50)
x ProgressPaymentForms(subtask1.3.51)
x ProgressPayments(subtask1.3.53)
x ChangeOrders(subtask1.3.56)
x Notices(subtask1.3.58)
1.2.8Engineer(AGENCY)
x TheAuthorityassignedtothe“Engineer”bytheWSDOT/APWAStandard
SpecificationsshallbevestedintheAGENCY’sTransportationDesignManagerwho
performsthedutiesoftheCertificationAuthority(CA).
x ConstructionContractAddenda(subtask1.3.2)
x BidderQuestions(subtask1.3.3)
x ConformedConstructionDocuments(subtask1.3.6)
x PreͲAwardMeeting(subtask1.3.11)
x Materials(subtask1.3.17)
x Subcontractors(subtask1.3.19)
x PreͲConstructionMeeting(subtask1.3.24)
x Labor(subtask1.3.25)
Page9of37
x WeeklyConstructionMeetings(subtask1.3.31)
x WorkSuspension(subtask1.3.41)
x SerialLetters(subtask1.3.50)
x ProgressPayments(subtask1.3.53)
x ChangeOrders(subtask1.3.56)
x Protests(subtask1.3.57)
1.2.9EngineerofRecord
x ConstructionContractAddenda(subtask1.3.2)
x BidderQuestions(subtask1.3.3)
x ConformedConstructionDocuments(subtask1.3.6)
x RecordofMaterials(ROM)(subtask1.3.7)
x NonͲMaterialsSubmittalList(subtask1.3.8)
x BidAnalysis(subtask1.3.9)
x PreͲAwardMeeting(subtask1.3.11)
x RecordKeeping(subtask1.3.15)
x Materials(subtask1.3.17)
x PreͲConstructionMeeting(subtask1.3.24)
x WeeklyConstructionMeetings(subtask1.3.31)
x ConformityWithandDeviationsFromPlansandStakes(subtask1.3.36)
x PermanentMonuments(subtask1.3.38)
x RequestsForInformation(RFI’s)(subtask1.3.48)
x ChangeOrders(subtask1.3.56)
1.2.10PermitandEnvironmentalComplianceManager
x ReviewandApprovalofContractor’sSpillPreventionCountermeasuresandControl
(SPCC)Plan
x Compliancewithissuedenvironmentalpermits
1.2.11PublicWorksDepartment(AGENCY)
x WaterMaintenanceManager
x SewerandSurfaceWaterMaintenanceManager
x StreetsMaintenanceManager
x TransportationMaintenanceManager
1.3TASKSACTIVITIES
1.3.1Advertisement
x PreparedbyProjectManager(AGENCY)andsignedbyAGENCY’sCityClerk.
x PublishedwithDailyJournalofCommerce(DJC)andAGENCY’sofficiallegalpublication
byCityClerk.
x Twoseparateadvertisements,postedforthedurationof21calendardays(LAG
Manual46.2.24).
Page10of37
x ElectroniccopiesoftheplansandspecificationsshallbesentbytheProjectManager
(AGENCY)toBuilder’sExchangeofWashington(www.bxwa.com)foronͲlineposting
startingfromthefirstdateofadvertisement,continuously,untilphysicalcompletion.
1.3.2ConstructionContractAddenda
x ConstructionContractaddendawillbepreparedbytheEngineerofRecord,reviewed
byProjectManager(AGENCY),andsignedbyEngineer(AGENCY)(LAGManual
46.2.24).
1.3.3BidderQuestions
x Questionsmustbeinwriting,eͲmailpreferable.
x AnswerswillbepreparedbytheEngineerofRecord,reviewedbyProjectManager
(AGENCY)andbyEngineer(AGENCY).
x Allanswersshallbemadeinwritingandpostedonthebiddingwebsite(Spec.Sect.1Ͳ
02.4(1)).
x Answersthatchangetheconstructioncontractrequireissuanceofconstruction
contractaddenda.
1.3.4BidDeadline
x BiddeliverywillbetotheCityClerkandthedeadlinewillbeasadvertisedormodified
byconstructioncontractaddenda.
1.3.5BidOpening
x BidopeningbytheCityClerkwillbeatleast48hoursfollowingthebidsubmittal
deadline.
1.3.6ConformedConstructionContractDocuments
x Followingbidopening,theEngineerofRecordwillincorporateallchangesissued
duringthebidprocess,intotheconstructioncontractdocuments.
x TheEngineer(AGENCY)willsigntheconstructioncontractdocumentsforAGENCY
approvalforconstruction.
1.3.7RecordofMaterials(ROM)(Const.Manual9Ͳ1.2C)
x TheRecordofMaterials(ROM)shallbepreparedindependentlybytheEngineerof
RecordandResidentEngineer.
x TheROMshallbemaintainedbytheResidentEngineerand/orDocumentation
Specialist.
x TheConstructionObserver(Inspector)shallrefertotheROMforadditionalactions,to
betakenasnecessary,foracceptanceofmaterialsinthefield.
x TheROMshallbepreparedfollowingbidopeningandpriortoAward.
x TheROMshallbemadeavailableatthePreͲConstructionMeeting.
x RefertoSection1.3.17.
1.3.8NonͲMaterialsSubmittalList(Const.Manual1Ͳ05)
Page11of37
x TheEngineerofRecordandResidentEngineershallindependentlypreparealistofall
constructioncontractrequirednonͲmaterialssubmittals(SubmittalList).
x TheSubmittalListshallbemaintainedbytheResidentEngineerand/orDocumentation
Specialist.
x TheConstructionObserver(Inspector)shallrefertotheNonͲMaterialsSubmittalList
forpendingrequirementsofupͲcomingconstructionactivities.
x TheSubmittalListshallbepreparedfollowingbidopeningandpriortoAward.
x TheSubmittalListshallbemadeavailableatthePreͲConstructionMeeting.
x RefertoSection1.3.16.
1.3.9BidAnalysis
x TheProjectManager(AGENCY)shalltabulateallthebidsbybiditemandevaluatethe
apparentlowbidforbalanceandotherirregularities.TheEngineerofRecordand
ResidentEngineershallreviewforconcurrence.
1.3.10DeterminationofBidResponsivenessandBidderResponsibility
x TheProjectManager(AGENCY)shalldeterminebidresponsivenessandbidder
responsibility.ThecriteriaforaresponsivebidisperSpec.Sect.1Ͳ02.13.Thecriteria
forresponsiblebidderisperSpec.Sect.1Ͳ02.14.
1.3.11PreͲAwardMeeting
x TheProjectManager(AGENCY)shallscheduleandpresideoveraPreͲAwardMeeting.
x Requiredparticipantsinclude:
9 Engineer(AGENCY)
9 ProjectManager(AGENCY)
9 EngineerofRecord
9 PermitandEnvironmentalComplianceManager
9 ConstructionManager
9 ResidentEngineer
9 ConstructionObserver(Inspector)
9 DocumentationSpecialist
9 Contractor’sProjectManager
9 Contractor’sSiteSuperintendent/Foreman
x Agendashallincludethefollowingtopicsataminimum:
9 Timeofconstructioncontractcomplianceletterandresponse
9 APreͲAwardprojectschedule
9 StatutorydeadlineforContractortoreturnsignedconstructioncontractand
contractbond
9 Constructionphasing
9 Lumpsumbreakdowns
9 Acompletestatementoftheorigin,composition,andmanufactureofanyorall
materialstobeused
9 ROM
9 NonͲMaterialsSubmittalList
9 Publicoutreachrequirements
9 DateofPreͲConstructionMeeting
Page12of37
9 DateforNoticetoProceed
9 Constructionoffices
9 LayͲdownlocations
1.3.12PreparationofConstructionContractDocumentsforExecution
x TheProjectManager(AGENCY)shallpreparetheconstructioncontractdocumentsfor
executionbytheContractor.
1.3.13Award
x TheProjectManager(AGENCY)shallsubmitconstructioncontractdocumentsto
WSDOTLocalPrograms,ifrequired,(LAGManual46.2.26)forconcurrencepriorto
award.
x TheProjectManager(AGENCY)shallprepareamemowiththerecommendationto
awardtheconstructioncontractandaddressittotheCityClerkwhowillpreparethe
AgendaBillfortheCityCouncilactiontoawardtheconstructioncontract.
1.3.14Execution
x TheProjectManager(AGENCY)willdelivertheconformedconstructioncontracttothe
Contractorforexecution.
x TheContractormustsignandreturntheagreementformandprovideacontractbond
withinten(10)daysfromthedatetheContractorisnotifiedofaward.
x TheProjectManager(AGENCY)willdeliverthecompleteconstructioncontractand
contractbondtotheCityClerkfortheMayor’ssignatureandfullexecution.
1.3.15RecordKeeping
x TheCONSULTANTshallfileprojectdocumentationinthebasicfolderstructure
providedbytheAGENCY.
x Alloriginalhardcopiesoftheconstructiondocumentationshallbekeptandfiledby
theDocumentationSpecialistanddeliveredtotheProjectManager(AGENCY)in
cardboardfileboxeswithprintedexternaltablesofcontentsuponconstruction
contractcompletion.
x Electroniccopiesofallconstructiondocumentationshallbekeptandfiledbythe
DocumentationSpecialistanddeliveredtotheProjectManager(AGENCY)inAdobe
PDFformatona“flashdrive”orotherelectronicstoragedeviceuponconstruction
contractcompletion.
x TheDocumentationSpecialistshallupdatethestatusofsubmittalsandsubcontractors
onadailybasisandmakethemavailabletotheConstructionObserver(Inspector),
ResidentEngineerandtheEngineerofRecordat7:00AMthemorningfollowingevery
statuschange.Allotherrecordsshallbeupdatedonaweeklybasisandmadeavailable
totheAGENCY,theContractor,allmembersoftheCMteamandattheweekly
constructionmeetingfollowingthestatuschange.
x Uponconstructioncontractcompletion,theDocumentationSpecialistshallprovide
theProjectManager(AGENCY)withdocumentationoftheworkperformedonthe
constructioncontract.Documentationconsistsoffieldbooks,inspector’srecordof
fieldtests,ResidentEngineer’sandInspector’sdiaries,allinvoices,weighbills,truck
measurements,quantitytickets,receivingreports,fieldofficeledgers,massdiagrams,
Page13of37
crossͲsections,computerlistings,andworkprofiles.Photographsorvideotapes
before,during,andafterconstructioncouldbeuseful,especiallyifcareistakento
showanyunusualconditions,equipment,orprocedures.(LAGManual52.8.83.4)
x TheDocumentationSpecialistshallberesponsibleforfilingallmeetingminutes.
x TheDocumentationSpecialistshallobtainprooffromtheContractorthattheyhave
metalltherequirementsforrequiredrecordsandretention(Spec.Sect.1Ͳ07.11(10)B).
1.3.16NonͲMaterialsSubmittalSchedule
x TheDocumentationSpecialistshallmaintainaNonͲMaterialsSubmittalList
spreadsheetthattracksthestatusanddeliverydeadlinesofNonͲMaterialsubmittals
forthepurposeofnotifyingtheContractorandConstructionObserver(Inspector)of
pendingrequirementsforupͲcomingconstructionactivities.
x TheResidentEngineershallreviewtheNonͲMaterialsSubmittalListspreadsheetatthe
weeklyconstructionmeetings.
1.3.17Materials
x Allmaterialsmustmeettherequirementsoftheconstructioncontractandbe
approvedbytheEngineer(AGENCY)ordesignee,priortouse(Spec.Sect.1Ͳ06.1).In
thiscase,theEngineer(AGENCY)designatestheResidentEngineerand/orEngineerof
Record.
x TheDocumentationSpecialistshallensurethatallContractorinitiatedrequestsfor
approvalofmaterialincludeacompletedRequestforApprovalofMaterial(RAM),
WSDOTform350Ͳ071(Rev04/2022).Thisincludesapprovalrequestsformaterials
listedonthecurrentWSDOTQualifiedProductsList(QPL)orAggregateSource
Approval(ASA)database.Thepurposeistoensurethatallmaterialsareassociated
withabiditem.AcopyoftherelevantQPLorASAsheetistobeattachedtothe
applicableRAM.EachRAMshallbedeliveredcomplete.Assemblieswithseparate
RAMssubmittedforindividualcomponentswillbereturnedtotheContractorfor
correctiontoincludeallcomponents(e.g.,LuminairesorTrafficSignalPoles,etc.).
x Approvalofmaterialdoesnotconstituteacceptanceofthematerialforincorporation
intotheWork.AdditionalacceptanceactionsasnotedontheRAM(orattachedQPL
orASAsheet)needtobecompletedpriortothematerialbeingincorporatedintothe
Work.ThismayincludeobtainingaManufacturer’sCertificateofCompliance(MCC),
CertificateofMaterialOrigin(CMO)orotherdocumentationrequiredformaterial
acceptance.ItistheresponsibilityoftheConstructionObserver(Inspector)toverify
anddocumentfulfillmentoftheseadditionalacceptanceactionsinthefield(Const.
Manual9Ͳ1.5).ItistheresponsibilityoftheDocumentationSpecialisttoupdatethe
RecordofMaterial(ROM)withtheseadditionalacceptanceactionswhenRAMsare
approvedandwhenmaterialisacceptedinthefield.Itistheresponsibilityofthe
ResidentEngineertoensuretheseactionsaretakingplaceanduponcompletionofthe
Work,completeandendorsetheMaterialsCertification,WSDOTform140Ͳ574(Rev
10/2015),forthePROJECT.TheEngineer(AGENCY)willnotcertifytheMaterial
CertificationforthePROJECTifitisnotendorsedbytheResidentEngineer.
x TheResidentEngineershallberesponsibleforreviewingContractorsubmitted
requestsforapprovalofmaterialforconformancewiththeconstructioncontract.The
ResidentEngineershallproviderecommendationsforapproval,correctionorrejection
oftheserequeststotheProjectManager(AGENCY)andEngineerofRecordfor
Page14of37
concurrence.Anydeviationfrommaterialspecificationsintheconstructioncontract
willnecessitateissuanceofachangeorderapprovedbytheEngineerofRecordand
theEngineer(AGENCY).
x TheConstructionObserver(Inspector)shallreceiveallmaterialsonsite.Formaterials
permanentlyincorporatedintothePROJECT,onlyapprovedmaterialsshallbe
acceptedandthesematerialsshallhavetherequiredidentificationintheformof
stamps,tags,ticketsorotherdocumentationasapplicable.NonͲapprovedmaterials
and/ormaterialsmissingidentificationshallberejectedandeitherquarantinedor
removedfromthesiteimmediately.Lowriskmaterialsarenotsubjecttothese
requirements(Const.ManualSection9Ͳ1.3CandTable9Ͳ2.)
x TheConstructionObserver(Inspector)shallkeepalltriptickets,invoices,weighbills,
truckmeasurement,quantityticketsorotherrecordofthequantitiesofallmaterials
deliveredforpermanentincorporationintotheproject.
x TheConstructionObserver(Inspector)shallcompleteaFieldAcceptance/Verification
Report,WSDOTForm350Ͳ130(Rev03/2021),forallmaterialspermanently
incorporatedintothePROJECT.TheDocumentationSpecialistshallensurethatthese
reportsarefiledinthePROJECTconstructiondocumentation,Materialsfolder,bybid
item.
x TheDocumentationSpecialistshallmaintainandupdateaMaterialsubmittalstracking
spreadsheetthatincludesallmaterialstobepermanentlyincorporatedintothe
PROJECT.
x ListofMaterialstoTestforacceptance(LAGManualChapter52):
1. StructuralConcrete
9 Slump
9 Air
9 Temp
9 CompressionTesting
9 Aggregate
2. Asphaltintheroadway
9 Density
9 HotMix
9 Aggregate
3. Surfacingunderroadwayandbridgeapproaches
9 Density
9 GradationandSandEquivalent(SE)
4. Basematerialunderroadway,embankments,bridgeapproaches
9 Density
9 GradationandSandEquivalent(SE)
5. StructuralGroutand/orMortar
9 CompressionTesting
6. HighStrengthNuts,BoltsandWashers(Spec.Sect.9Ͳ06.5)
9 Manufacturer’sCertificationofCompliance(MCC)
9 CertificateofMaterialOrigin(CMO)
x ListofMaterialstoCertifyforacceptance(LAGManualChapter52):
1. Steel
9 Manufacturer’sCertificateofCompliance(MCC)
9 CertificateofMaterialOrigin(CMO)–FHWAfundedprojectsonly
Page15of37
2. Iron
9 CertificateofMaterialOrigin(CMO)–FHWAfundedprojectsonly
3. LiquidAsphaltProducts
9 Manufacturer’sCertificateofCompliance(MCC)
4. ConstructionGeosynthetics
9 Manufacturer’sCertificateofCompliance(MCC)
5. GuardrailItems
9 CertificateofMaterialOrigin(CMO)forsteelcomponents–FHWAfunded
projectsonly
6. BridgeBearingAssembliesthatarenotwelded
9 Manufacturer’sCertificateofCompliance(MCC)
9 CertificateofMaterialOrigin(CMO)–FHWAfundedprojectsonly
x ListofMaterialswithVisualInspectionorCatalogCutforacceptance(LAGManual
Chapter52):
1. Trafficmarking–paintsandthermoplastics
2. Signs
3. LandscapingorIrrigationItems
4. NonͲStructuralDrainageItems
5. RebarChairsandDobieBlocks
6. TemporaryItems
7. Compost
8. StreetFurniture
9 CertificateofMaterialOrigin(CMO)forsteelcomponents–FHWAfunded
projectsonly
9. MonumentCastandCover
9 CertificateofMaterialOrigin(CMO)–FHWAfundedprojectsonly
x ListofMaterialsthatrequireFabricationInspectionforacceptance(LAGManual
Chapter52):
1. FabricatedorWeldedStructuralSteelItems
9 WSDOTinspectedͲPhotographanddocumentinIDRInspectionStamp/Tag.
ACertificateofMaterialOrigin(CMO)isnotrequiredifWSDOTinspecteditem,
regardlessoffundingsource.
9 Inspectedbyothers–Documentationandacceptanceforallcomponent
materialssubjecttoapplicablerequirementsasstatedelsewhere.ACertificate
ofMaterialOrigin(CMO)isonlyrequiredforFHWAfundedprojects.
2. StructuralPrecastConcreteItems
9 WSDOTinspectedͲPhotographanddocumentinIDRInspectionStamp/Tag.
ACertificateofMaterialOrigin(CMO)isnotrequiredifWSDOTinspecteditem,
regardlessoffundingsource.
9 Inspectedbyothers–Documentationandacceptanceforallcomponent
materialssubjecttoapplicablerequirementsasstatedelsewhere.ACertificate
ofMaterialOrigin(CMO)isonlyrequiredforFHWAfundedprojects.
3. BridgeBearingAssembliesthatarewelded
9 WSDOTinspectedͲPhotographanddocumentinIDRInspectionStamp/Tag.
ACertificateofMaterialOrigin(CMO)isnotrequiredifWSDOTinspecteditem,
regardlessoffundingsource.
Page16of37
9 Inspectedbyothers–Documentationandacceptanceforallcomponent
materialssubjecttoapplicablerequirementsasstatedelsewhere.ACertificate
ofMaterialOrigin(CMO)isonlyrequiredforFHWAfundedprojects.
4. SignBridges
9 WSDOTinspectedͲPhotographanddocumentinIDRInspectionStamp/Tag.
ACertificateofMaterialOrigin(CMO)isnotrequiredifWSDOTinspecteditem,
regardlessoffundingsource.
9 Inspectedbyothers–Documentationandacceptanceforallcomponent
materialssubjecttoapplicablerequirementsasstatedelsewhere.ACertificate
ofMaterialOrigin(CMO)isonlyrequiredforFHWAfundedprojects.
5. CantileverSignStructures
9 WSDOTinspectedͲPhotographanddocumentinIDRInspectionStamp/Tag.
ACertificateofMaterialOrigin(CMO)isnotrequiredifWSDOTinspecteditem,
regardlessoffundingsource.
9 Inspectedbyothers–Documentationandacceptanceforallcomponent
materialssubjecttoapplicablerequirementsasstatedelsewhere.ACertificate
ofMaterialOrigin(CMO)isonlyrequiredforFHWAfundedprojects.
x AcceptanceSamplingandTestingFrequency:
Theacceptancesamplingandtestingfrequencyshallfollowtheguidelineslistedin
Const.ManualSection9Ͳ3.7,asmaybemodifiedbytheconstructioncontractandthe
exceptionslistedinLAGManualAppendix52.107.
x SpecificRequirementsforEachMaterial:
SpecificrequirementsforeachmaterialshallfollowtheguidelineslistedinConst.
ManualSection9Ͳ4,asmaybemodifiedbytheconstructioncontractandthe
exceptionslistedinLAGManualAppendix52.107.
x QualityAssurance:
1. ForFHWAfundedprojectsonNHS(FedRoute#assigned):
9 FieldandLabTestingPersonnel–Allpersonnelsamplingortestingmaterials
ontheprojectsiteoninafieldlaboratoryshallbeWAQTCCertifiedperConst.
ManualSection9Ͳ5.3orMethodQualifiedperConst.ManualSection9Ͳ5.4.
9 TestingEquipment–Allfieldandlaboratorytestingequipmentshallbe
calibrated/standardized/checkedasrequiredbyAASHTOR18andR61or
WSDOTVerificationProcedures.RefertoConst.ManualSection9Ͳ5.5.
9 Laboratory–ThelabmustbequalifiedperConst.ManualSection9Ͳ5.6B.The
labmustbereviewedonanannualbasisbyWSDOTQualitySystemsReview
TeaminaccordancewithMaterialsManualProcedureQC3.Thelabmusthave
anupͲtoͲdateLaboratoryQualitySystemsManualthatmeetsthe
requirementsofAASHTOR18.Thelabmusthavedocumentationoftester
trainingandcertification/qualificationmeetingtherequirementsofAASHTO
R25.Thetestingequipmentmustbelabeledwithstickersshowingthedateof
calibration/standardization/checkandallequipmentcalibration/
standardization/checkdocumentationmustmeettherequirementsof
AASHTOR18andR61.
9 IndependentAssurance–AGENCYoptionperLAGManualAppendix52.107.
AGENCYelectsnottoimplementforthisPROJECT.
2. ForFHWAfundedprojectsnotonNHS(FedRoute#notassigned):
9 FieldandLabTestingPersonnel–Allpersonnelsamplingortestingmaterials
ontheprojectsiteoninafieldlaboratoryshallbecompetentandfamiliarwith
Page17of37
applicabletestingprocedures.Iftestingpersonnelarenotspecificallycertified
orqualified,theirworkshallbereviewedbyWAQTCCertifiedorMethod
Qualifiedpersonnel.
9 TestingEquipment–Allfieldandlaboratorytestingequipmentshallbe
calibrated/standardized/checkedasrequiredbyAASHTOR18andR61.
9 Laboratory–ThelabmustbeaccreditedbyAASHTOforAASHTOR18or
AmericanAssociationforLaboratoryAccreditation(A2LA)forISO/IEC17025
andcertifiedinthetestmethodsapplicabletothePROJECT.
9 IndependentAssurance–Notapplicable.
3. FornonͲFHWAfundedprojectsonNHS(FedRoute#assigned):
9 FieldandLabTestingPersonnel–Allpersonnelsamplingortestingmaterials
ontheprojectsiteoninafieldlaboratoryshallbecompetentandfamiliarwith
applicabletestingprocedures.Iftestingpersonnelarenotspecificallycertified
orqualified,theirworkshallbereviewedbyWAQTCCertifiedorMethod
Qualifiedpersonnel.
9 TestingEquipment–Allfieldandlaboratorytestingequipmentshallbe
calibrated/standardized/checkedasrequiredbyAASHTOR18andR61.
9 Laboratory–ThelabmustbeaccreditedbyAASHTOforAASHTOR18or
AmericanAssociationforLaboratoryAccreditation(A2LA)forISO/IEC17025
andcertifiedinthetestmethodsapplicabletothePROJECT.
9 IndependentAssurance–Notapplicable.
4. FornonͲFHWAfundedprojectsnotonNHS(FedRoute#notassigned):
9 FieldandLabTestingPersonnel–Allpersonnelsamplingortestingmaterials
ontheprojectsiteoninafieldlaboratoryshallbecompetentandfamiliarwith
applicabletestingprocedures.Iftestingpersonnelarenotspecificallycertified
orqualified,theirworkshallbereviewedbyWAQTCCertifiedorMethod
Qualifiedpersonnel.
9 TestingEquipment–Allfieldandlaboratorytestingequipmentshallbe
calibrated/standardized/checkedasrequiredbyAASHTOR18andR61.
9 Laboratory–ThelabmustbeaccreditedbyAASHTOforAASHTOR18or
AmericanAssociationforLaboratoryAccreditation(A2LA)forISO/IEC17025
andcertifiedinthetestmethodsapplicabletothePROJECT.
9 IndependentAssurance–Notapplicable.
x TestResultsandDocumentation:
9 AlltestresultsandassociateddocumentationshallbesubmittedtoCONSULTANT
forreview,priortoCONSULTANTsubmittingtoAGENCY.
9 Anindependentreviewoftestresultsandassociateddocumentationshallbe
conductedandacknowledgedbyMaterialsTestingLab,priortosubmissionto
CONSULTANT.
9 Refertosubtask1.3.37
1.3.18BuyAmerica
x TheResidentEngineershallberesponsiblethatallferrousmaterialsmeet“Buy
America”requirements(Spec.Sect1Ͳ06).
x TheDocumentationSpecialistshallobtainandfileacopyofallCertificationofMaterial
Origin(CMO’s)andManufacturer’sCertificateofCompliance(MCC’s)fromthe
Contractor,priortothematerialsbeingdeliveredtothesite.AcopyofCMO’sand
Page18of37
associatedMCC’sshallbeincludedwithfirstProgressPaymentinvoicethatincludes
thosematerialsforpayment.
1.3.19Subcontractors
x AllSubcontractorsmustbeapprovedbytheEngineer(AGENCY)ordesigneebefore
performinganyworkonthePROJECT.Inthiscase,theEngineer(AGENCY)designates
theResidentEngineerorDocumentationSpecialist.
x TheConstructionObserver(Inspector)shalltrackallsubcontractorsonthejobsite.If
asubcontractorisnotyetapprovedtobeonthePROJECT,theConstructionObserver
(Inspector)shallnotifytheContractortoimmediatelyremovethesubcontractorfrom
thejobsite,untilapprovalisgranted.Whenrequiredbytheconstructioncontract,the
ConstructionObserver(Inspector)shallobserveandrecordVINnumberson
Subcontractorvehicles.
x AllSubcontractorsperformingWorkonthePROJECTmustmeettheconditionsset
forthinSpec.Sect.1Ͳ08.1.
x TheDocumentationSpecialistshallkeepdocumentationforallSubcontractors
performingWorkforthePROJECT.TheDocumentationSpecialistshallmaintaina
trackingspreadsheetthatdemonstratescompliancewithSpec.Sect.1Ͳ08.1foreach
SubcontractorperformingWorkforthePROJECT.
x TheContractormustsubmitacompletedRequesttoSubletWork,WSDOTForm421Ͳ
012(REV08/2022),foreachSubcontractorproposedtoworkonthePROJECT.The
requestmustbereviewedandapprovedbytheResidentEngineertoensurethatthe
proposedSubcontractormeetstherequirementsofWAC296.127.10(Spec.Sect.1Ͳ
08.1).
x AllSubcontractorsmusthaveanAGENCYBusinessLicensewhenperformingwork
withinthejurisdictionoftheAGENCY.
x TheResidentEngineershallverifyanddocumentthatworkperformedbythe
Contractor’sownorganizationaccountsforatleast30%oftheAwardedContractprice
(Spec.Sect.1Ͳ08.1).
x TheResidentEngineershallverifyanddocumentthatlowertiersubcontractorsdonot
collectivelyperformWorkthatexceeds25%ofthetotalamountsubcontractedtoa
Subcontractor,exceptforfurnishinganddrivingofpiling,orfurnishingandinstalling
concretereinforcingorpostͲtensioning(Spec.Sect.1Ͳ08.1).
x IftheResidentEngineerand/orConstructionObserver(Inspector)isdissatisfiedwith
anypartofthesubcontractedWorktheyaretonotifytheProjectManager(AGENCY)
andEngineer(AGENCY).AmeetingmayberequiredtodiscusswithAGENCYstaff.The
Engineer(AGENCY)willdecideifremovaliswarrantedandifso,theEngineer(AGENCY)
willsendawrittenrequesttotheContractortoremovetheSubcontractor.Upon
notification,theDocumentationSpecialistshallupdatethesubcontractortracking
spreadsheetandConstructionObserver(Inspector)shallverifyanddocumentthatthe
SubcontractorisnolongeronͲsite,performingWorkforthePROJECT.
1.3.20DisadvantagedBusinessEnterprise(DBE)Subcontractors
1.3.21EqualEmploymentOpportunity
1.3.22Training
Page19of37
1.3.23ProgressSchedule
x Theprogressscheduletypeshallbeasspecifiedintheconstructioncontract,Spec.
Sect.1Ͳ08.3(2).
x TheprogressscheduleshallbepreparedbytheContractor.
x Apreliminaryprogressscheduleshowingtheorderandtimerequiredforthevarious
phasesoftheWorkandofsufficientdetailtodemonstratecompletionofthePROJECT
withinthetimeallottedintheconstructioncontract,myberequestedbytheAGENCY,
priortoawardoftheconstructioncontract(Spec.Sect.1Ͳ02.15).
x TheprogressscheduleshallbereviewedandapprovedorreturnedbytheEngineer
(AGENCY)ordesignee,within15calendardaysofreceiptfromtheContractor(Spec.
Section1Ͳ08.3(2).Inthiscase,theEngineer(AGENCY)designatestheResident
Engineer.
x TheEngineer(AGENCY)ordesigneeshallrequireprogressscheduleupdates,asmay
berequired,forreviewandapproval(Spec.Sect.1Ͳ08.3(3)).Inthiscase,theEngineer
(AGENCY)designatestheResidentEngineer.
1.3.24PreͲConstructionMeeting
x TheResidentEngineershallscheduleandpresideoveraPreͲConstruction(PreͲCon)
Meeting.
x Requiredparticipantsinclude:
9 Engineer(AGENCY)
9 ProjectManager(AGENCY)
9 EngineerofRecord
9 PermitandEnvironmentalComplianceManager
9 ConstructionManager
9 ResidentEngineer
9 ConstructionObserver(Inspector)
9 DocumentationSpecialist
9 PublicOutreachSUBCONSULTANTrepresentative
9 Contractor’sProjectManager
9 Contractor’sSiteSuperintendent/Foreman
9 AGENCYPublicWorksDept.representativesforTrafficSignals,Streets,
Stormwater,WastewaterandWater,asapplicable
9 FranchiseUtilitiesrepresentatives,asapplicable
9 WSDOTLocalPrograms,LocalProgramsEngineer,NWRegion
9 WSDOTLocalPrograms,AssistantLocalProgramsEngineerassignedtoAGENCY
9 WSDOTNWRegionInspectorassignedtoinspectprojectsonStateRoutesand/or
LimitedAccesslocatedwithinthejurisdictionalboundaryoftheAGENCY
x AgendaͲThePreͲConMeetingAgendashallbepreparedbytheResidentEngineerand
shallincludeataminimumthoseitemslistedinWSDOTLAGManual,Appendix52.101,
asapplicable.RefertoWSDOTConst.Manual,Division1Ͳ05,PreconstructionMeetings,
Discussions,fordescriptionsoftopicstodiscussatthePreͲConMeeting.
x FirstOrderofWork–RefertoSpec.Sect.1Ͳ08.4.WhenshowninthePlans,thefirst
orderofworkshallbetheinstallationofhighvisibilityfencingtodelineateallareasfor
protectionorrestoration,asdescribedintheconstructioncontract.Installationofhigh
visibilityfencingadjacenttotheroadwayshalloccuraftertheplacementofall
necessarysignsandtrafficcontroldevicesinaccordancewith1Ͳ10.1(2).Upon
Page20of37
constructionofthefencing,theContractorshallrequesttheEngineer(AGENCY),or
designee,toinspectthefence.Inthiscase,theEngineer(AGENCY),designatesthe
ResidentEngineerorConstructionObserver(Inspector).Nootherworkshallbe
performedonthesiteuntiltheAGENCYhasacceptedtheinstallationofhighvisibility
fencing,asdescribedintheconstructioncontract.
x Forms–TheResidentEngineerand/orDocumentationSpecialistshouldprovidethe
Contractoradescriptionofallrequiredforms,providingguidanceonwherethe
Contractorcanfindeach–www.wsdot.wa.gov/forms/pdfForms.html.Remindthe
Contractorthatallformsubmittals,includingthoseofsubcontractors,lowerͲtier
subcontractors,andsuppliers,shouldberoutedthroughthePrimeContractorfor
submittaltoAGENCY(Const.Manual1Ͳ05).
1.3.25Labor
x PrevailinghourlyminimumwageratesforthePROJECTareincludedintheAppendix
oftheconstructioncontract.
x ForFHWAfundedprojects,theFederal(DavisͲBacon)andStateprevailinghourly
minimumwageratesareincludedintheconstructioncontractandthehighestratefor
agivenapplicablejobclassificationshallapply.Forallotherprojects,onlytheState
prevailinghourlyminimumwageratesapply.
x StatementofIntenttoPayPrevailingWages–TheDocumentationSpecialistshall
verifyanddocumentthataStatementofIntenttoPayPrevailingWages(Intent)has
beenfiledwithandapprovedbytheDept.ofLaborandIndustries(L&I)inthe
PrevailingWageIntentsandAffidavitsSystem(PWIA),foreachfirmcoveredunder
RCW39.12thatwillorhasprovidedWorkandmaterialsforthePROJECT(Const.
Manual1Ͳ07.9(5)).TheAGENCYwillmakenopaymentundertheconstructioncontract
untilIntentshavebeenapprovedbyL&I,postedonPWIA,andconfirmedbythe
Engineer(AGENCY)ordesignee(Spec.Sect.1Ͳ07.9(5)).Inthiscase,theEngineer
(AGENCY)designatestheResidentEngineerorDocumentationSpecialist.The
DocumentationSpecialistshallmaintainandupdateanIntentstrackingspreadsheet
thatdocumentsthestatus,includingIntentID#,forallfirms,asapplicable.
x AffidavitofPrevailingWagesPaid–TheDocumentationSpecialistshallverifyand
documentthatanAffidavitofPrevailingWagesPaid(Affidavit)hasbeenfiledwithand
approvedbyL&IinthePWIA,foreachfirmcoveredunderRCW39.12thathasprovided
WorkandmaterialsforthePROJECT(Const.Manual1Ͳ07.9(5)).TheAGENCYwillnot
grantPROJECTcompletion,releaseretainage(asapplicable)orreleasethecontract
bonduntilallapprovedAffidavitsfortheContractor,allSubcontractorsandlowertier
SubcontractorshavebeenapprovedbyL&I,postedonPWIA,andconfirmedbythe
Engineer(AGENCY)ordesignee(Spec.Sect.1Ͳ07.9(5)).Inthiscase,theEngineer
(AGENCY)designatestheResidentEngineerorDocumentationSpecialist.Upon
PhysicalCompletionofthePROJECT,theDocumentationSpecialistshallcompletea
NoticeofCompletionofPublicWorksContract,L&IFormF215Ͳ038Ͳ000(05Ͳ2020or
morecurrentREV),includingAffidavitID#,forallfirms,asapplicable.Oncecompleted,
theNoticeofCompletionshallbeprovidedtotheProjectManager(AGENCY)for
reviewandtobegintheprocesstoformallyaccepttheWorkbyAGENCYlegislative
action.
x CertifiedPayrolls–TheDocumentationSpecialistshallverifythatcertifiedpayrolls
havebeensubmittedtoL&IinthePWIA,foreachfirmcoveredunderRCW39.12that
Page21of37
hasprovidedWorkandmaterialsforthePROJECT(Const.Manual1Ͳ07.9(5)).Certified
payrollsarerequiredfromthetimeeachFirmbeginsperformingconstructioncontract
WorkuntilthetimetheAffidavitispostedonPWIAoruntiltheContractorhas
identifiedtheirlastcertifiedpayrollhasbeensubmitted.Certifiedpayrollsaretobe
submittedweeklyonallFHWAfundedprojectsandnolessthanmonthly(witheach
weekreported)onallState(orAGENCY)fundedprojects(Spec.Sect.1Ͳ07.9(5)).The
DocumentationSpecialistshallmaintainandupdateacertifiedpayrolltracking
spreadsheetthatdocumentsthecertifiedpayrollstatusforallfirms,asapplicable.The
spreadsheetshallindicatethatallactiveFirmshavebeencheckedforlateormissing
certifiedpayrolls.AcurrentcopyofthisspreadsheetshallbeprovidedwithProgress
Paymentinvoices,whensubmittedtotheProjectManager(AGENCY)forapproval.
CertifiedpayrollsarenottobeprintedorsavedelectronicallyinPROJECTconstruction
documentationduetoprivacylaws(Const.Manual1Ͳ07.9(5)).
x Interviews–TheConstructionObserver(Inspector)shallconductanddocumentwage
rateinterviewswithContractorandSubcontractoremployees,asmayberequiredby
PROJECTfundingsource,toverifypaymentofwagesmeetsorexceedsminimum
prevailingwagerates(Const.Manual1Ͳ07.9(1)).
1.3.26ProjectLaborList(Spec.Sect.1Ͳ09.6)
x ProjectlaborlistsofthechargeratesforallContractorandSubcontractoremployees
performingworkonthePROJECTshallbesubmittedbytheContractortotheResident
EngineerforreviewandapprovalpriortothecommencementofForceAccountwork.
1.3.27Contractor’sEquipmentRateList(Spec.Sect.1Ͳ09.4and1Ͳ09.6)
x EquipmentratelistsforContractorandSubcontractownedequipmentshallbe
submittedbytheContractortotheResidentEngineerforreviewandapprovalpriorto
thecommencementofForceAccountwork.Thesubmittedequipmentratesshallbe
foreverypieceofequipmentthatwillpotentiallybeusedonthejob.
1.3.28ConstructionObserver(Inspector)andDocumentationSpecialistOversight
x TheResidentEngineershallmanagetheactivitiesoftheConstructionObserver
(Inspector)andDocumentationSpecialistandprovidedirectionandtrainingand
necessary.IftheConstructionObserver(Inspector)orDocumentationSpecialistis
failingtoperformassignedduties,theResidentEngineershallattempttocorrectthe
performance.IftheConstructionObserver(Inspector)orDocumentationSpecialist
failstomakecorrectionsinperformance,theyshallbereplaced.Intheeventthe
ConstructionObserver(Inspector)isanAGENCYemployee,theConstructionManager
mustprepareawrittennoticeofperformancefailureanddeliverittotheProject
Manager(AGENCY).
x IntheeventanAGENCYemployee,assignedasConstructionObserver(Inspector)to
thePROJECT,failstomakecorrectionsinperformance,theProjectManager(AGENCY)
willnotifytheEngineer(AGENCY)andactionwillbetakentoremovetheAGENCY
employeefromthePROJECT.SuchactionmayresultinaneedfortheCONSULTANTto
provideaConstructionObserver(Inspector)forthePROJECT.
1.3.29NoticetoProceed
Page22of37
x TheProjectManager(AGENCY)willissuetheNoticetoProceedtotheContractor,
typicallysometimeafterthePreͲConstructionMeetingisheldand,onadate,agreed
tobytheContractor.
x ThechargingofworkingdayswillbeginthedayaftertheNoticetoProceeddate(Spec.
Sect.1Ͳ08.4).
1.3.30Mobilization
x Paymentformobilizationwillbemadeinstrictcompliancewiththeconstruction
contract.Thenumeratorsforthe5%and10%thresholdcalculationsarethesumsof
thevalueofallbiditemandforceaccountworkcompleteduptothecutoffdate
excludinganyamountforthebiditem,mobilization.Thedivisorforthe5%and10%
thresholdcalculationsisthetotaloriginalconstructioncontractamount.Thebasisfor
the10%delayedpaymentlimituntilsubstantialcompletionisthetotaloriginal
constructioncontractamount.
1.3.31WeeklyConstructionMeetings
x TobepresidedoverbytheResidentEngineer.
x TobeheldintheCONSULTANT’sorContractor’sconstructionofficewiththeabilityto
haveparticipantsattendvirtually.ThesemeetingsmaybeheldvirtuallyviaMicrosoft
Teams,Zoom,GoToMeeting,orothersoftwareplatformaccessibletoallparticipants,
ifagreedtobyAGENCY,CONSULTANTandContractor.
x Requiredattendees:
9 ConstructionManager
9 ResidentEngineer
9 DocumentationSpecialist
9 ConstructionObserver(Inspector)
9 PublicOutreachSubͲconsultant
9 ProjectManager(AGENCY)
9 Engineer(AGENCY)
9 EngineerofRecord
9 PermitandEnvironmentalComplianceManager
9 ContractorRepresentatives
x Agendatoincludethefollowing:
1. Safety
9 Contractor’sreport
9 ResidentEngineer’sreport
9 ConstructionObserver’s(Inspector’s)report.
2. Reviewmeetingminutesfrompreviousweeklymeeting.
3. Weeklystatementofworkingdays.
4. ScheduleProgress
9 Contractor’sweeklylookͲaheadschedule
9 UpcomingpreͲconstructionmeetingdates
9 Criticalcompletiondates
9 Contractor’splanformeetingcriticalcompletiondates
5. ResidentEngineer’sreport
6. ConstructionObserver’s(Inspector’s)report
7. Environmentalcompliancereport
Page23of37
8. Publicoutreachreport
9. Submittals
9 ChangestotheROM
9 Materialstrackingspreadsheetreview
9 NonͲmaterialstrackingspreadsheetreview
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
materialsandnonͲmaterialstrackingspreadsheetateveryweekly
constructionmeeting.
10. Certifiedpayrolls
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
CertifiedPayrollstrackingspreadsheetsateveryweeklyconstructionmeeting.
11. RFI’s
9 Status
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
RFItrackingspreadsheetsateveryweeklyconstructionmeeting.
12. SerialLetters
9 Status
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
SerialLettertrackingspreadsheetateveryweeklyconstructionmeeting.
13. ChangeOrders
9 Status
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
ChangeOrdertrackingspreadsheetateveryconstructionmeeting.
14. Training(ifapplicable)
9 Contractor’sstatus
15. Subcontractor(s)
9 DBEstatus(ifapplicable)
9 Writtenapprovals
9 Request(s)toSublet
9 Intentstopayprevailingwages
9 Businesslicenses
9 TheDocumentationSpecialistshallreviewandsupplyupdatedcopiesofthe
Subcontractortrackingspreadsheet(s)ateveryweeklyconstructionmeeting.
1.3.32Safety
x TheContractorisrequiredtoprovideasafeworkplaceandobligatedtocomplywith
allfederalsafetyandhealthstandards,codes,rules,andregulationsthatmaybe
applicabletotheconstructioncontractwork(Spec.Sect.1Ͳ07.1).
x TheResidentEngineershallobtaintheWISHAmanuals,particularlySafetyStandards
forConstructionWork(WAC296Ͳ155),GeneralSafetyandHealthStandards(WAC296Ͳ
24),andGeneralOccupationalHealthStandards(WAC296Ͳ62),andshallreviewthem
withtheConstructionObserver(Inspector)toensurereasonablefamiliaritytothe
extentthattheycanrecognizeimportantrequirements(Const.Manual1Ͳ07).
x TheResidentEngineerandConstructionObserver(Inspector)shallreviewthe
constructioncontractplansandspecificationstoidentifythoseaspectsofthework
meritingspecialattentionfromthestandpointofpotentiallydangeroustypesofwork
andhazardelimination(Const.Manual1Ͳ07).
Page24of37
x TheResidentEngineershallcompleteOSHAForm301foreachCONSULTANT
employeeinjuredwhileperformingworkunderthisCONTRACTontheprojectsite.
x Vehicularandpedestrianaccidentsthatoccurwithintheprojectlimitsthatare
observedbyConstructionObserver(Inspector)shallbereportedto911.Construction
Observer(Inspector)shallmakenoteoftheincident(e.g.date,time,location,etc.)in
diaryand/orIDRalongwithanyresultantdamagedonetoAGENCYownedproperty.
1.3.33MeetingMinutes
x TheDocumentationSpecialistshallprepareandkeepallmeetingminutesforpreͲ
construction,weeklyconstruction,andallothermeetingsheldwiththeContractor.A
draftcopyofthemeetingminutesshallbesentviaeͲmailtoallparticipantsforreview
andcomment.Commentsaretobereturnedwithintwo(2)businessdays.Corrections
aretobemadetothemeetingminutesasnecessarywiththefinalmeetingminutesto
befiledandeͲmailedtoparticipantswithinanadditionaltwo(2)businessdaysorat
thenextweeklyconstructionmeeting.
1.3.34WeeklyStatementsofWorkingDays
x TheResidentEngineershallproduceandprovideweeklystatementsofworkingdays
totheAGENCYandContractorattheweeklyconstructionmeetings.Intheeventa
weeklystatementofworkingdaysisnotprovided,theweeklyconstructionmeeting
withbeinterruptedanddelayeduntilitisavailable.Theexpensesassociatedwithsuch
adelay,ifany,shallbebornebytheCONSULTANT.
x Theweeklystatementshallbeonaformthatcontainsthesameinformationasshown
onWSDOTform422Ͳ022(Rev12/91)includedinLAGManual,Appendix52.105.Itshall
detailthenumberofworkable/unworkabledayschargedtoaproject,thereasonaday
ischargedasunworkable,dailyweathercodes,thecurrentstateofconstruction
contractdays,andasummaryoftheweek’sconstructionactivities(Const.Manual,
GEN1Ͳ00.7(1),#5).
1.3.35Contractor’sWeeklyLookͲAheadSchedule
x TheweeklylookͲaheadscheduleshallbeforthetwoͲweekperiodbeginningtheday
followingthedateoftheweeklyconstructionmeeting.TheweeklylookͲahead
schedulemustbedeliveredtotheResidentEngineerthreeworkingdayspriortothe
weeklyconstructionmeeting(Spec.Sect.1Ͳ08.3(2)D).Intheeventitisnotsodelivered,
theconstructionmeetingmaybedelayedbytheResidentEngineeruntilsubmitted
andreviewedandtheworkmaybesuspendedfortheperiodofthemeetingdelay
(Spec.Sect.1Ͳ08.6,itemno.2).Theperiodofworkstoppagewillbecountedasworking
days(Spec.Sect.1Ͳ08.6).
x TheResidentEngineerandConstructionObserver(Inspector)shallreviewtheplans,
specifications,specialprovisionsandbiditemsforworkplannedfortheupͲcoming
workperiod.
1.3.36ConformityWithandDeviationsFromPlansandStakes
x ConstructionStaking–ItistheresponsibilityoftheContractortoaccuratelyset
constructionstakingandtoconstructiontheprojectinconformancewiththeplansand
Page25of37
specifications.ItistheresponsibilityoftheConstructionObserver(Inspector)and
ResidentEngineertobefamiliarwiththeplansandspecifications.
x PreconstructionMeeting(s)–TheResidentEngineershallconductpreͲconstruction
meeting(s)forapplicableactivitiesspecifiedintheconstructioncontract.
x PROWAG–TheConstructionObserver(Inspector)shalldocumentPROWAG
complianceonallwheelchairrampsandsignalconstruction,whenincludedinthe
constructioncontract,usingWSDOTADAMeasurementFormswithinstructions.
x DrainageandSewerStructures–TheResidentEngineerandConstructionObserver
(Inspector)shallbepresentattheconstructionoftheadjustmentofringsandframes.
Bothshallinspectallcompletedcatchbasinsandmanholesimmediatelyfollowingfinal
adjustmentandrequirereconstructionofthosefacilitiesthatdonotmeetthe
requirementsoftheconstructioncontract.
x Raisedintersectiongutters–TheConstructionObserver(Inspector)andEngineerof
Recordshallbepresentduringtheformingandpouringofraisedintersectiongutters.
1.3.37Testing
x TheConstructionManagerisresponsibleforensuringthattheselectedMaterials
TestingLaboratoryprovidestherequiredservicesincompliancewithsubtask1.3.17.
x TheConstructionObserver(Inspector)orResidentEngineershallcontactandschedule
theMaterialsTestingLaboratoryforservices,asrequiredbytheconstructioncontract
orthisCONTRACTScopeofWork.
x TheResidentEngineershallreviewallsubmittedtestreportsandinvestigateany
anomalies,discrepanciesand/ordeviationsfromtheapplicablestandards,whenthe
testresultsarenotincompliancewiththerequirementsoftheconstructioncontract
orthisCONTRACTScopeofWork.
x TheDocumentationSpecialistshallensurethatthesubmittedtestreportsarefiledin
thePROJECTconstructiondocumentation,Materialsfolder,bybiditem.
x UtilitiestestingtobeperformedbyPublicWorksDepartment(PWD),Maintenance
Division,Water,SurfaceWaterandWastewaterSectionsasrequiredperthe
constructioncontract.ContactsforPWDpersonnelshallbeprovidedtothe
CONSULTANTbytheAGENCY.TheConstructionObserver(Inspector)shallcontactand
scheduleutilitiestestingwithapplicablePWDpersonnel.
x TrafficsignalcabinettestingtobeperformedbyPublicWorksDepartment(PWD),
TransportationDivision,MaintenanceSection,asrequiredpertheconstruction
contract.ContactsforPWDpersonnelshallbeprovidedtotheCONSULTANTbythe
AGENCY.TheConstructionObserver(Inspector)shallcontactandscheduletraffic
signalcabinettestingwithapplicablePWDpersonnel.
1.3.38PermanentMonuments
x TheResidentEngineerortheConstructionObserver(Inspector)shallreporttothe
EngineerofRecordandProjectManager(AGENCY)allpermanentmonumentsfound
intheconstructionzone,notshownontheplans.Wheneverasurveymonument
needstoberemovedordestroyed,theapplicationrequiredbyWAC332Ͳ120Ͳ050shall
besubmittedtotheWashingtonStateDepartmentofNaturalResources(DNR).Itshall
becompleted,signedandsealedbytheContractor’slandsurveyororengineer.
Page26of37
x AllapplicationsmustbecompletedonformsprovidedbytheDNRandfollow
instructionsprovidedbyDNR.CompletedapplicationsshallbefiledatDNRperWAC
332Ͳ120Ͳ070.
x Forallmonumentsaresetorreset,RCW58.09.040requiresthatthemonumentbe
filesonaMonumentationMapwiththeCountyEngineerinthecountyinwhichthe
cornerexistsandtheoriginalsenttoDNRfortheirrecords.
1.3.39CorrectionNotices
x Deviations–WhentheConstructionObserver(Inspector)observestheContractor’s
workdeviatingfromtheconstructioncontract(plansand/orspecifications),the
ConstructionObserver(Inspector)shallimmediatelyinformthepersonperformingthe
unapprovedwork.
x NoticeͲTheoralnoticeshallbefolloweddirectlywithawrittencorrectionnoticefrom
theResidentEngineerusinganAGENCYapprovedformanddeliveredtothe
Contractor’sonͲsiteforemanorsuperintendent.
x TheContractorwillnotbepaidforunapprovedworkanditmustberemovedand
replacedunlesstheAGENCYandContractoragreetoexecuteachangeorderforan
acceptabledeviation.Anadjustmentincostmayberequired.
1.3.40Environmental
x Contractorcompliancewithpermitsandenvironmentalregulationsshallbethe
primaryresponsibilityoftheContractorandenforcementshallbetheprimary
responsibilityofthePermitandEnvironmentalComplianceManager.TheConstruction
Observer(Inspector)shallreportallviolationsobservedtothePermitand
EnvironmentalComplianceManager,ResidentEngineerandProjectManager
(AGENCY).
1.3.41WorkSuspension
x TheResidentEngineermayissueaworksuspensionorderwhenthereisoverwhelming
evidenceofContractordisregardforanimmediatethreattoLifeandSafety(Spec.Sect.
1Ͳ07.1andConst.Manual1Ͳ07).Thestepsareasfollows:
1. ThefirstactionistheConstructionObserver(Inspector)givesoralnotificationto
theforemanoftheconstructioncrewinvolvedandphonenotificationtothelocal
WISHAofficeandtheProjectManager(AGENCY)iftheproblemisnotcorrected
immediately.IftheProjectManager(AGENCY)determinesthatimmediateaction
isrequiredtheymaydirecttheConstructionObserver(Inspector)toimmediately
issueawrittenworksuspensionorder.
2. ThesecondactionisoralandwrittennotificationtotheContractor’sProject
ManagerandtheforemanorsuperintendentandthelocalWISHAoffice.
3. Thethirdaction,iftheContractorrefusestoaddressthesafetyviolationandno
WISHAofficerisavailable,theEngineer(AGENCY)mayissueawrittenwork
suspensionorder.
x TheResidentEngineerwithinputfromthePermitandEnvironmentalCompliance
Managermaysuspendworkinthevicinityofarchaeologicalorhistoricalobjects
discovery.
Page27of37
x TheResidentEngineershallsuspendallworkintheareaofandadjacenttothe
discoveryofhumanskeletalremains(Spec.Sect.1Ͳ07.16(4)A).
x TheResidentEngineermaysuspendworkintheareaofautilityconflictuntilthe
solutionoftheconflicthasbeendeterminedandaFieldDirectivehasbeenissued.
x AllotherWorkSuspensionOrdersshallbedocumentedonanAGENCYapprovedform
andmustcontain,ataminimum,thefollowing:
1. Identificationoftheconstructioncontractworkbeingperformed.
2. AdescriptionofthereasonorallegedinfractionincludingWISHA/OSHAruleif
applicable.
3. Location.
4. Time.
5. ThenameofthepersonworkingfortheContractor,responsibleforthealleged
infraction.
6. Photographsand/orvideoshowingtheconditionorallegedinfraction.
1.3.42Photographs
x TheConstructionObserver(Inspector)shalltakephotographsofallmaterialsandtheir
identificationmarkingsortagsupondelivery,allchanges,andadequatephotographs
ofconstructiontocreateacompletephotographicrecordoftheprojectconstruction.
Allphotographsshallbedateandtimestamped,givenareferencenumberanda
recordkeptofthelocationsofallphotographs(Const.Manual10Ͳ3.14).AGENCY
prefers,ataminimum,thatdigitalphotographsand/orvideosbesavedandorganized
bydate.
x Whenonsite,AGENCYpersonnelmaytakedigitalphotographsand/orvideosof
constructionactivities.AnyAGENCYdigitalphotographsand/orvideostakenwillbe
savedandorganizedbydateinAGENCYprojectfiles.
1.3.43Diary
x TheCONSULTANT(ResidentEngineerorConstructionObserver(Inspector)withinput
fromDocumentationSpecialist)shallkeepaprojectdiaryasperConst.Manual10Ͳ
3.6A.Theprojectdiaryistorecordallmattersofimportancewhicharenotcoveredby
otherroutinereportsormaycontainarecordofroutinemattersifthecircumstances
areunusual,conferenceswiththeContractorortheContractor’sfieldrepresentative,
agreementsmade,specialnotesregardingequipmentororganization,labor
conditions,weatherorothercausesfordelaysifofanyconsequence,andanyother
mattersthatmighthaveabearingonthecompletionoftheproject.Itservesasa
collectionpointformanyoftheproject’spertinentfactsarrangedinanychronological
order.Itmayshowhowquestionswereanswered,howproblemsweresolved,
progressofthework,andunusualconditionspertainingtoworkingdayscharged.It
canprovidedataforanalysisofbothclaimsandrequestsforextensionsofconstruction
contracttime.
x TheResidentEngineerand/orConstructionObserver(Inspector)shallverifyand
documentthattheContractoriskeepingaDailyDiaryasrequiredpertheconstruction
contract,Spec.Sect.1Ͳ05.17.
1.3.44FieldNotebooks
Page28of37
x FieldnotebooksshallbecompletedandmaintainedbytheConstructionObserver
(Inspector)(Const.Manual10Ͳ3.12).
1.3.45InspectorDailyReports(IDR’s)
x TheConstructionObserver(Inspector)shallcompleteInspectorDailyReports(IDR’s)
foreverydayworkedbytheContractor.TheIDR’sshallbecompletedincompliance
withConst.Manual10Ͳ3.6BanddeliveredtotheDocumentationSpecialist,Resident
EngineerandProjectManager(AGENCY)inAdobePDFformatatthecompletionof
eachday’swork.
x TheIDR’sshallbemadeonWSDOTforms422Ͳ004(07/2019),422Ͳ004A(rev10/2019)
and/or422Ͳ004B(rev10/2019),asapplicable.
x TheResidentEngineershallreviewallIDR’spriortosendingtoProjectManager
(AGENCY).
1.3.46PayNotes(FieldNotes)
x TheConstructionObserver(Inspector)shallmeasureandcompleterecordsof
quantitiesofallthebiditemsconstructedeachdayusingWSDOTforms422Ͳ635(rev
3/2008),422Ͳ636(rev9/1996),422Ͳ637(rev3/2008),asapplicable.
x TheConstructionObserver(Inspector)shallpresentthecompletedPayNotestothe
Contractorthefollowingmorningforreviewandsignatureandimmediatelyforward
totheDocumentationSpecialistandResidentEngineer.
x TheResidentEngineershallreviewallpaynotes.
x TheDocumentationSpecialistshallprepareandcompletePayNoterecordsonPay
Notesummaryspreadsheetsforeachpayperiod.
x AcopyofthePayNotesforagivenpayperiodaretobeprovidedwiththeProgress
PaymentinvoicewhenitissenttotheProjectManager(AGENCY)forreviewand
approvalforpayment.
1.3.47RedLineMarkups(AsͲBuiltPlans)
x TheConstructionObserver(Inspector)shallkeepanindependentrecordofallchanges
fromtheplansinadairyandinredinkonafullͲsizesetoftheconstructionplansor
withredlinesonadigitalcopyoftheconstructionplansusingBluebeamorAdobe.The
redlinemarkupsaretobeclearlylabeled“ASͲBUILT”onthesheetsand/orelectronic
filename.
x Allcorrections,repairs,revisions,andadditionaldetailsnecessarytodepictthework
asitwasconstructedshallbeshownontheredlinemarkups(asͲbuiltplans),whether
consideredthepracticeofengineeringornotandwhetherconsideredachangetothe
constructioncontractornot.
x Theredlinemarkups(asͲbuiltplans)shallbecurrentwithentriesmadethedatethe
constructionchangesweremade.
x ChangesmadepursuanttoaChangeOrdershallbeidentifiedontheplanswiththe
ChangeOrdernumber.
x Photographsofthechangesshallbetakenandreferencedontheredlinemarkups(asͲ
builtplans)byreferencenumber.
x Theredlinemarkups(asͲbuiltplans)willbereviewedaminimumofoncepermonth
bytheResidentEngineer.
Page29of37
x Atthecompletionofconstructionactivities,theredͲlinemarkups(asͲbuiltplans)are
tobedeliveredtotheAGENCY.TheAGENCYwillprovidetheredͲlinemarkups(asͲbuilt
plans)totheEngineerofRecordforthegenerationoffinalRecordDrawings.
1.3.48RequestsforInformation(RFI’s)
x Contractorrequestsforinformation(RFI’s)shallbeansweredinwritingbytheResident
Engineer.
x IftheRFIisforinformationmissingfromtheplansorspecifications,itshallbe
forwardedtotheEngineerofRecordforaresponse.
x TheDocumentationSpecialistshallmaintainandupdateaRFItrackingspreadsheet
containingallRFI’sandresponses.
1.3.49Training
x WhentheconstructioncontractincludesabiditemforTraining,theDocumentation
Specialistshallmonitorthepaymentamountofthatbiditemforcompliance.
x TheResidentEngineershallmonitorContractor’scomplianceandnotifyProject
Manager(AGENCY)whenContractorisnotincompliance.
1.3.50SerialLetters
x Seriallettersshallbeusedtotracktimesensitivecommunicationsthatrequire
responses,suchasnotices,claims,protests,etc.
x TheConstructionManagershallconsultwiththeResidentEngineerandprepare
responsestoallserialletters.PriortosendingtotheContractor,allresponsesshallbe
reviewedbytheProjectManager(AGENCY),Engineer(AGENCY),andAGENCY’s
Attorney(ifnecessary).
x TheDocumentationSpecialistshallmaintainandupdateseriallettertracking
spreadsheetforallprotests,disputes,claims,requestsforadditionaltime,andallother
timesensitivecorrespondencebetweentheAGENCYandContractor.
1.3.51ProgressPaymentForms
x Followingawardoftheconstructioncontract,theProjectManager(AGENCY)shall
enterandlockthebiditemsandunitpricesontheAGENCY’sProgressPaymentform
andforwardtotheResidentEngineerandDocumentationSpecialistforusein
preparingprogresspayments.
x Followingexecutionofachangeorder,theProjectManager(AGENCY)shallinputand
lockthechangeorderitemsandestimatesontheAGENCY’sProgressPaymentform
andforwardtotheResidentEngineerandDocumentationSpecialistforusein
preparingprogresspayments.
x Alltheformulacolumnsshallbelocked.
1.3.52ForceAccount(Spec.Sect.1Ͳ09.6)
x TheConstructionObserver(Inspector)shalltrackforceaccountworkonAGENCY
approvedforms.Theformsshallbecompletedbytheendofeachdayforceaccount
workwasperformed.TheConstructionObserver(Inspector)shallsignandobtainthe
Page30of37
signatureoftheContractor’srepresentativeonallcompletedforceaccounttracking
formsbeforetheendofthefollowingday.
x TheConstructionObserver(Inspector)shallforwardallcompletedandsignedforce
accountformstotheResidentEngineer,DocumentationSpecialistforreview.Once
reviewed,acopyistobesenttotheProjectManager(AGENCY).
1.3.53ProgressPayments(Spec.Sect.1Ͳ09.9)
x ProgresspaymentinvoicesshallbepreparedandsignedbytheDocumentation
SpecialistorResidentEngineeronformsapprovedbytheAGENCY.Allbiditem
quantitiesenteredintoaprogresspaymentinvoiceshallbebasedonthepaynotes
generatedforthatpayperiod.
x AllquantitiesinputbyCONSULTANTwillbefromthePayNoteSummaryspreadsheet.
TheResidentEngineershallcheckmeasurementandpaymentprovisionsfor
completedbiditemstoensurethatallmeasurementandpaymentconditionshave
beenmet.
x Theestimatetocompleteforeachbiditemlistedontheprogresspaymentinvoice
shallbebasedontheactualestimatedquantitytocompleteeachbiditemandnota
formula.TheseestimatesaretobeprovidedbytheConstructionObserver(Inspector)
andreviewedbytheResidentEngineer.
x CompletedprogresspaymentinvoicesshallbereviewedandsignedbytheProject
Manager(AGENCY)priortosubmittaltotheContractorforsignature.
x TheEngineer(AGENCY)willreview,sign,andsubmitthesignedprogresspayment
invoicestoAGENCY’sFinanceDepartmentforpayment.PaymenttotheContractor
mustbemadewithin30daysfromthedatetheAGENCYreceivestheProgress
PaymentinvoicesignedbytheContractor.
1.3.54MaterialsOnHand(MOH)(Spec.Sect.1Ͳ09.8)
x Paymentformaterialsonhandwillbemadeinstrictcompliancewiththeconstruction
contractspecifications.
1.3.55FieldDirectives(Spec.Sect.1Ͳ04.4)
x Writtenfielddirectivesshallbeusedtoenforcecorrectionnoticesorinitiatechange
ordersandwillbeissuedbytheResidentEngineerorConstructionObserver
(Inspector)onAGENCYapprovedforms.
x Writtenfielddirectivesforcorrectionnoticesshallincludeadescriptionofrequired
workandasignaturefromtheResidentEngineerorConstructionObserver(Inspector).
x Writtenfielddirectivesforchangesshallincludeadescriptionofrequiredwork,an
approximateestimateoftheworkandsignaturesfromtheResidentEngineeror
ConstructionObserver(Inspector)andContractor’srepresentative.
1.3.56ChangeOrders
x ChangeordersshallbepreparedbytheResidentEngineeronAGENCYapprovedforms,
andincompliancewithSpec.Sect.1Ͳ04.4.
x ChangeordersshallbereviewedandsignedbytheEngineerofRecord,Project
Manager(AGENCY),Engineer(AGENCY),andotherAGENCYofficialsasmaybe
requiredbyAGENCYPoliciesandProcedures.
Page31of37
x UponapprovalandissuancebytheEngineer(AGENCY),thechangeordershallbegiven
totheContractorforendorsement.IftheContractorfailstoendorseandreturnthe
changeorder,requestanextensionoftimeforendorsementorrespondsin
accordancewithSpec.Sect.1Ͳ04.4within14daysofdeliverytotheContractor,the
changeordermaybeissuedunilaterallybytheAGENCY.
x Changeordersshallincludeonlyforceaccountwork,biditemwork,orlumpsumwork.
Usinganycombinationoftheaboveinasinglechangeorderisdiscouraged.
x Preparationofchangeordersshallbeginimmediatelyfollowingissuanceoffield
directivesorthedecisionismadeforaplannedchange.Inthecaseofaplanned
change,theAGENCY’sAttorneymustmakethedeterminationthatthechangeisnota
newproject.TheResidentEngineershallprepareallchangeordersasfollows:
1. Completeadescriptionofchange.Thisshallbeadetailedexplanationofthe
specificchangesbeingmadetothebiditemsand/orquantitiesinthescheduleof
prices,specialprovisionsections,standardplansheets,and/orengineeringplan
sheetsincludedintheconstructioncontract.
2. Prepareacostestimate,roundingthetotalamountuptothenearestlevelthat
coincideswiththelevelofconfidenceintheestimate.Theestimateinthechange
orderresultsinanincreaseordecreaseinconstructioncontractamountwhenthe
changeorderisissued.Itdoesnotnecessarilyequatetotheamountactuallypaid
asthatwilldependupontheactualworkperformed.Attheendoftheconstruction
contract,aquantityreconciliationchangeorderwillbeissuedthatwillresolveall
overrunsandunderruns.
3. ObtainachangeorderquotationorestimatefromtheContractor.Theprimary
purposeforobtainingthisinformationistoverifythecostestimateandadjustthe
changeorderestimateasnecessary.However,shouldtheContractorfailto
providetherequestedinformationinatimelymanner,thechangeordershouldbe
finalized,approvedandsenttotheContractorforendorsement.
4. Establishforceaccountestimate,biditem,ornegotiatedlumpsumamountforthe
equitableadjustment.Forceaccountchangeordersorpreferable.
5. Updatelaborratelistandequipmentratelistifnecessary.
6. Completeareasonforthechange.Thisshallbeadescriptionoftheissue(s)being
resolved,underlyingcause(s),ifknown,andjustificationforthework.
7. Executethechangeorder.
x Achangeorderhasfixedunitpricesandestimatedbiditemquantities,fixedasalump
sum,oranopenestimateinthecaseofforceaccount.Inanycaseitmustbeexecuted
immediatelyinordertopaytheContractorforthework.Forceaccountrecordsare
similartopaynotesinthattheyserveasthedocumentationforprogresspayment
invoices.
x MinorChangesshallnotbeused.Theconstructioncontractdoesnotincludethebid
item“MinorChanges”.
x EquitableAdjustmentincludesthecostofthelabor,equipment,materials,biditems,
ifany,andthecostsofnonͲmainofficeextendedoverhead,ifany(Spec.Sect.1Ͳ09.4).
x FullyexecutedchangeordersshallbefiledbytheDocumentationSpecialistinthe
PROJECTdocumentation,changemanagementfolder.
x TheDocumentationSpecialistshallmaintainandupdateaChangeOrdertracking
spreadsheetthatshallincludeallFieldDirectivesandChangeOrders.
1.3.57Protests
Page32of37
x TheprocedurefortheContractortofileaprotestissetforthinSpec.Sect.1Ͳ04.5.
x TheprocedurefortheContractortofileaclaimissetforthinSpec.Sect.1Ͳ09.11(2).
x TheResidentEngineershallproposeresolutionofprotests,disputesandclaims.The
proposedresolutionsshallbereviewedandapprovedbytheConstructionManager
andtheProjectManager(AGENCY).
x ThefinaldeterminationandissuanceoftheresponsetotheContractorshallbemade
bytheEngineer(AGENCY).
x TheDocumentationSpecialistshalltrackallprotests,disputesandclaimsonaserial
lettertrackingspreadsheet.
1.3.58Notices
x ThemethodforservingandreceivingnoticesissetforthinSpec.Sect.1Ͳ05.15.Notices
fromtheContractoraretobesenttotheProjectManager(AGENCY).Noticestothe
ContractorshallbepreparedbytheResidentEngineerandissuedbytheProject
Manager(AGENCY).
1.3.59PublicWorksDepartmentNotification
x TheConstructionObserver(Inspector)shallberesponsiblefornotifyingPublicWorks
DepartmentemployeeswhenthefollowingworkisscheduledintheContractor’s
weeklylookͲaheadschedule.
9 Water–Mainshutoff/turnon,pressuretesting,disinfection,puritytesting,
connectionstolivemains.
9 SanitarySewer–Pipeinspectionvideo,pressuretesting,manholeinspection.
9 SurfaceWater–Pipeinspectionvideo,pressuretesting,manholeandcatchbasin
inspection.
9 StreetMaint.–Curb/gutterinspection,sidewalkinspection,pavementinspection.
9 TrafficSignalShop–Signalcontrollercabinettestingandinspection,powercabinet
inspection,vehicledetectioncamerainspection,point/tilt/zoom(PTZ)camera
inspection,luminaireinspection.
1.3.60PublicOutreach
x ManageSUBCONSULTANTprovidingpublicoutreachservices.TheConstruction
ManagerisresponsibleforensuringthattheSUBCONSULTANTcomplieswiththe
requirementsofTaskS2.
x TheResidentEngineershallreviewpublicoutreachmaterialssubmittedforreviewby
SUBCONSULTANTperTaskS2,priortodeliverytoProjectManager(AGENCY)for
publicationbyAGENCY.
x TheDocumentationSpecialistshallensurethatthepublishedpublicoutreach
materialsarefiledinthePROJECTconstructiondocumentation.
1.4CONTROLLINGORDEROFCONSTRUCTIONCONTRACTDOCUMENTS(Spec.Sect.1Ͳ04.2)
1. Addenda
2. ProposalForm
3. SpecialProvisions
4. ContractPlans
5. StandardSpecifications
Page33of37
6. ContractingAgency’sStandardPlansorDetails(ifany)
7. WSDOTStandardPlansforRoad,Bridge,andMunicipalConstruction
1.5CMCONSTRUCTIONOFFICE
x ConstructionOfficeͲTheCONSUTLANT’sconstructionofficeshallbeprovidedby
agreementbetweentheContractor,theCONSULTANT,and/ortheAGENCY.
x ConstructionOfficeEquipment–Equipmentshallbeprovidedbyagreement.Inthe
eventthereisadelayinpower,cable,orphoneconnectionsorequipmentdeficiency
ofanykind,itshallbetheresponsibilityoftheCONSULTANTtotemporarilyprovide
suchconnectionsand/orequipmentnecessarytoperformthedutiesofthe
CONSULTANT.TheAGENCYwillcompensatetheCONSULTANTforsuchtemporary
provisionofconnectionsand/orequipmentrequiredtobeprovidedbyothers.
x WeeklyConstructionMeetingsͲMeetingswillbeheldintheCONSULTANT’sor
Contractor’sconstructionofficewiththeabilityforparticipantstoattendvirtually.
ThesemeetingsmaybeheldvirtuallyviaMicrosoftTeams,Zoom,GoToMeeting,or
othersoftwareplatformaccessibletoallparticipants,ifagreedtobyAGENCY,
CONSULTANTandContractor.
x CMCONTRACTScopeofWorkͲAhardcopyofthisCONTRACTScopeofWorkshallbe
alwayskeptandavailableintheCONSULTANT’sconstructionoffice.
x PlansandSpecificationsͲAhardcopyoftheconstructioncontractCAGͲ22Ͳ062,
Volumes1and2,shallbealwayskeptandavailableintheCONSULTANT’sconstruction
office.
x ChangeTrackingͲTheConstructionObserver(Inspector)shalltrackandrecordall
changestothedesignplansonaseparateredͲlinemarkupsetofdrawings.TheredͲ
linemarkupsetofdrawingsmayconsistofahardcopyofthedesignplansoradigital
copyofdesignplans,compatiblewithAdobeand/orBluebeam.Changesshallbe
recordedinredthedayoforthedayfollowingthechange.TheredͲlinemarkupsetof
drawingsshallbereviewedbytheResidentEngineeraminimumofonceamonth.
x PermitsͲHardcopiesofallissuedprojectpermitsshallbealwayskeptandavailablein
theCONSULTANT’sconstructionoffice.
x ProgressScheduleͲAhardcopyofthecurrentProgressSchedulefortheentireproject
shallbealwayskeptandavailableintheCONSULTANT’sconstructionoffice.The
ResidentEngineershalltracktheconstructionprogresswithayellowhighlighterpen.
TheconstructionprogresstrackingshallbebasedontheProgressPayments(Pay
Notes)andbehighlightedontheProgressScheduleassoonasavailable.
x PostingNotices–TheResidentEngineershallverifyanddocumentthattheContractor
postsnoticesasrequiredbySpec.Sect1Ͳ07.9(2).Noticesandpostersshallbeplaced
inareasonthejobsitethatareaccessibleforemployeestoread.IftheContractor
doesnothaveaconstructionofficeonͲsite,thentheContractormaypostthenotices
attheircorporateofficeandprovideeachandeveryemployeeworkingontheproject
withcopiesoftherequirednotices.
TASKS1–PUBLICOUTREACHSERVICES
ThefollowingitemsaretobeperformedbyStepherson&AssociatesCommunicationsunderthis
task.
Assumption(s)
Page34of37
ThebudgetshowninExhibitE1isforConstructionPhase1–Preliminaryactivitiesandproject
startup.
S2.1GENERAL
x ImplementpublicoutreachforthePROJECTwithinputfromtheAGENCYandoversight
fromCONSULTANT.
x Coordinationandmeetingswithand/orwithoutAGENCYandCONSULTANT.
x Attendweeklyconstructionmeetingsandprovideacopyoftheupdatedweekly
contacts.
S2.1.1ObjectivesforPublicOutreach
1. ToinformthePublicofthepurposeofthePROJECT.
9 PurposeͲThepurposeofthePROJECTistoperformpaintingandseismicretrofit
workontheBridgeWayBridge(BridgeNo.:RentonͲ42).
9 BridgeOwnershipandMaintenanceHistory–TheBronsonWayBridgewas
constructedin1939.Sincethattime,until2018,thebridgewasownedand
maintainedbytheWashingtonStateDepartmentofTransportation(WSDOT).On
January2,2018,aTurnbackAgreementwasexecutedbetweenRentonand
WSDOT.Pertheagreement,BronsonWayN,S2ndStreet,S3rdStreetandMill
AvenueSarenolongerpartofStateRoute(SR)900andarenowthesole
responsibilityofRentontomaintain.Inadditiontothesestreets,ownershipand
maintenanceresponsibilitiesfortheBronsonWayBridgeweretransferredto
Renton.ThebridgewaslastpaintedbyWSDOTin1999.Overthelifeofthebridge,
ithasbeenrepaintedona20Ͳyearcycle.AccordingtoWSDOTrecords,thisbridge
hasnotreceivedaseismicretrofitsinceitwasbuilt.TheWashingtonState
legislaturegranted$3milliontorepaintthebridgeandperformaseismicretrofit.
9 Painting–ThePROJECTwillremoveandreplacetheexistingpaintsystemonthe
bridge.Thepaintsystemprotectsthemainspansteelgirdersfromcorrosion.
Failureofthepaintsystemallowscorrosiontooccurtosteelmembers.Corrosion
resultsinsectionlossinthesteel.Sectionlossinthesteelresultsinreducedload
carryingcapacityofthebridge.Replacingthepaintsystemprotectsthesteel
membersandthuspreservestheloadcarryingcapacityofthemainspansteel
girders.
9 SeismicRetrofit–ThePROJECTwillremoveandreplacetheexistingrocker
bearingsandfixedbearings.Rockerbearingsareknowntoperformpoorlyduring
significantseismicevents.Aseismicanalysiswasdevelopedtoidentifyseismically
vulnerableareasofthebridge.Themostcosteffectiveseismicretrofitoptionwas
determined.Namely,replacementoftheexistingrockerbearingsandfixed
bearingswithnewelastomericbearingpadsandassociatedconcretebearing
blocks.
9 OtherRepairs–Theprojectwillreplacetheasphaltwearingcourseonthebridge
deckandtheexistingbridgeexpansionjoints.Theprojectwillrepairdamaged
concretecurbsonthebridgedeck.
2. ToinformthePublicofthevehicleandpedestriantrafficimpactsanddetourroutes
duringafullclosureofthebridgeand/orlaneclosuresacrossthebridge.
9 TheconstructioncontractanticipatedthreemainelementsofWork:(1)cleaning
andpainting;(2)seismicretrofit;(3)bridgedeck.Theanticipatedsequenceof
Page35of37
theseelementswas1,2,3.However,thecontractorisresponsiblefordetermining
asequencethatcompletestheWorkwithintheTimeforCompletionspecifiedin
Spec.Sect.1Ͳ08.5,withtherestrictionsspecifiedinSpec.Sect.1Ͳ07.23(1)forlane
closuresandSpec.Sect.1Ͳ07.23(4)forafullbridgeclosure.
9 Closureoftheoutsidetravellanesandadjacentsidewalksacrossthebridgeis
anticipatedforbridgepaintingactivitiesandallowedforintheconstruction
contract.
9 Afullclosureofthebridge,24hours/day,isanticipatedforseismicretrofitand
bridgedeckwork.Theconstructioncontractallowsforasinglefullclosureperiod
of28consecutivecalendardays.
9 TheContractorhastentativelyproposedtochangethesinglefullclosureperiod
intotwoseparateperiods.ThishasnotbeenapprovedbytheAGENCY.However,
thisdemonstratesthatthesequenceofworkand/ordurationofconstruction
activitiesissubjecttochange.
9 OncetheContractor’sProgressScheduleisofficiallysubmittedtotheAGENCYfor
reviewandtheProgressScheduleisapproved,itwillprovidesometimeframesfor
thelaneclosureperiodsandfullclosureperiod.Thisinformationistobeprovided
tothePublicbymeansofpostingitonaPROJECTwebpage.
9 TheContractoristoprovideaweeklylookͲaheadscheduleforatwoͲweekperiod
beginningthedayfollowingthedateoftheweeklyconstructionmeeting.These
scheduleupdatesaretobeprovidedtothePublicbymeansofpostingitona
PROJECTwebpage.
3. ToinformthePublicofthewaysandmeanstocommunicateconcernstothe
ConstructionTeamregardingconstructionactivities.
9 AProjectInformationWebSitewitheͲmailaddressandphonenumber.
9 AdedicatedeͲmailaddresspostedonwebpage.
9 Adedicatedphonenumberpostedonwebpage.
S2.1.2PublicOutreachPlan
x DevelopaplanforprovidinginformationtothePublicaboutthePROJECT.
x Identifystakeholdersandstrategiesforeffectivelygettinginformationouttothem.A
listofstakeholdersandsuggestedmethodsforpublicoutreacharelistedbelow.
9 Businessownersintheimmediatevicinityofthebridge(accessduringclosures)–
inpersonvisitstoprovideinformationfliersandaddressquestions.
9 CityofRentonParksDept.(LibertyParkparking)–eͲmailwithProgressSchedule
attachedandsummaryoffullclosuredates.
9 CityofRentonPoliceDept.(PatrolDistrict21)–eͲmailwithProgressSchedule
attachedandsummaryoffullclosuredates.
9 Downtownresidents–prepareprojectinformationpostcardandprovideto
RentonCommunicationsformailing.
9 Generalpublic–preparemediareleaseandprovidetoRentonCommunications
forrelease.
9 NorthRentonCommunity(trafficinvicinity)–attendcommunitymeetingtogive
shortpresentation(ifrequested),provideprojectinformationfliersandaddress
questions.
9 KingCountyLibrarySystem(downtownlibraryparking)–eͲmailwithProgress
Scheduleattachedandsummaryoffullclosuredates.
Page36of37
9 KingCountyMetro(busroutes)–eͲmailwithProgressScheduleattachedand
summaryoffullclosuredates.
9 RentonChamberofCommerce(impactstobusinesses)–eͲmailwithproject
informationflierandsummaryoffullclosuredates.
9 RentonFarmersMarket(everyTuesday3PMto7PM,June7toSept27)–if
constructionstartsbeforeSept.27,provideinformationfliers.
9 RentonRegionalFireAuthority(FireStation11response)–eͲmailwithProgress
Scheduleattachedandsummaryoffullclosuredates.
9 RentonSchoolDistrict(schoolbusroutes)–eͲmailwithProgressSchedule
attachedandsummaryoffullclosuredates.
9 RepublicServices(solidwastepickup)–contactdispatchtodiscussfullclosure
datesandplanfortruckaccesstoNRiversideDriveforsolidwastepickup.
9 UnitedStatesPostalService(postalroutes)–contactpostmastertodiscussfull
closuredatesandplanforaccesstoNRiversideDriveformaildelivery.
9 WashingtonStateDepartmentofTransportation(WSDOT)ͲeͲmailwithproject
informationflierandsummaryoffullclosuredates.
x DevelopmentofPublicOutreachMaterials
9 ProjectInformationFlier–Briefsummaryaboutproject,anticipatedfullclosure
dates,website,eͲmailandphonenumber.IncludeADAInformationandTitleVI
Notice,providedbyProjectManager(AGENCY).Themailershallbereviewedby
theResidentEngineerpriortodeliverytoProjectManager(AGENCY)for
publicationbyAGENCY.
9 ProjectInformationMailer–Projectname,anticipatedfullclosuredates,website,
eͲmailandphonenumber.IncludeADAInformationandTitleVINotice,provided
byProjectManager(AGENCY).ThemailershallbereviewedbytheResident
EngineerpriortodeliverytoProjectManager(AGENCY)forpublicationby
AGENCY.
9 ProjectInformationMediaReleaseͲBriefsummaryaboutproject,anticipatedfull
closuredates,website,eͲmailandphonenumber.Themediareleaseshallbe
reviewedbytheResidentEngineerpriortodeliverytoProjectManager(AGENCY)
forpublicationbyAGENCY.
9 ProjectInformationWebSite–Projectinfo,FAQ,ProgressSchedule,weeklylookͲ
aheadschedule,anticipatedfullclosuredates,eͲmail,phonenumber.Thewebsite
shallbereviewedbytheResidentEngineerandProjectManager(AGENCY)prior
togoingliveforthefirsttimetothePublic.Updatestothewebsitecanoccur
withoutadditionalreview.
9 EͲmailUpdates–UpdatedProjectinfoasapplicable.TheeͲmailshallbereviewed
bytheResidentEngineerpriortodistribution.
x RespondingtoPublicInquiries
9 RespondtoprojectquestionsreceivedviaeͲmailorphonefromthepublic.
9 WhendifficultorhighlytechnicalquestionsareaskedbythePublicthathaveno
obviousanswer,sendthequestionstotheResidentEngineerandProjectManager
(AGENCY)foraresponseand/oraddressthequestionsintheweeklyconstruction
meetings.
9 Documentallcontactsmadeincludingthename,contactinformation,and
descriptionofthesubstanceofthecontact.Maintainaseparatefileforany
commitmentsmade.
9 Generateweeklycontactreportfordiscussionatweeklyconstructionmeetings.
Page37of37
ADDITIONALSERVICES
TheAGENCYwillrequireadditionalservicesoftheCONSULTANTforfutureconstructionphasesof
thisproject.SectionBsummarizesthefutureconstructionphasesanddescribestheworkanticipated
foreach.
TheCONTRACTScopeofWorkforadditionalserviceswillbedeterminedbasedonanticipatedor
unanticipatedprojectneedsorotherconsiderationsatthesolediscretionoftheAGENCY.Thiswork
mayincludeitemsidentifiedinthecurrenttaskauthorizationsaswellotheritems,whichmay
include,butarenotnecessarilylimitedtothefollowing:
x AdditionalConstructionManagementServices
x AdditionalInspectionServices
x AdditionalDocumentationServices
x AdditionalMaterialsTestingServices
x AdditionalPublicOutreachServices
x OtherservicesnotspecificallyreferencedthisCONTRACTScopeofWork.
TheseserviceswillbeauthorizedunderfuturesupplementalagreementstothisCONTRACT.The
CONSULTANTshallnotproceedwiththeworkuntiltheAGENCYhasauthorizedtheworkandissued
anoticetoproceed.
CONTRACT:CAGͲ22Ͳ255
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
PRIMECONSULTANT:TRANTECHENGINEERING,LLC
DIRECT(RAW)LABOR(DL):
Classification DL HOURS TOTAL
Principal $106.65 x 0 = $0
ConstructionManager $94.66 x 10 = $947
ResidentEngineer $94.66 x 34 = $3,218
Inspector $71.90 x 20 = $1,438
DocumentationSpecialist $53.92 x 96 = $5,176
Admin $47.93 x 2 = $96
DLSubtotal=162 $10,875
INDIRECTCOSTRATE(ICR)
DLxICRof 130.57% x $10,875 =$14,200
FEE(PROFIT)
DLxFEE 30.00% x $10,875 =$3,263
DL+ICR+FEE=$28,338
DIRECTNONͲSALARYCOSTS(DNSC)
Mileage 1000 x $0.625 = $625
MaterialsTesting = $1,500
SUBTOTAL =$2,125
TOTALFORPRIME = $30,463
TOTALFORPRIME(ROUNDED)=$30,500
SUBCONSULANTS
PublicOutreach = $4,400
TOTALFORSUBCONSULTANTS = $4,400
TOTALFORSUBCONSULTANTS(ROUNDED)=$4,400
TOTAL=$34,900
EXHIBITD
PRIMECONSULTANTCOSTCOMPUTATIONSSUMMARY
NEGOTIATEDHOURLYRATE
Page1of4
CONTRACT:CAGͲ22Ͳ255
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
PRIMECONSULTANT:TRANTECHENGINEERING,LLC
"Doc.
"Inspector" Specialist"
Principal Const Resident Const.Sen. Office Admin2/3
Manager Engineer Inspector Engineer
$106.65 $94.66 $94.66 $71.90 $53.92 $47.93
TASK1ͲCONSTRUCTIONMANAGEMENTSERVICES
ConstructionPhase1ͲPrelimactivitiesandstartup 0 10 34 20 96 2 $10,875
Total 0 10 34 20 96 2 $10,875
IndirectCostRate(ICR) ICR=DLxICR% ICR%=130.57%ICR=$14,200
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$3,263
DirectNonͲSalaryCost(DNSC) Mileage=1000 Rate=$0.625 DNSC=$625
MaterialsTesting=$1,500.00 MaterialsTesting=$1,500
TotalDNSC=$2,125
Task1Total=$30,463
Task1Total(Rounded)=$30,500
TotalHours=0 10342096 2
TotalMileage=1000
TotalDL=$10,875
TotalICR=$14,200
TotalFEE=$3,263
TotalDNSC=$2,125
TOTAL=$30,463
TOTAL(ROUNDED)=$30,500
DirectLabor(DL)
EXHIBITD
PRIMECONSULTANTͲCOSTESTIMATEDETAIL
Task Description Total
Page2of4
CONTRACT:CAGͲ22Ͳ255
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
PRIMECONSULTANT:TRANTECHENGINEERING,LLC
DirectLaborOverhead Fee AllInclusive
Rate 130.57% 30% HourlyRate
NTE NTE NTE NTE
Principal $106.65 $139.25 $32.00 $277.90
ConstructionManager $94.66 $123.60 $28.40 $246.66
ResidentEngineer $94.66 $123.60 $28.40 $246.66
ConstructionSeniorInspector $71.90 $93.88 $21.57 $187.35
OfficeEngineer $53.92 $70.40 $16.18 $140.50
Administrative2/3 $47.93 $62.58 $14.38 $124.89
EXHIBITD
PRIMECONSULTANTͲACTUALSNOTTOEXCEED(ANTE)TABLE
JobClassifications
Page3of4
July 22, 2022
Tran Tech Engineering, LLC
12011 NE 1st street, Suite 305
Bellevue, WA 98005
Subject: Acceptance FYE 2021 ICR Risk Assessment Review
Dear Kash Nikzad:
Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed
FYE 2021 ICR of 130.57% of direct labor. This rate will be applicable for WSDOT
Agreements and Local Agency Contracts in Washington only. This rate may be subject
to additional review if considered necessary by WSDOT. Your ICR must be updated on
an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with your firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultantrates@wsdot.wa.gov.
Regards;
ERIK K. JONSON
Contract Services Manager
EKJ:ah
Page 4 of 4
Exhibit D
CONTRACT:CAGͲ22Ͳ255
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
SUBCONSULTANT:STEPHERSONANDASSOCIATESCOMMUNICATIONS,INC.
Principal Senior Senior Assoc. Assoc. Assoc. Project Project Graphics
Assoc.2 Assoc.1321AdminCoord
$85.00 $85.00 $85.00 $70.00 $70.00 $55.00 $65.00 $55.00 $60.00
TASKS2ͲPUBLICOUTREACHSERVICES
ConstructionPhase1ͲPrelimactivitiesandstartup 007000446$1,435
Total 007000446$1,435
IndirectCostRate(ICR) ICR=DLxICR% ICR%=166.91%ICR=$2,395
Fee(Profit) FEE=DLxFEE% FEE%=30.00%FEE=$431
DirectNonͲSalaryCost(DNSC) Mileage=200 Rate=$0.625 DNSC=$125
TotalDNSC=$125
TaskS2Total=$4,386
TaskS2Total(Rounded)=$4,400
TotalHours=007000446
TotalMileage=200
TotalDL=$1,435
TotalICR=$2,395
TotalFEE=$431
TotalDNSC=$125
TOTAL=$4,386
TOTAL(ROUNDED)=$4,400
EXHIBITE1
SUBCONSULTANTͲCOSTESTIMATEDETAIL
Task Description
DirectLabor(DL)
Total
Page1of3
CONTRACT:CAGͲ22Ͳ255
PROJECT:BRONSONWAYBRIDGEͲSEISMICRETROFITANDPAINTING
SUBCONSULTANT:STEPHERSONANDASSOCIATESCOMMUNICATIONS,INC.
DirectLaborOverhead Fee AllInclusive
Rate 166.91% 30% HourlyRate
NTE NTE NTE NTE
Principal $85.00 $141.87 $25.50 $252.37
SeniorAssociate2 $85.00 $141.87 $25.50 $252.37
SeniorAssociate1 $85.00 $141.87 $25.50 $252.37
Associate3 $70.00 $116.84 $21.00 $207.84
Associate2 $70.00 $116.84 $21.00 $207.84
Associate1 $55.00 $91.80 $16.50 $163.30
ProjectAdministrator $65.00 $108.49 $19.50 $192.99
ProjectCoordinator $55.00 $91.80 $16.50 $163.30
GraphicsandCreative $60.00 $100.15 $18.00 $178.15
EXHIBITE1
PRIMECONSULTANTͲACTUALSNOTTOEXCEED(ANTE)TABLE
JobClassifications
Page2of3
August 23, 2022
Stepherson & Associates Communications
234 9th Avenue North
Seattle, WA 98109
Subject: Acceptance FYE 2021 ICR Risk Assessment Review
Dear Josh Stepherson:
Assessment review and the economic hardship approved by our WSDOT Audit Office
of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2021 ICR of
166.91%. This rate will be applicable for WSDOT Agreements and Local Agency
Contracts in Washington only. This rate may be subject to additional review if
considered necessary by WSDOT. Your ICR must be updated on an annual basis.
Costs billed to agreements/contracts will still be subject to audit of actual costs, based
on the terms and conditions of the respective agreement/contract.
This was not a cognizant review. Any other entity contracting with your firm is
responsible for determining the acceptability of the ICR.
If you have any questions, feel free to contact our office at (360) 705-7019 or via email
consultantrates@wsdot.wa.gov.
Regards;
ERIK K. JONSON
Contract Services Manager
EKJ:mya
Page 3 of 3