FIELD REPORT
Date Project Name Project No. Report No.
9/01/2022 Bethany Corner 20160674E002 046
Location Municipality AESI Project Manager AESI Field Rep
SE 165th St. Renton Matthew A. Miller, P.E. Alex Ybarra, L.G.
Permit No. Client/Owner Attn Requested By
Mark Seek (Tiger Mountain Homes) Mark Seek Contractor
Engineer/Architect General Contractor Earthwork Contractor Weather
HiLine Homes Tiger Mountain Homes / Mark Tiger Mountain Sunny, 80’s
THE FOLLOWING WAS NOTED:
Lot 6 House- Foundation Excavation:
Prior to our arrival the contractor filled for Lot 6 house foundation. Fill material consisted of gravelly sand with some silt.
AESI observed and assessed the subgrade with a ½” diameter steel probe. Fill appeared to be uncompacted at the time of
our site visit. AESI recommends compacting the subgrade to a firm, unyielding condition.
AESI departed the site in the PM and will return upon request.
Figure 1: Photo of Lot 6 building foundation subgrade.