Loading...
HomeMy WebLinkAboutEx44_Advisory_NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA22-000011 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Clark Close, 425-430-7289, cclose@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared. 5. The applicant will be required to comply with all the code requirements of RMC 4 -3-050 Critical Areas. This includes, but is not limited to, placing the critical area within a Native Growth Protection Easement, providing fencing and signage, and providing the City with a site restoration surety device and, later, a maintenance and monitoring surety device. 6. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 7. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. 8. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit. Development Engineering: (Contact: Nathan Janders, 425-430-7382, njanders@rentonwa.gov) 1. See Attached Development Engineering Memo dated September 22, 2022. Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. Environmental Impact Comments: EXHIBIT 44 DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA22-000011 a. Fire impact fees are applicable at the rate of $964.53 per multi-family units, retail is $1.25 per square foot and $0.26 per square foot of office space. No fee for parking garage areas. This fee is paid at time of building permit issuance. Credit is due for the area of existing buildings removed. 2. Fire Code Related Comments: a. The fire flow requirement is 3,250 gpm. A minimum of four fire hydrants are required. One within 150-feet and three within 300-feet of each proposed building. One hydrant is required within 50- feet of all fire department connections for standpipe and sprinkler systems. Existing hydrants may be counted toward the requirements if they meet current code. Fire hydrants shall also meet maximum spacing requirements of 300-feet on center. A looped water main is required for all fire flows over 2,500 gpm. Applicant is showing looped 8-inch water mains on the proposed plans and they were told that minimum 12-inch size water mains would be required on this site in order to meet fire flow demands. Looped main shall extend along the entire south side of Building 2 and connect at Lake Washington Boulevard. Looped main may also be required around Building A pending detailed building plans. b. Approved fire sprinkler, fire standpipe and fire alarm systems are required throughout the building. Separate plans and permits required by the fire department. Direct outside access is required to the fire sprinkler riser room. Fully addressable and full detection is required for the fire alarm system. c. Fire department apparatus access roadways are required within 150 -feet of all points on the building. Fire lane signage required for any on site roadways. Required turning radius are 25-feet inside and 45-feet outside. Roadways shall be a minimum of 20-feet wide. Roadways shall support a minimum of a 30-ton vehicle and 75-psi point loading. Minimum vertical clearance is 13-feet, 6- inches. Fire lane signage required per code. Any propose restricted access gating systems shall meet all fire department specifications for automatic opening gates. d. This facility shall be equipped with an elevator to meet the size requirements for a bariatric size stretcher. Car size shall accommodate a minimum of a 40-inch by 84-inch stretcher. e. The building shall comply with the City of Renton Emergency Radio Coverage ordinance. Testing shall verify both incoming and outgoing minimum emergency radio signal coverage. If inadequate, the building shall be enhanced with amplification equipment in order to meet minimum coverage. Separate plans and permits are required for any proposed amplification systems. Technical Services: (Contact: Amanda Askren, 425-430-7369, aaskren@rentonwa.gov) 1. No comments at this time. Community Services: (Contact: Erica Schmitz, 425-430-6614, eschmitz@rentonwa.gov) 1. Parks Impact fee per Ordinance 5670 applies. Police: (Contact: Cyndie Morris, 425-430-7521, cmorris@rentonwa.gov) 1. No comments at this time. Building: (Contact: Rob Shuey, 425-430-7290, rshuey@rentonwa.gov) 1. Recommendations of the geotechnical report must be followed as a condition of building permits. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: September 22, 2022 TO: Clark Close, Principal Planner FROM: Nathan Janders, Development Engineer SUBJECT: Kennydale Gateway 4350 Lake Washington Blvd N LUA22-000011 I have reviewed the application for the Kennydale Gateway project located at 4350 Lake Washington Blvd N and have the following comments: EXISTING CONDITIONS The site is comprised of existing parcel 3224059049, is approximately 312,776 square feet in size and is triangular in shape. The site currently contains existing structures and is used by the WSDOT contractor constructing the I-405 expansion for construction trailers and laydown. The site is fronted by Lake Washington Blvd N to the west, I-405 to the east and private property to the south. WATER: The proposed development is within the City’s water service area and in the Kennydale 308 pressure zone. There is an existing 12-inch water main in Lake Washington Blvd N (Record drawings: W-353102, W-353103) that can deliver a maximum flow rate of 3,700 gallons per minute (GPM). There is an existing 12-inch water main located in an easement on the property (record drawing: W-0400C) that can deliver a maximum flow capacity of 2,800 GPM. The static water pressure is approximately 118 PSI at a ground elevation of 35 feet. SEWER: The proposed development is within the City’s sewer service area. There is an existing 12-inch gravity wastewater main on the parcel (no record drawing available). There is an existing King County Interceptor line along the southern property line. STORM: There is an existing 24-inch stormwater main on the east side of Lake Washington Blvd N (see record project file SWP-27-3751). There is an existing water quality facility within an easement (KC recording number 20110307001402) in the southwest corner of the property. The site generally slopes from the northeast to the southwest. STREETS: The proposed development fronts Lake Washington Blvd N along the west property line. Lake Washington Blvd N is classified as a Collector arterial street. Existing right-of-way (ROW) width, according to the King County Assessor Map, is 60 feet. There is an existing curb and gutter along the entire frontage and, along a portion of the southern frontage, there is a sidewalk (approximately 12 ft wide) and planting strip (approximately 3-8 ft wide). DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 2 of 7 September 22, 2022 WATER 1. Civil plans for the water main improvements are required and must be prepared by a professional engineer registered in the State of Washington. Refer to City of Renton General Design and Construction Standards for Water Main Extensions as shown in Appendix K of the City’s 2019 Water System Plan. Adequate horizontal and vertical separations between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the water main. Retaining walls, rockeries or similar structures cannot be installed over the water main unless the water main is installed inside a steel casing. 2. There are five existing fire hydrants within 300 feet of the property along Lake Washington Blvd N and three existing hydrants on the property. 3. Based on the review of project information submitted, Renton Regional Fire Authority has determined that the fire flow demand for the proposed development is 3,250 GPM. 4. Projects that have a fire flow in excess of 2,500 GPM require a looped water main around the building. Public water mains on private property require a 15-foot public easement centered over the pipe and the building must be set back 10 feet from the water main. The proposed plan depicts an 8-inch water main within a portion of the internal access road tying into the existing main in Lake Washington Blvd N near then new site entrance, looping around building 3, and connecting into the existing on-site main in the southeast corner of the parcel. a. Conceptually, the three proposed connection points to the existing system are acceptable. b. The new on site main is shown to be 12-inch which is acceptable. c. A looped water main is not shown around building 1, however, per preliminary review RRFA has determined that the flow rate for building 1 is 2,250 GPM thus a looped main is not required. If the building changes and RRFA determines that the flow rate necessitates a looped water main, note that the current building layout does not facilitate installation of it as the proximity of the building to the eastern property line does not provide sufficient space for the required easement (15 feet) or building setback (10 feet). 5. Installation of a separate domestic water service and meter is required for the residential portion of each new building. The sizing of the meter shall be in accordance with the most recent edition of the Uniform Plumbing Code. All residential domestic water meters shall have a double check valve assembly (DCVA) installed behind the meter on private property per City Standards. The DCVA may be located inside the building if the location is pre-approved by the City Development Engineer and City Water Utility Department. The backflow prevention assembly must be located adjacent to and behind a building exterior wall. a. The proposal does not depict domestic water services, meters or backflow prevention; these utilities shall be shown on the utility plans submit for a civil construction permit and, if applicable, the building permit(s). 6. Meter sizing shall be based on Uniform Plumbing Code meter sizing criteria. Sizing calculations shall be provided to the City. Meters 3” or larger, shall be installed in a concrete vault located outside of the building per COR Standard Plan 320.4. By-pass piping, valves, and associated piping shall be purchased and installed by the developer / contractor under City observation for meters DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 3 of 7 September 22, 2022 3” or larger. The meter vault shall be located within public ROW or within an easement on private property. 7. Installation of a separate water meter for the commercial portion of each new building. All commercial domestic water meters shall have a reduced pressure backflow assembly (RPBA) installed behind the meter on private property per City Standards. The RPBA shall be installed inside an above ground, heated enclosure per City Standard Plan 350.2. The RPBA may be located inside the building if a drainage outlet for the relief valve is provided and the location is pre- approved by the City Plan Reviewer and City Water Utility Department. The backflow prevention assembly must be located adjacent to and behind a building exterior wall. a. The proposal does not depict commercial water services, meters or backflow prevention; these utilities shall be shown on the utility plans submit for a civil construction permit and, if applicable, the building permit(s). 8. Per the Uniform Plumbing Code a pressure reducing valve (PRV) is required downstream of the water meter(s) because the water pressure is over 80 psi. 9. The existing water main on property must be protected during the demolition of the existing building(s) and construction of the new development unless it is designated for demolition and disconnected from the active water main. For that portion of the existing water main that are proposed to be removed the applicant shall request the City to grant a partial release of the existing easement. a. A request to release the existing easement including the release or partial release of easement document shall be provided with the civil construction permit application. The release of an existing public easement is a public process requiring City Council approval. The full process outline can be found at: https://edocs.rentonwa.gov/Documents/DocView.aspx?id=8461955&dbid=1&repo=Ci tyofRenton 10. The existing 1-inch service shall be cut and capped at the main by City of Renton forces. A separate water permit is required. 11. Installation of a fire sprinkler stub a with a detector double check valve assembly (DDCVA) is required for backflow prevention to each building. The sizing of the fire sprinkler stub and related piping shall be done by a registered fire sprinkler designer/contractor. The DDCVA shall be installed on the private property in an outside underground vault per City Standard Plan 360.2. The DDCVA may be installed inside the building if it meets the conditions per City Standard Plan 360.5 for the installation of a DDCVA inside a building. The location of the DDCVA inside the building must be pre-approved by the City Plan Reviewer and Water Utility. a. Proposal does not indicate installation of a fire service. Fire service to each building shall be depicted on the utility plans submit with the civil construction permit. If the applicant is proposing to install the DDCVA internal to the building an architectural plan shall be included with the civil construction permit such that the City can verify the location of the DDCVA. 12. Installation of off-site and on-site fire hydrants. The location and number of hydrants will be determined by the RRFA based on the final fire flow demand and final site plan. A hydrant is required within 50 feet of the building’s fire sprinkler system fire department connection (FDC). a. Applicant should verify proposed fire hydrant locations will be within 50 feet of the FDC and comply with RRFA requirements for spacing and building proximity. Proposal does not indicate location of FDC’s on each building. Applicant shall show the proposed location of each buildings FDC on the utility plans submit with the civil construction permit. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 4 of 7 September 22, 2022 13. The development is subject to applicable water system development charges and meter installation fees based on the size of the water meters. Current fees can be found in the 2022 Development Fees Document on the City’s website. Fees will be charged based on the rate at the time of Civil Construction Permit issuance. a. The SDC fee for water is based on the size of the new domestic water to serve the project. The 2022 water fee is $4,500.00 per 1-inch meter, $22,500 per 1-1/2 inch meter, $36,000 per 2-inch meter, $72,000 per 3-inch meter, and $112,500 per 4-inch meter. b. Drop-in meter fee is $460.00 per 1-inch meter, $750 per 1-1/2 inch meter, and $950 per 2-inch meter. For meters larger than 2-inch, a $220 processing fee is applied and the applicant must provide materials and installs. c. The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/browse.aspx?id=8217302&dbid=1&repo=Cityo fRenton SEWER 1. The development is proposing a new 8-inch sewer main extension to service the property. With exception to a small portion of main connection to the King County Metro system (see comment 5.b for more information) the on site system shall be private. Private systems shall be designed and installed in accordance with City and Department of Ecology standards. 2. Individual sewer stubs from the sewer main and individual side sewers are required for the commercial and residential uses of each building. All new sewer stubs shall conform to the standards in RMC 4-6-040 and City of Renton Standard Details. a. The proposal does not depict sewer stubs. Stubs shall be shown on the utility plans submit for a civil construction permit. 3. An oil/water separator (OWS) will be required for connecting the covered parking lots to sewer. If a sub-terrain parking is incorporated and cannot achieve a gravity sewer discharge to the main, the applicant may need to install an internal pump to bring the basement garage flows to the surface level for gravity drain to the side sewer. a. The proposal depicts covered parking on the first floor of each building but does not depict an OWS or connection to the sewer system. Facilities shall be shown on the utility plans submit for a civil construction permit including a separate document with calculations for sizing of the OWS(s). 4. A grease interceptor is required on services line(s) if a commercial kitchen is proposed. 5. A 15-foot public utility easement is required for public sewer on private property. An easement over the existing sewer main from its connection point with the King County Interceptor Line and the existing City Manhole (facility ID MH4779) is required as a condition of approval for the issued civil construction permit C21000235. a. The proposal depicts a connection to what is shown on the survey as an existing sewer line, however, the sewer is not owned by the City of Renton. Private developments are not allowed to connect directly to King County Metro. The applicant must connect to the City of Renton sewer which is then connected to the King County Metro system. b. If feasible, applicant shall revise the sewer connection such that it connects to the existing City of Renton 8-inch wastewater main on site. A connection at either the existing manhole (facility ID MH4779) or a new manhole located between the King County Metro line and MH4779 is preferred. The sewer upstream of the last manhole prior to connecting to the King County Metro line shall be private. If a connection to the existing City system is not feasible applicant shall contact the City plan reviewer for design development and coordination. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 5 of 7 September 22, 2022 c. If the proposed structures reside over the easement, then a release or partial release of easement will be required. An additional easement may be required such that access to the sewer system from Lake Washington Blvd N is provided. 6. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for sewer is based on the size of the new domestic water to serve the project. Current fees can be found in the 2022 Development Fees Document on the City’s website. Fees will be charged based on the rate at the time of construction permit issuance. a. The current sewer fee is $3,500.00 per 1-inch meter, $17,500 per 1-1/2 inch meter, $28,000 per 2-inch meter, $56,000 per 3-inch meter and $87,500 per 4-inch meter. b. The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/browse.aspx?id=8217302&dbid=1&repo=Cityo fRenton STORM DRAINAGE 1. A geotechnical report dated May 20, 2021, completed by Hart Crowsler, was provided with the Land Use Application. The report discusses the soil and groundwater characteristics of the site and provides recommendations for project design and construction. a. The report identifies a shallow groundwater table of approximately 2-5 feet below ground surface and does not recommend on site infiltration. 2. Core Design, with the Land Use Application, submitted a Preliminary Drainage Plan and Technical Information Report (TIR), dated November 12, 2021. Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard Matching Existing Site Conditions and is within the Lower May Creek Drainage Basin. The report is based on a Full drainage review and the nine Core Requirements and the six Special Requirements have been discussed in the Technical Information Report. a. General: The following general comments shall be addressed as part of the Civil Construction Permit Application: b. General: The TIR has been prepared in accordance with the 2017 RSWDM. Effective June 22, 2022 the City of Renton adopted a new stormwater manual that is based on the 2021 King County Surface Water Design Manual. The project is not vested to the 2017 RSWDM and must therefore comply with the 2022 RSWDM. i. The TIR submit with the civil construction permit shall be updated such that it is compliant with the 2022 RSWDM. c. Offsite Analysis, RSWDM Core Requirement #2: All proposed projects must submit an offsite analysis report that assesses potential offsite drainage and water quality impacts associated with development of the project site and the initial permit submittal shall include, at minimum, a Level 1 Downstream Analysis. A level 1 downstream analysis has been included. i. The downstream analysis includes a resource review but does not include a review of the Department of Ecology section 303d list. The proposed plans outfall to May Creek within ¼ mile of the site and May Creek is listed as a category 5 and 2 waterbody on the 303d list. The TIR submit with the civil construction permit application shall include a review of the 303d list and applicable water quality mitigation measures. d. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 6 of 7 September 22, 2022 of civil construction permit application. The project is claiming to be exempt due to the 0.15 CFS increase exemption. i. Staff concurs with the exemption. e. Conveyance, RSWDM Core Requirement #4: All new conveyance systems constructed as part of the project must be sized to meet RSWDM standards for the total tributary area (onsite and offsite) that the storm systems serve. The proposal depicts an two on site systems conveying stormwater from the lot directly to the existing conveyance system in Lake Washington Blvd N in two locations. The preliminary TIR states that a conveyance capacity analysis will be addressed during final design. i. A conveyance capacity analysis shall be included with the TIR submit as part of the civil construction permit. f. Construction Stormwater Pollution Prevention, Core Requirement #5: The proposal does not include a CSWPP and ESC plan. The preliminary TIR states that these plans and reports will be addressed during final design. i. A CSWPP and ESC plan shall be included with the TIR and utility plans submit as part of the civil construction permit. g. Maintenance and Operations, Core Requirement #6: The proposal does not include a maintenance and operations manual. The preliminary TIR states that this will be addressed during final design. i. A maintenance and operations manual shall be included with the TIR submit as part of the civil construction permit. h. Water Quality, RSWDM Core Requirement #8: All projects that add more than 5,000 square feet of pollution generating impervious surface (PGIS) that is not fully dispersed and less than 0.75 acre of pollution generating pervious surface that is not fully dispersed require water quality. The preliminary TIR indicates that more than 5,000 square feet of PGIS will be added and is proposing to use biopods to provide the required enhanced basic water quality treatment. i. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be required to help mitigate the new runoff created by this development. The preliminary TIR indicates that BMP’s will be designed during final engineering. i. An analysis of BMP per section 1.2.9.2.2 shall be provided with the TIR submit as part of the civil construction permit. Analysis shall identify feasibility of each BMP and if infeasible cite specific infeasibility criteria. 2. The development is subject to a surface water system development charge (SDC) fees. Fees will be charged based on the rate at the time of construction permit issuance. a. The 2022 SDC fee is $0.84 per square foot of new impervious surface but not less than $2,100. TRANSPORTATION/STREET COMMENTS 1. Sites that generate 20 or more net new peak hour trips (either in the AM peak or PM peak) are required to do a traffic impact analysis. The trips should be calculated based on the guidelines of the current ITE Trip Generation Manual. Refer to the attached policy guidelines for traffic impact analysis for guidelines. If the site generates 20 or more new peak hour trips in either AM peak or PM peak, then applicant should contact the City to get information of the locations where traffic analysis is required. a. A TIA dated June 14, 2021 and a memorandum dated March 3, 2022 was prepared by Heffron Transportation Inc. and submit with the land use application. The TIA discusses DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 7 of 7 September 22, 2022 traffic impacts and how the proposed project traffic volumes relate to the traffic volumes assumed by WSDOT as part of the TIA prepared for the I-405 expansion and N 44th St. interchange, which included the Gateway project, at a study year of 2025. The report evaluates the Level Of Service (LOS) analysis conducted by WSDOT and adjusted the WSDOT data for the Gateway project to reflect the single lane roundabout and project traffic volumes (The WSDOT report assumed a two lane roundabout and a park- n-ride at the Gateway site). In the WSDOT report, multiple intersections along Lake Washington Blvd N/NE 44th Street were studied including the Gateway project entrance at the Lake Washington Blvd N/N 43rd Street intersection. WSDOT is funded and actively constructing improvements along Lake Washington Blvd N/NE 44th Street east of the Gateway project entrance at Lake Washington Blvd N/N 43rd Street; therefore, the report assumed built conditions for these intersections, which are shown to operate at a LOS of B or better, and concluded no further mitigation was needed. As noted above, the TIA had adjusted the Lake Washington Blvd N/N 43rd Street intersection at the Gateway project entrance; therefore, this intersection was specifically evaluated. The report concludes that a single lane roundabout will operate with a LOS of B or better and should be installed. Further, neither the TIA dated June 14th nor the WSDOT report evaluated intersections West of the Gateway entrance; however, the TIA was supplemented with a memorandum dated March 3rd that included a study of the intersection at Lake Washington Blvd N/N 41st Street. The memorandum concludes that the existing LOS for the subject intersection, C, will remain unaffected by the project and no mitigation is necessary. b. The City contracted TranspoGroup to provide secondary review of the TIA, including the March 3rd memorandum and referenced WSDOT reports. TranspoGroup reviewed the documents providing review comments in a letter dated July 20, 2022. The TranspoGroup comments were provided to Heffron Transportation Inc. who provided both a comment response letter and revised TIA, both dated August 15, 2022. These August 15th files were provided to TranspoGroup who provided, in an email dated August 30, 2022, verification of concurrence with the TIA results. c. The mitigation measure is to install a single lane round-a-bout at the projects entrance which is depicted in the conceptual utility plans. i. The TIA indicates that the intersection at Lake Washington Boulevard N/Seahawks Way is a right-in-right-out configuration evidenced by Table 4, Figure A-2 and Figure A-3. Therefore, staff recommends as a condition of approval that the Lake Washington Boulevard N/Seahawks Way intersection be modified such that it is of a right-in-right-out configuration. A design for the intersection improvements shall be included as part of the construction drawings submit with the civil construction permit application. d. Staff has recommended to the ERC committee further evaluate potential impacts at the proposed round-a-bout and consider both the addition of a northbound approach lane and travel lane in the round-a-bout along with the addition of a southbound dedicated right turn lane. This recommendation is made due to the travel lane configuration shown in the current WSDOT approved for construction drawings, the queuing length and delay at Lake Washington Blvd N/N 43rd Street, and the volume of traffic added by the project. i. Current approved for construction drawings for the WSDOT I-405 widening project dated 4/12/2021 show that Lake Washington Blvd N (or N 44th St) will consist of two travel lanes in both the northbound and southbound direction. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 8 of 7 September 22, 2022 The southbound configuration has a dedicated right turn onto N 43rd St while the northbound configuration widens from a single lane to two lanes at the N 43rd St intersection (See Figure 1). WSDOT’s July 2018 study ‘I-405 Renton to Bellevue – NE 44th Street intersection Control Analysis Report’ assumed a multilane round-a-bout configuration at the Lake Washington Blvd N/NE 43rd St intersection (see Figure 4: NE 44th Study Intersection Control and Channelization-Roundabouts Alternative) and conversion of the Lake Washington Blvd N/Seahawks Way intersection to a right-in-right-out configuration; However, the report states that the intersection improvements at these two locations would be constructed at a future date which is evidenced by the construction drawings in Figure 1. A measure of intersection adequacy is the Level Of Service (LOS) measured by average vehicle delay and average queuing distance. Within the WSDOT report the LOS at the subject intersection is shown to be A in both the AM and PM at a horizon year of 2025 and 2045. Of note the LOS analysis shows a delay of 8.9/(7.0) and 8.9/(11.4) seconds (AM/(PM)) in the northbound and southbound directions of Lake Washington Blvd N respectively. Further the WSDOT report shows that the 95th percentile queuing length along Lake Washington Blvd N is 100 feet in both the northbound and southbound directions during the AM and PM hours. This queuing length will not pose a physical impact or queuing problem to any of the adjacent intersections and the delay is acceptable per the City’s comprehensive plan. The TIA prepared by Heffron Transportation Inc dated August 15, 2022 concludes that a single lane round-a-bout will provide a LOS A in the horizon year of 2025 with a delay of 15.3/(1.9) seconds and 1.3/(3.4) seconds in the northbound and southbound directions of Lake Washington Blvd N respectively. Further the Heffron TIA shows that the 95th percentile queuing length along Lake Washington Blvd N is 391/(48) feet (AM/(PM)) and 33/(134) feet in the northbound and southbound directions of Lake Washington Blvd N respectively. This queuing length will not pose a physical impact or queuing problem to any of the adjacent intersections and the delay is acceptable per the City’s comprehensive plan. Staff is recommending that the ERC committee evaluate the addition of a northbound approach lane and travel lane within the round-a-bout. The Heffron Transportation Inc. TIA indicates one (1) net new AM trip and five (5) net new PM trips northbound into the subject intersection. Estimated horizon year trips northbound on Lake Washington Blvd N total 791 AM and 293 PM with 750 AM and 218 PM passing through the intersection continuing northbound. This indicates that the vast majority of trips at the intersection are background from the surrounding neighborhood. In the current configuration on Lake Washington Blvd N the subject intersection is stop controlled along N 43rd such that travelers on Lake Washington Blvd N are able to travel uninterrupted. With the addition of a single lane round-a-bout as proposed, vehicles will experience a queuing of 391 feet and a delay of 15.3 seconds. To mitigate the delay encountered by local residents using Lake Washington Blvd N the addition of a second lane would result in a queuing of 100 feet and a delay of 8.9 seconds. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 9 of 7 September 22, 2022 The second lane would allow traffic to move through the round-a-bout quicker with less perceived delay due to long que lengths. Further, given that the WSDOT for construction drawings have two northbound lanes starting at the subject intersection, a second lane within the intersection would provide for a smooth transition to the network currently under construction. The length of a second approach lane will need to be analyzed and presented to the City for review and final approval. Staff is also recommending that the ERC committee evaluate the addition of a southbound dedicated right turn lane within the round-a-bout. This would provide the same volume of travel lanes currently under construction by WSDOT but convert them to a round-a-bout configuration at the intersection. A slight decrease in queuing length and no marginal change to delay would be experienced by vehicles. 2. Frontage improvements are required for all new construction with valuation in excess of $150,000. The proposed development fronts Lake Washington Blvd N along the west property line. a. Lake Washington Blvd N is classified as a Collector Arterial street with an existing right-of- way (ROW) width of approximately 60 to 150 feet. To meet the City’s complete street standards for Collector Arterial streets with 2 lanes a minimum ROW width of 83 feet is required. Per RMC 4-6-060 half of street improvements as taken from the ROW centerline include a minimum 46 foot paved road (23 feet each side), a 0.5 foot curb, an 8 foot planting strip, an 8 foot sidewalk, 2 foot clear space at back of walk, street trees and storm drainage improvements. Dedication of approximately 11.5 feet would be required pending final survey. i. However, with the development of the NE 44th St Interchange by WSDOT, an alternate street section has been designated for this section of Lake Washington Blvd N. North of the round-a-bout, minimum half street improvements shall consist of a 32 foot paved roadway (16 feet from centerline) consisting of an 11 foot travel lane and 5 foot bike lane, a 0.5 foot curb, an 8 foot planting strip, a 12 foot sidewalk, street trees and storm drainage improvements. South of the round-a-bout, minimum half street improvements shall consist of a 32 foot paved roadway (16 feet from centerline) consisting of an 11 foot travel lane and 5 foot bike lane, a 0.5 foot curb, an 8 foot planting strip, a 12 foot sidewalk, street trees and storm drainage improvements such that it aligns with the existing street frontage at the southwest corner of the property. Dedication will be required to install the improvements and proposed round-a-bout as determined required by survey. A street modification will be required for the roadway section. 1. Proposal includes a modification for the alternate street section. Staff has reviewed the modification and recommends approval. 2. The proposal shows, north of the roundabout, frontage improvements connecting to the WSDOT improvements within the Gateway projects frontage. A portion of the WSDOT improvements in Lake Washington Blvd N are along the Gateway projects frontage. If the improvements installed by WSDOT do not meet the prescribed improvements as listed above, the developer shall install improvements consistent with those listed above. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899 Kennydale Gateway – LUA22-000011 Page 10 of 7 September 22, 2022 3. The proposal indicates, south of the roundabout, frontage improvements consisting of an 8-foot planter and 8-foot sidewalk. Developer shall install improvements consistent with those listed above. 3. Street lighting improvements are required for projects consisting of more than four (4) residential units. See RMC 4-6-060 for street lighting requirements. a. The proposal does not indicate installation of street lights or provide a photometric analysis. A photometric analysis shall be included with the civil construction permit application demonstrating compliance with the standards listed in RMC 4-6-060.I. The installation of street lights will be required to comply with the illumination standards for Collector Arterial streets. 4. Refer to City code 4-4-080 regarding driveway regulations. a. A minimum separation of 5 feet is required between driveway and the property line. b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide slotted drains. c. The width of any driveway shall not exceed 30 feet exclusive of the radii of the returns or the taper section. d. There shall be no more than one driveway for each 165 feet of street frontage. 5. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4-6-090. 6. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Restoration and Overlay requirements. 7. The development is subject to transportation impact fees. Fees will be charged based on the rate at the time of building permit issuance. a. The 2022 transportation impact fee for apartments is $6,717.10 per dwelling and shopping center use is $26.58 per square foot. b. Unless otherwise noted on the fee schedule, the 2022 transportation impact fee is $7,145.85 per net new PM peak hour person vehicle trip. DocuSign Envelope ID: AB259DAD-E1F4-4927-9B6D-D48F19435899