HomeMy WebLinkAboutAddendum No. 1Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 1
Page 1 of 2
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
ADDENDUM NO. 1
Federal Aid Number: STPUL-1615(005)
TIB Number: 8-1-102(038)-1
City Project Number: TED4003813
CAG 22-163
DATE OF ADDENDUM ISSUE: September 20, 2022
BID DUE DATE: October 11, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
DATE OF BID OPENING: October 13, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
NOTE TO ALL PLANHOLDERS:
This Addendum No. 1, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
CALL FOR BIDS
1. Bid Due Date and Bid Opening Date:
Sealed bids will be received until 1:00 p.m., Tuesday, October 11, 2022, at the lobby Renton
City Hall, 1055 South Grady Way, Renton, WA 98057. All supplemental documents, that are
allowed to be submitted after this date and time, shall be received at the lobby of Renton City
Hall. Sealed bids will be opened and publicly read via Zoom videoconferencing web
application at 1:00 p.m., Thursday, October 13, 2022. Any bids received after the published
bid submittal time cannot be considered and will not be accepted.
BID PROPOSAL
2. DELETE Proposal (Pages 13-25) and REPLACE with attached Proposal (Pages 13-25). Revisions
include:
•ReviseProjecttitlenameto“RainierAveSCorridorImprovements—Phase4(S3rdSttoNW3rdPL)•UpdatequantityofBidItemNo.A29“FiberReinforcedHMACl.1/2”PG64-22”.•UpdatequantityofBidItemNo.A31“HMACl.1/2”PG70-22”.•UpdatequantityofBidItemNo.A32“HMAforPrelevelingCI.Y2”PG70-22”.•UpdatequantityofBidItemNo.A33“PlaningBituminousPavement”.•UpdatequantityandunitofBidItemNo.Al51“TemporaryPavementMarking”.•Page23reviseBidItemNo.Cl0toDl0“ResolutionofUtilityConflictsforJointUtilityTrench”.•ReviseunitpriceofBidItemNo.Dl1“RemovalofStructureandObstruction”toLumpSum.SPECIALPROVISIONS3.RevisetheSpecialProvisionSection5-04.2Materials(PageSP-98)asfollows:Section5-04.2issupplementedwiththefollowing:PavementReinforcingFibers9-19TackcoatshallbeemulsifiedasphaltgradeCRS1asspecifiedinSection902.1(6)CationicEmulsifiedAsphalt,oftheStandardSpecificationsandwillbeusedatthelocationsspecifiedorasdirectedbytheEngineer.AllcostsfortackcoatshallbeconsideredincidentaltoandincludedinotherunitContractprices.ALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECT.Sincerely,BobHanson,.E.TransportationDesignManagerCityofRentonReceiptacknowledged,andconditionsagreedtothis_____dayof_________,2020Bidder_________________________________SignatureRainierAveSCorridorImprovements—Phase4AddendumNo.1Page2of2
CITY OF RENTON
Rainier Ave S Corridor Improvements – Phase 4
(S 3rd St to NW 3rd Pl)
Federal Aid # STPUL-1615(005)
TIB # 8-1-102(038)-1
Project No. CAG-22-163
CALL FOR BIDS
Sealed bids will be received until 1:00 p.m., Thursday, September 29, 2022, at the lobby of Renton City Hall, 1055
South Grady Way, Renton WA, 98057. Sealed bids will be opened and publicly read via the Zoom application video-
conferencing web application at 2:00 p.m., Thursday, September 29, 2022 (60 minutes after published bid submittal
time). Any bids received after the published bid submittal time cannot be considered and will not be accepted.
Sealed bids will be received until 1:00 p.m., Tuesday, October 11, 2022, at the lobby Renton City Hall, 1055 South
Grady Way, Renton, WA 98057. All supplemental documents, that are allowed to be submitted after this date and
time, shall be received at the lobby of Renton City Hall. Sealed bids will be opened and publicly read via Zoom video-
conferencing web application at 1:00 p.m., Thursday, October 13, 2022. Any bids received after the published bid
submittal time cannot be considered and will not be accepted. [Modified per Addendum #1]
•The bid opening meeting can be accessed via videoconference by:
•Clicking this link to join the zoom meeting:
•https://us02web.zoom.us/j/84003162615?pwd=MU9BYkdjcTlVWEtRaXRDK1dCb3c5UT09
•Using the Zoom app: Meeting ID: 84003162615; Passcode: 589618
•Via telephone by dialing 1-253-215-8782, followed by 84003162615; Passcode: 589618
•Zoom is free to use and is available at https://zoom.us/
Approved Plans, Specifications, Addenda, and Plan Holders List for this project are available on-line through Builders
Exchange of Washington, Inc., at http://www.bxwa.com. Click on bxwa.com; Posted Projects; Public Works; City of
Renton; Projects Bidding. (Note: Bidders are encouraged to Register as a Bidder, in order to receive automatic email
notification of future Addenda and to be placed on the Bidders List), contact Builders Exchange of Washington at 425-
258-1303 should you require further assistance.
All Bid Proposals shall be accompanied by a Bid Proposal deposit (certified check or Surety bond) in an amount equal
to five percent (5%) of the amount of such Bid Proposal. Should the successful Bidder fail to enter into such Contract
and furnish satisfactory performance bond within the time stated in the Specifications, the Bid Proposal deposit shall
be forfeited to the City of Renton.
The recipient, in accordance with Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-
4)and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered
into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity
to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color,
or national origin in consideration for an award.
The improvement for which Bids will be received is described below:
Construct the Rainier Ave S Corridor Improvements – Phase 4 project. The work includes but is not limited to:
temporary erosion and water pollution control; traffic control; pavement removal; new traffic signal systems,
illumination, storm drainage, curb, gutter, sidewalks, irrigation, planters, and urban design amenities. Also included
are installation of sewer and water lines; joint utility trench and franchise utility coordination; pavement grinding and
asphalt paving; property restoration; installation of new channelization and permanent signing; and all other Work
necessary to complete the Work as specified and shown in the Contract Provisions.
_________________________________________
Jason A. Seth, City Clerk
Published:
Daily Journal of Commerce: September 13, 2022, September 20, 2022, September 27, 2022
Renton Reporter: September 13, 2022, September 20, 2022, September 27, 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$
A2 1-05 Roadway Surveying 1 LS LUMP SUM $
A3 1-05 ADA Features Surveying 1 LS LUMP SUM $
A4 1-05 Record Drawings (Minimum Bid $25,000) 1 LS LUMP SUM $
A5 1-07 SPCC Plan 1 LS LUMP SUM $
A6 1-07 Training 2400 HR $ $
A7 1-08 Type B Progress Schedule (Minimum Bid $15,000) 1 LS LUMP SUM $
A8 1-09 Mobilization 1 LS LUMP SUM $
A9 1-09 Field Office Building 1 LS LUMP SUM $
A10 1-10 Project Temporary Traffic Control 1 LS LUMP SUM $
A11 1-10 Business Access Signs 40 EA $ $
A12 1-10 Project Identification Signs 2 EA $ $
A13 1-10 Traffic Control Supervisor 1 LS LUMP SUM $
A14 1-10 Flaggers 17600 HR $ $
A15 1-10 Other Traffic Control Labor 2000 HR $ $
A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $ $
A17 2-01 Clearing and Grubbing 1 LS LUMP SUM $
A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$
A19 2-02 Removal of Structures and Obstructions 1 LS LUMP SUM $
A20 2-03 Roadway Excavation Incl. Haul 14970 CY $ $
A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $ $
A22 2-03 Gravel Borrow Inc. Haul 2350 CY $ $
A23 2-05
Petroleum Contaminated Excavation and Disposal
Incl. Haul 1 EST 172,000.00$ 172,000.00$
A24 2-05
Contaminated Groundwater Treatment and
Disposal 1 EST 200,000.00$ 200,000.00$
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 13
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A25 2-09 Controlled Density Fill 800 CY $ $
A26 2-12 Construction Geotextile for Separation 16560 SY $ $
A27 4-04 Crushed Surfacing Base Course 9070 TON $ $
A28 5-04 Commercial HMA 960 TON $ $
A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $ $
A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $ $
A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $ $
A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $ $
A33 5-04 Planing Bituminous Pavement 23100 SY $ $
A34 5-04 Temporary Pavement 2860 TON $ $
A35 5-05 Reinforced Cement Concrete Pavement 110 CY $ $
A36 5-05 Cement Concrete Pavement for Driveway 50 CY $ $
A37 5-05 River Rock Treatment 360 SY $ $
A38 6-02 Cement Conc. Switchback Ramp 1 LS $ $
A39 6-11 Cement Concrete Fill Wall 10 CY $ $
A40 6-11 Concrete Cast in Place Wall 10 CY $ $
A41 6-13 Modular Block Wall 790 SF $ $
A42 6-21 Pedestrian Railing 80 LF $ $
A43 6-32 Handrail 100 LF $ $
A44 7-01 Underdrain Pipe 8 In. Diam. 140 LF $ $
A45 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 110 LF $ $
A46 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 680 LF $ $
A47 7-04 PVC Storm Sewer Pipe 6 In. Diam. 280 LF $ $
A48 7-04 PVC Storm Sewer Pipe 8 In. Diam. 150 LF $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 14
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A49 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $ $
A50 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 1110 LF $ $
A51 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $ $
A52 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $ $
A53 7-04 Temporary Stormwater Diversion 1 LS $ $
A54 7-05 Catch Basin Type 1 40 EA $ $
A55 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $ $
A56 7-05 Catch Basin Type 1L 9 EA $ $
A57 7-05 Catch Basin Type 2 48 In. Diam. 43 EA $ $
A58 7-05 Catch Basin Type 2 54 In. Diam. 2 EA $ $
A59 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ $
A60 7-05 Catch Basin Type 2 72 In. Diam. 2 EA $ $
A61 7-05 Storm Round Frame and Cover 26 EA $ $
A62 7-05 Storm Rectangular Solid Metal Cover 6 EA $ $
A63 7-05 Adjust Storm Drainage Structure 21 EA $ $
A64 7-05 Connect to Existing Drainage Structures 11 EA $$
A65 7-06 Filterra Unit 12 EA $ $
A66 7-06 Filterra Unit with Internal Bypass 2 EA $ $
A67 7-06 Filterra Unit with Peak Diversion 1 EA $ $
A68 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $ $
A69 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$
A70 7-08 Television Inspection 1 LS $ $
A71 7-10 Bioretention Planter 800 SF $ $
A72 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 15
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A73 8-02 Topsoil Type A 1710 CY $ $
A74 8-02 Bark or Wood Chip Mulch 340 CY $ $
A75 8-02 Coarse Compost 40 CY $ $
A76 8-02 Bioretention Media 190 CY $ $
A77 8-02 Seeded Lawn Installation 2310 SY $ $
A78 8-02
PS Tilia tomentosa 'PNI 6051'/ Green Mountain
Linden; 2.5" Cal., 12'-14' Ht.13 EA $ $
A79 8-02
PS Quercus frainetto 'Schmidt'/ Forest Green Oak;
2.5" Cal., 12'-14' Ht.11 EA $ $
A80 8-02
PS Parrotia persica 'Inge's Ruby Vase'/ Ruby Vase
Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $ $
A81 8-02
PS Nyssa sylvatica 'David Odom'/ Afterburner
Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $ $
A82 8-02
PS Cercidiphyllum japonicum/ Katsura Tree; 2.5"
Cal., 12'-14' Ht.2 EA $ $
A83 8-02
PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'-
12' Ht. 1 EA $ $
A84 8-02
PS Malus 'Golden Raindrops'/ Golden Raindrops
Crabapple; 2" Cal., 10'-12' Ht. 6 EA $ $
A85 8-02 PS Calocedrus decurrens/ Incense Cedar; 7'-8' Ht. 3 EA $ $
A86 8-02
PS Cornus kousa x nuttallii ' KN4-43'/ Starlight
Dogwood; 2" Cal., 10'-12' Ht. 11 EA $ $
A87 8-02
PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak
Japanese Barberry; 2 Gal, Cont. 188 EA $ $
A88 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $ $
A89 8-02
PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2
Gal. Cont. 138 EA $ $
A90 8-02
PS Euonymus japonicus 'Microphyllus'/ Boxleaf
Euonymus; 2 Gal. Cont. 435 EA $ $
A91 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 147 EA $ $
A92 8-02
PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig
Dogwood; 2 Gal. Cont. 539 EA $ $
A93 8-02
PS Rosa x 'NOATRAUM'/ Flower Carpet Pink
Groundcover Rose; 2 Gal. Cont. 26 EA $ $
A94 8-02
PS Nassella tenuissima/ Mexican Feather Grass; 1
Gal Cont.554 EA $ $
A95 8-02
PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl
Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $ $
A96 8-02
PS Hemericalis 'Stella de Oro'/ Stella de Oro
Daylily; 1 Gal. Cont. 341 EA $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 16
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A97 8-02
PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal.
Cont. 413 EA $ $
A98 8-02
PS Polystichum munitum/ Western Sword Fern; 1
Gal. Cont. 192 EA $ $
A99 8-02
PS Cotoneaster dammeri 'Eichholz'/ Eichholz
Coteoneater; 1 Gal. Cont. 35 EA $ $
A100 8-02
PS Epimedium x perralchicum 'Frohnleiten'/
Frohnleiten Barrenwort; 1 Gal. Con. 1285 EA $ $
A101 8-02
PS Veronica peduncularis 'Georgia Blue'/ Georgia
Blue Speedwell; 1 Gal. Cont. 380 EA $ $
A102 8-02
PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal.
Cont. 210 EA $ $
A103 8-02 PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal. Cont. 210 EA $ $
A104 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $ $
A105 8-02 Protection of Private Property and Tree Protection 1 LS $ $
A106 8-02 Root Barrier 950 LF $ $
A107 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$
A108 8-02 Plant Establishment - 1 Year 1 LS LUMP SUM $
A109 8-03 Automatic Irrigation System, Complete 1 LS LUMP SUM $
A110 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $$
A111 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $ $
A112 8-04 Extruded Curb 2420 LF $ $
A113 8-05 Wheel Stop 44 EA $ $
A114 8-06 Cement Conc. Driveway Entrance 2060 SY $ $
A115 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $ $
A116 8-09 Raised Pavement Marker Type 1 42 HUND $ $
A117 8-09 Raised Pavement Marker Type 2 11 HUND $ $
A118 8-10 Curb Mounted Delineator Post 330 LF $ $
A119 8-13 Adjust Monument Case and Cover 6 EA $ $
A120 8-14 Cement Conc. Sidewalk 5260 SY $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 17
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A121 8-14 Thickened Edge Sidewalk 320 LF $ $
A122 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $ $
A123 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 4 EA $ $
A124 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $$
A125 8-14 Cement Conc. Curb Ramp, Type Single Direction A 1 EA $ $
A126 8-14 Cement Conc. Curb Ramp, Type Combination 1 EA $ $
A127 8-14 Detectable Warning Surface 460 SF $ $
A128 8-14 Decorative Concrete Finish 400 SY $ $
A129 8-14 Smooth Cement Conc. Band 80 LF $ $
A130 8-14 Bus Shelter Foundation 2 EA $ $
A131 8-19 Adjust Gas Valve 11 EA $ $
A132 8-20
Modification of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 3rd
Street Intersection, Complete
1 LS LUMP SUM $
A133 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 2nd
Street Intersection, Complete
1 LS LUMP SUM $
A134 8-20
Portable Temporary Traffic Signal System with
Mast Arm 1 LS LUMP SUM $
A135 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue S & SW
Victoria Street, Complete
1 LS LUMP SUM $
A136 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & Airport
Way Intersection, Complete
1 LS LUMP SUM $
A137 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue N & NW 3rd
Place, Complete
1 LS LUMP SUM $
A138 8-20 Decorative Illumination System, Complete 1 LS LUMP SUM $
A139 8-20 Fiber Optic Interconnect System, Complete 1 LS LUMP SUM $
A140 8-20 5G Small Cell Network Conduit System, Complete 1 LS LUMP SUM $
A141 8-20 PTZ Camera Systems, Complete 1 LS LUMP SUM $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 18
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A142 8-21 Permanent Signing 1 LS LUMP SUM $
A143 8-22 Plastic Stop Line 90 LF $ $
A144 8-22 Plastic Crosswalk Line 3250 SF $ $
A145 8-22 Plastic Traffic Arrow 72 EA $ $
A146 8-22 Plastic Traffic Letter 12 EA $ $
A147 8-22 Bicycle Lane Symbol 6 EA $ $
A148 8-22 Plastic Line, 4 In.1250 LF $ $
A149 8-22 Paint Line, 4 In.5680 LF $ $
A150 8-22 Removing Existing Pavement Markings 1 LS LUMP SUM $
A151 8-23 Temporary Pavement Marking 59000 LF $ $
A152 8-24 Rock Wall 60 SF $ $
A153 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$
A154 8-26 Utility Potholing 220 EA $ $
A155 8-27 Gateway Trellis Relocation 1 LS LUMP SUM $
A156 8-28 Tree Grate 3 EA $ $
A157 8-30 Waste Receptacle 3 EA $ $
A158 8-31 Bench 2 EA $ $
A159 8-32 Gateway Wall A & B 1 LS $ $
A160 8-33 Bollard 7 EA $ $
Total Schedule A (Roadway Improvements)*$
* All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 19
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
B1 1-04 Minor Change for Water Trench 1 EST 68,000.00$ 68,000.00$
B2 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 54,000.00$ 54,000.00$
B3 2-09 Controlled Density Fill 10 CY $ $
B4 7-08 Shoring or Extra Excavation Class B for Water 1 LS LUMP SUM $
B5 7-09 Abandon Existing Water System 1 LS LUMP SUM $
B6 7-09
Ductile Iron Pipe,Class 52, 6-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
50 LF $ $
B7 7-09
Ductile Iron Pipe,Class 52, 8-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
350 LF $ $
B8 7-09
Ductile Iron Pipe,Class 52, 10-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
100 LF $ $
B9 7-09
Ductile Iron Pipe,Class 52, 12-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
5160 LF $ $
B10 7-09 Bank Run Gravel for Trench Backfill Water 6140 TON $ $
B11 7-09
Removal and Replacement of Unsuitable
Foundation Material 770 TON $ $
B12 7-09 Connection to Existing Water Main, 6 In. 1 EA $ $
B13 7-09 Connection to Existing Water Main, 8 In. 5 EA $ $
B14 7-09 Connection to Existing Water Main, 10 In. 4 EA $ $
B15 7-09 Connection to Existing Water Main, 12 In. 5 EA $ $
B16 7-09
Concrete for Thrust Blocking and Dead-Man
Anchor Block 90 CY $ $
B17 7-11
Corrosion Protection, Pipe Joint-Bonding, Anodes,
Test Stations 1 LS LUMP SUM $
B18 7-12 Furnish and Install 6 In. Gate Valve Assembly 1 EA $ $
B19 7-12 Furnish and Install 8 In. Gate Valve Assembly 8 EA $ $
B20 7-12 Furnish and Install 10 In. Gate Valve Assembly 4 EA $ $
PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4 Page 20
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
B21 7-12 Furnish and Install 12 In. Gate Valve Assembly 22 EA $ $
B22 7-12 Adjust Existing Water Valve Box 16 EA $ $
B23 7-12 Adjust Existing Water Manhole 1 EA $ $
B24 7-12
Furnish and Install Comb. Air/Vacuum Valve
Assembly 2 In.2 EA $ $
B25 7-14 Furnish and Install Fire Hydrant Assembly 25 EA $ $
B26 7-14 Remove and Salvage Hydrant 21 EA $ $
B27 7-15 Furnish and Install 1" Water Service Connection 25 EA $ $
B28 7-15 Furnish and Install 1.5" Water Service Connection 4 EA $ $
B29 7-15 Furnish and Install 2" Water Service Connection 2 EA $ $
B30 7-16 Temporary Water Bypass System, Complete 1 LS LUMP SUM $
B31 8-26
Resolution of Utility Conflicts with New Water
Mains 1 EST 45,000.00$ 45,000.00$
Schedule B Subtotal $
Schedule B Sales Tax (10.1%)$
Schedule B (Water Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule B Contract price per Section 1-
07.2(2) and WAC 458-20-170.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4 Page 21
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
C1 1-04 Minor Change for Sewer Trench 1 EST 30,000.00$ 30,000.00$
C2 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 24,000.00$ 24,000.00$
C3 7-05 Sanitary Sewer Manhole 18 EA $ $
C4 7-05 Drop Manhole Connection 1 EA $ $
C5 7-05 Adjust Sewer Manhole 3 EA $ $
C6 7-08 Shoring or Extra Excavation Class B for Sewer 1 LS LUMP SUM $
C7 7-17 PVC Sanitary Sewer Pipe 6 In. Diam. 106 LF $ $
C8 7-17 PVC Sanitary Sewer Pipe 8 In. Diam. 1160 LF $ $
C9 7-17 PVC Sanitary Sewer Pipe 12 In. Diam. 70 LF $ $
C10 7-17 Bank Run Gravel for Trench Backfill Sewer 4020 TON $ $
C11 7-17 Removal and Replacement of Unsuitable Foundation Material550 TON $ $
C12 7-19 Sewer Cleanout 6 EA $ $
C13 7-21 Furnish and Install 12 In. Diam. CIPP for Sanitary Sewer1910 LF $ $
C14 8-26 Resolution of Utility Conflicts for Sewer 1 EST 20,000.00$ 20,000.00$
Schedule C Subtotal $
Schedule C Sales Tax (10.1%)$
Schedule C (Sewer Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule C Contract price per Section 1-
07.2(2) and WAC 458-20-170.
PROPOSAL (BID SCHEDULE C - SEWER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 22
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
D1 1-04 Minor Change for Joint Utility Trench 1 EST 64,000.00$ 64,000.00$
D2 1-05 Roadway Surveying 1 LS LUMP SUM $
D3 1-09 Mobilization 1 LS LUMP SUM $
D4 2-02 Remove/Abandon Existing Gas Main 960 LF $ $
D5 2-03 Unsuitable Foundation Excavation Incl. Haul 110 CY $ $
D6 2-03 Gravel Borrow Incl. Haul 2700 CY $ $
D7 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 53,000.00$ 53,000.00$
D8 2-09
Structure Excavation Class B Incl. Haul for Joint
Utility Trench 4110 CY $ $
D9 7-08
Shoring or Extra Excavation Class B for Joint Utility
Trench 1 LS LUMP SUM $
D10 8-26 Resolution of Utility Conflicts for Joint Utility Trench 1 EST 42,000.00$ 42,000.00$
D11 8-35 Removal of Structure and Obstruction 1 LS LUMP SUM $
D12 8-35 Franchise Utility Coordination 1 LS LUMP SUM $
D13 8-35 Sand Bedding Incl. Haul for Joint Utility Trench 1900 TN $ $
D14 8-35
Controlled Density Fill Incl. Haul, for Joint Utility
Trench 290 CY $ $
D15 8-35 Install 2" Diameter Conduit - PSE Power 210 LF $ $
D16 8-35 Install 3" Diameter Conduit - PSE Power 1700 LF $ $
D17 8-35 Install 4" Diameter Conduit - PSE Power 8000 LF $ $
D18 8-35 Install 6" Diameter Conduit - PSE Power 5200 LF $ $
D19 8-35 Install Handhole (32"x44") - PSE 6 EA $ $
D20 8-35 Install Handhole (30"x30") - PSE 1 EA $ $
D21 8-35 Install Handhole (23.25"X32.75") - PSE 4 EA $ $
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 23
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
D22 8-35 Install Minipad Transformer (48"x42") - PSE 2 EA $ $
D23 8-35 Install Three Phase Transformer (70"X136") - PSE 1 EA $ $
D24 8-35 Install Three Phase Transformer (56"X66") - PSE 1 EA $ $
D25 8-35 Install Three Phase Junction Box - PSE 9 EA $ $
D26 8-35 Install Three Phase Underground Transformer 1 EA $ $
D27 8-35 Install Pull Vault - PSE 7 EA $ $
D28 8-35 Install Fiber Vault (27"X62.5") - PSE 3 EA $ $
D29 8-35 Install 2" Diameter Conduit - Comcast 970 LF $ $
D30 8-35 Install 4" Diameter Conduit - Comcast 8200 LF $$
D31 8-35 Install Handhole - Comcast 1 EA $ $
D32 8-35 Install 14"x21" Vault - Comcast 1 EA $ $
D33 8-35 Install 17"x30" Vault - Comcast 7 EA $ $
D34 8-35 Install 24"x36" Vault - Comcast 15 EA $ $
D35 8-35 Install 24"x24" Pedestal - Comcast 1 EA $ $
D36 8-35 Install 4" Diameter Conduit - Century Link 24200 LF $ $
D37 8-35 Install 3048 Handhole - Century Link 2 EA $ $
D38 8-35 Install 25-TA Vault - Century Link 4 EA $ $
D39 8-35 Install 264-TA Vault - Century Link 3 EA $ $
D40 8-35 Install 467-TA Vault - Century Link 5 EA $ $
D41 8-35 Install 38Y-612 Base-Military Vault - Century Link 5 EA $ $
D42 8-35 Install 96-612-7-TA Vault - Century Link 1 EA $$
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 24
September 2022
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
D43 8-35 Install Pro 6 Pedestal - Century Link 1 EA $ $
Schedule D Subtotal $
Schedule D Sales Tax (10.1%)$
Schedule D (Joint Utility Trench Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule D Contract price per Section 1-
07.2(2) and WAC 458-20-170.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 25
September 2022