Loading...
HomeMy WebLinkAbout20160674E002 Bethany Corner 2022-09-01 FR 046.pdf Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Matthew A. Miller, P.E. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 1 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 9/01/2022 Bethany Corner 20160674E002 046 Location Municipality AESI Project Manager AESI Field Rep SE 165th St. Renton Matthew A. Miller, P.E. Alex Ybarra, L.G. Permit No. Client/Owner Attn Requested By Mark Seek (Tiger Mountain Homes) Mark Seek Contractor Engineer/Architect General Contractor Earthwork Contractor Weather HiLine Homes Tiger Mountain Homes / Mark Tiger Mountain Sunny, 80’s THE FOLLOWING WAS NOTED: Lot 6 House- Foundation Excavation: Prior to our arrival the contractor filled for Lot 6 house foundation. Fill material consisted of gravelly sand with some silt. AESI observed and assessed the subgrade with a ½” diameter steel probe. Fill appeared to be uncompacted at the time of our site visit. AESI recommends compacting the subgrade to a firm, unyielding condition. AESI departed the site in the PM and will return upon request. Figure 1: Photo of Lot 6 building foundation subgrade.